ebook img

CH Realty VI-Grey Star MF, Tysons Elan LLC PDF

72 Pages·2016·59.41 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview CH Realty VI-Grey Star MF, Tysons Elan LLC

APPLICATION ACCEPTED: January 13, 2016 PLANNING COMMISSION: May 25, 2016 @ 8:15 p.m. Co un ty of F air f ax , V ir g in ia May 11, 2016 STAFF REPORT CSP 2010-PR-014-02 PROVIDENCE DISTRICT APPLICANT: CH Realty VI-Grey Star MF, Tysons Elan LLC ZONING: PTC, SC, HC LOCATION: 1521 Boyd Pointe Way PARCEL(S): 29-3 ((32)) 2A and 3 ACREAGE: 1.58 acres PLAN MAP: Transit Station Mixed Use PROPOSAL: Comprehensive Sign Plan associated with RZ/FDP 2010-PR-014D STAFF RECOMMENDATIONS: Staff recommends approval of CSP 2010-PR-014-02 subject to the proposed development conditions in Appendix 2. It should be noted that it is not the intent of staff to recommend that the Planning Commission, in adopting any conditions, relieve the applicant/owner from compliance with the provisions of any applicable ordinances, regulations, or adopted standards. It should be further noted that the content of this report reflects the analysis and recommendation of staff; it does not reflect the position of the Planning Commission. Casey Gresham Department of Planning and Zoning Zoning Evaluation Division 12055 Government Center Parkway, Suite 801 Fairfax, Virginia 22035-5509 Excellence * Innovation * Stewardship Phone 703-324-1290 FAX 703-324-3924 Integrity * Teamwork * Public Service www.fairfaxcounty.gov/dpz/ The approval of these applications does not interfere with, abrogate or annul any easement, covenants, or other agreements between parties, as they may apply to the properties subject to these applications. For information, contact the Zoning Evaluation Division, Department of Planning and Zoning, 12055 Government Center Parkway, Suite 801, Fairfax, Virginia 22035-5505, (703) 324-1290. O:\cgresham\Applications\!RZ_SE Cases\CSP 2010-PR-014-02 Adaire Grey Star\CSP 2010-PR-014-02 Grey Star Adaire Cover.docx Americans with Disabilities Act (ADA): Reasonable accommodation is available upon 48 hours advance notice. For additional information on ADA call (703) 324-1334 or TTY 711 (Virginia Relay Center). Comprehensive Sign Plan CSP 2010-PR-014-02 CH REALTY VI - GREY STAR MF, TYSONS ELAN LLC ws PikeVVVVVV3VVV2VVVVVVVVVVVVVVV3V1VVVVVVVVVVVVVVVV2V0VVVVVVVVVVV3V9VVVVVVVV1V37V9VVVVVVVVVVV1VV8VVVV1VVV7VVV1V6VVV14V35VVV1V4V3V3VBVV1lVvV53Vd3V21.VVVV2V9VVVVV91VVV13V1VV274VVVVVVVV2V952VVV2102V2V12V3AVVVAirVVVipr11VVpo9V1rVoVVtrV1tVV0V1V7V1V4V15VVVVVF.P.L.9VVVVVV8VVVVVVVVVVVVSVVVVMVVVVVCVSVVVVEVMVVIVCVVcVVV.LVV V2F.VPE.VL.VVVVAVVVNVVVVVVVVVVVVVVVVVVVVVVVVVV5VVV6VVV(VV(V1V54CVV52VVVo75Lewinsville 6MemVVVRt. 10481VVVm53VV4Vo55VVVnwVVV2eVVV3LaEWINSVVIVLVLEMElWStVVhVVVVVVVVVVVVV)V)2VVV1VVTVVAVOVVVLLVVVVVVVVVRVVVPOINT-!STONYVVV!1!!!!VV!V!S(.!VDVV(.4!E15.BV!AVV!!!!O!!0!VV28V!530!0VOVV0VTVA4ynotVSPVoHVintV.tCVVV85301VVVA1VVV03VVV2VVVVVVVVTVoVVVllVVBVDVVoV(fVVV(C24VVV.EVVV4R.VVV3-VCVV1A5C.VV66EV.2E.VVV166.84VVVVVVH62aVr6VVd9isCoVVnV1 36 60 7 66 5 VVLVn.VVV63VVV7V1VV3V6814iVVVrBg0VV9EViLAnLVVV1M4iEa10V30VV5A10RDBGoVEr2V dV o4 n- CIVI-V11VL13n4D..9VEVAVGor.RdV4oV1nVR3t4. 0453V-0O4L9VnV3.0d3V1r3V3Vi01c7R1tVk.3 4V316V'4As93V 3LVVn9V4.V2VV333VVR83V7VtV. B3VVV498V3VV540VV3V(V5V2(V33(V.0AV6V335V44VV4- VVDVDCSVV/VRUOUVVV)-DBVV0VRDV0RII9VC-*IK1S'SION TYSON'S V(W((((I(L8RE0LS--AWC1HTGe(-65 1i- é g88s00(Wé1çDD3tDDDD3dEçç DD DD -D çDD 7 DD!7VVDDDçç41wD8DD2DçDDDDoçD(!é68DDçDDDDDDDççDDD08VVDDç!nDD2DDD9oçDDçDODD0DDçDDD3!AçDDDçDDDDDVVçDD2éDDç!Do*DDDDçéDDDDDDçD!!!!sDDDD!çDçDDVVDFdDDDçODDD!-DDDDç.DDDçDDDç!hP9DDDDDçCDDVVDDDDç!.DDDéDDDDçL0çDDDD!DgDDçDDDDD.DçVVéDDD!DçDDDDçD-DDDDçDDr!DDDDDçDDDDDçVVçDDD0!DDoéDç!DDDDDDDçDDDDç!çDDDDDD9DDçVVD1DDv5DD!DDDçDHDDDDççDDD1D1DDç!DDéDDeVVDDDçéDDDDDç7!DDDçDD!DDçBDDD-DDçDDD8D VV!DDçDçDDDDDDç6DDCDLDDç!DDDDDTD11DDDDéVVçDDD6!DSDDDD4!DDn0DDDD!D!!DDD4çDDDéDD.DD!!VVD!DD!DD!!YDDDDD.DD!DçDDDD0DDDDCé2DDD!9DDDDD.DDD8CçDD!EDDDDPDDçDDDDDDDDN!DSDDe5DoçDDDP.DDDDç0!DODDDDDDDéDéu!DDçnDADDDDDDçDDD!DDDDD1rDD-DOODD6ç!SDD8tDDDRçtDD0DDDhhDD6C8DDDDDeDDDeçDDDçé0DDLDDoDKrDDDDaDDD8DDDrçDçtDDDDuDDPDDoN-DéIDDDDDDDnDDsDççDDNDDDDD0DéDDDDeDDDDDTDDççDDDDDDyGDD2DDDDDsS7DDDDDçDDoçDDDDDDDDDDDnDDDDPDDçéDDsçDéDD2DDDDDDDDDDDDDD çDDDçDDDDDDDDCD*DDDDWçDDDDDçDDDDDDDéDDDDrDDD.DDDçDDDDçDDDDADD8DD0DDD6DDPCçéDDDD2D7DD6çDDDDsDDDD1DéDDEçDDDDD D-çDDLDDhDDDTDDDDEDDC5çDDDDDD9DDEçDDDDgDDDDSDçDD3DDDDDDCSDBéçDD2DrDDD2DD-éDDUçDP7DDDDDoDDDRçDDDD1çDDD4DD1çDDDADDGD-DDDDvçDT5çDDD DDDDDPçéDDçD9CDDR08DDeDDDDIDçDDKçD5DDDçDDDDEDçDD DDDDDKçD42éDDDDLçDDD-DDDDDDDéççIn0ç-FNçç..1CP3çç1G1(éç51.ç0é(9Lç3-52çC3ç.-0ç*éç8HçB6-ç5ç0çD54165éç0çM06éPçç3r1ç4.A4çç1-7çéRç0ç2éççKç3ççI2éCçNç23oçrLn2çeçGr*sééççidCçe 1ç ç B05çl3vç9d2éç.R3ççtç1éç.5ç é97ççC1çç4ç1ççoéVF6çCé1çoPmçRSoaççço-f1-çrptéç50.Hmç. 11rw81HçPç 5iç62ç8ée3ççF-01n.T7MçréCçç8-ogC4LPç-çH8rçO8ç-H6 çé1çOç0çP8ç0éçM-eAL8ççççMç6Tçç10ç56iéççSCçr-çç2çe-çpçpç0ççCç0çér0é8çoç26iç1çnç02sçrç1çg2t-é7çççb*çé7ç2ç1çéç1çGu6ç01Cççé3Eéççr-çSç-ç7çégCPçC2ççIHR(éçR1-ç-Céi (çl4ç-75lçP-ç118ç1601é0çE5ç0é8aç5ç0sçi1çéeç48k51ç19çm8çç-eé7éçeRçnHççtAçç-ééMç5çS1Içç5Pç-ç2B-éé18ç4R15Bç0(ç8F735-rçI8(174ç-6Na25é0é32çç8Bn8-1GçF5çW619c1CH13ç0ç-To 5héé-8Hçy5160ç4rB0H0ç3cM04I çLç8oP-0é é5TçCç2LT5-R-çç 5A1M0dçPC1ç.é1éyç7ç7E(-1çR7ç(4T7Sç5cé33ç0I8çBRP5-3-ç-5Rç00OCRçç5oé4d2I4.5çç 80S1B8ç-N6ço0çT4 é0y4C4BçAGdçA BPRç5ç4To--ç6Cçç1THiéCnçI3I59-ytçOeç715Lç c-5Wç*5-82dN7çL21éoaç.L.P.FC87çyç6562ç1ç0FççéAC#.381-P2R5çç.A35BLC86ç.B05A-3ç-é36-7-S---ç5141451Tç0P573é507ç33AI82RçTA64-ççIBç-0ççççç42ççéçPRçççç-ç8-OçFç4ç5çç*2çç20çD3ççdçSç7Ro7çNçççéCçççç.çAç1çrçç55ç-ççCçç çç-ççPç-ç40ççççç07ç8é5206ç(çç8ççTççç28524Aç28852Pç8 DA-çG85ç5214BççMç8CççL59ççé2ç0ççPçeçç64çç*çIçç-eT4ROçB-145s-8éçSb535COt)17-u1C.ç(4T52eY5C rA1O 1LR1OgçA-AKD6é L8AN0e15D COç57N-DO8MIN2IB2U3M 7ç08A53Cé41ç5157-AA501ç146A9(é8ç-(144)81ç257 -2C1ç2éCC4-T0PA5RçF 5Y2-1O2ç7IRIét86-RBç.58SR5 0G-ç5-8131ECO6-é7ç685N000 - 85400C83088 510ç27BN185SE04 - 88504N8é1ç23S8çTR3AçAé*B-ç5ç.9çç4ç-é0ç4288ç4T598486çI659611321ç690éCE17ç84786EYç8487ç04814181ç571ç1148B2259A3115451Y4523çé062ç4775785-9150C1çç17çB52A-LAç6ç0CççSUDç934CA333ç2é8ç4252ç5C1-A3042092ç4O2826722B2çCçM65ç45-31E62ç42çIç937A48ç80Iç0N42985éRçL-0(ççIAC347 B8T848ç0çç(42B4999E48ç C--A691çA81557CD44(ç7015A 7-é44PR800(28ç2B8BO0458243( rR-çE48o0217(4N8-47*ç886a6P789R-83S 674261E4d661'P0A17B8Dé844734AI2 05 40EDçS5-B5O9I7496EB73O68t3A-3E31ç.3384-SC2337346534A0U632N287çu54-éMA0690(-68530çC3B1t(R11H8lC7ç4E1A523-e13BAIp48ç547Sé648E-7BtL51BA1ç 76 KA44T9-432RBçA64TA063c44-r4o6DR61çé -889d25S4B4365-23DIc45ç*l68iP-.A25l1A0ççe344R31-68çIn-é1932423B3çI7s-(C6Nç114C-51A6ç(AD6G1s5600ç4323-0g1é0I4çB 47803H9çA0I43-58çI5119I23çL808R605ç 94é22L4B 5çM4 5562çAS-8IH50083-*9C16ç4-1T4PACAB5çIC515éA5çP5I3çT5-6çL*CI-286çO8iT40508çé41NlçS-15861ç2C805l3247ç3418pVç55-1 5240Aé04çC0-460049D5P6çr51R524D4V68ç-iç45-nPéçP-0P-çg0çB0RçCdRçé4TCç01-ç-A5ç8-160ç-Cé0ç*-33ç*1-6ç81PçC194çé6484çA65Rç-BAç826E64ç3é-86CçO-*8427-5740*0BF6çDA4G-46Féç88H11RCiAIç8l--1C1l5çEO-66220(WE461éç4DECNç (328NCC9eD-1ç8--SPO3Cs6DéOç508S0t0A618B3çM5A3p6*-11ç-BO078525A-P370aé-çR1-A8-R7B8r-L61ç133-d7G98-8.LO5E6Pkç683A-(33481(I3R8X-éç3(6 518B7704O(S1211-çER03231AAQ7çB25E2*0(17Gç(é7-MNB-A-8ç0-rD30S8BBe88I44çP-33Be31çEé0854-48Bn-O-33ç55-R-s0518AA78çR525b35133---çéC88B4Oo8416B-885(*33ç256-1r018 45004oA2çSo883777-6Aç05QéBB136m51çBAç1(186410(5mçLé0843C17220çA6-7E2C4ç1o860AçAé-012nB-5ç5006SB0çwL34çéC7D1çeDçGra.çéDV5ççlrtç.0ihçr1é4ç3g008ç3ç8i93çnB9é6ç80(Fçi4a-ç0Ceç530éSHçPçe1p5-BçrOAO0Ctiçé7çRoO2n-Bç-L4g84(-8Nf731135(-12O3--40890I33D24-01-T5640(2O(O7M(5((N*IDNAIUM O O F FI C E P A R K DESCRIPTION OF THE APPLICATION The applicant, CH Realty VI-Grey Star MF, Tysons Elan LLC, requests approval of a Comprehensive Sign Plan (CSP) for one building, currently under construction, approved as RZ/FDP 2010-PR-014D. The application area is located within the PTC District; the approved FDP for the site (FDP 2010-PR-014D) permits a residential building with ground floor retail (Building D2A) and an interim park. Building D2A, to be known as the Adaire, is a 35-story residential structure with 400 dwelling units being constructed on Parcel 2A; Parcel 3, which will be the future site of Building D2B, will be developed as an interim public park. The applicant seeks greater flexibility for the residential, temporary, and future tenant signage to enhance the overall visibility to the area given its proximity to the Spring Hill Metro Station. This coordinated signage system for the Adaire will assist in establishing the identity of the community while also helping to direct vehicular, transit, and pedestrian traffic to the Adaire. The proposed signage includes building-mounted signs for the residential tower as well as future retail tenant signs, temporary marketing banners, and temporary park signage. A copy of the CSP proposed with this application is provided in Appendix 1. The proposed development conditions are provided in Appendix 2, and the applicant’s statement of justification is provided in Appendix 3. LOCATION AND CHARACTER Site Description: The application area is located in the southeast quadrant of the intersection of Tyco Road and Boyd Pointe Way. The 1.58-acre site is zoned PTC (Planned Tysons Corner Urban District), as well as SC (Sign Control Overlay District) and HC (Highway Corridor Overlay District). The site was previously utilized as a used car dealership, and the Adaire (Building D2A) is currently under construction. Parcel 3, which is located adjacent to the Adaire, will contain a public temporary park. Eventually, the temporary park will be replaced with a residential building (Building D2B) that will be conjoined with the Adaire as depicted on the proffered CDP for RZ 2010-PR-014D. In addition, as also shown on that same proffered CDP, the abutting site to the west will be developed with an office building (Building D1). CSP 2010-PR-014-02 Page 2 Figure 1: Aerial photograph of CSP application area A summary of the surrounding land use, zoning, and Comprehensive Plan recommendations is provided in the following table. Existing Existing Use: Plan Recommendation: Zoning: North: C-7 Car dealership (Audi) Transit Station Mixed Use East: PTC Retail/commercial uses Transit Station Mixed Use Transit Station Mixed Use, South: C-7 Car dealership (Bentley) Park/Open Space West PTC Retail/commercial uses Transit Station Mixed Use BACKGROUND Site History: On December 12, 1977, the Board of Supervisors approved SE 77-D-201 to permit an auto body shop. An amendment to the special exception was later filed, but it was withdrawn. CSP 2010-PR-014-02 Page 3 On April 8, 2008, RZ/FDP 2008-PR-004 was filed with the Zoning Evaluation Division, which sought to rezone the subject site from C-7 to PRM for mixed-use development. This case was dismissed on February 25, 2011. On February 12, 2013, the Board of Supervisors approved RZ 2010-PR-014D, concurrent with FDP 2010-PR-014D. These applications rezoned 9.86 acres of land from the C-7 and I-5 Districts to the PTC District for a mixed-use development of seven buildings, including multi-family residential, office, and hotel buildings ranging up to 400 feet in height, with ground floor retail and other uses. FDP 2010-PR-014D sought to approve the final development plan for a single high-rise residential building (the Adaire), an interim park, and an option to retain or remove an existing building. Information on this application can be found at the following link. http://ldsnet.fairfaxcounty.gov/ldsnet/ZAPSMain.aspx?cde=RZ&seq=4161272 COMPREHENSIVE PLAN PROVISIONS (Appendix 4) Plan Area: Area II Planning District: McLean Planning District Planning Sector: Tysons Corner Urban Center (M1) Plan Map: Transit Station Mixed Use The Tysons Urban Design Guidelines, endorsed by the Board of Supervisors on January 24, 2012, address design elements that should be considered with signs. On Page 5-4, suggestions include: • Use permanent, weather proof, well-designed signs. • Limit the number of signs to convey a clear message and avoid visual clutter. • Clearly state the business name or other information displayed on the sign. • Scale typeface, characters and graphics of storefront signage to pedestrians and/or motorists, as applicable. • The scale and materials used for signs should be appropriate to the neighborhood. For instance, monolithic digital or other illuminated signs may be considered on a case by case basis in areas close to the metro and adjacent to high concentrations of arts and entertainment uses. Similarly, small-scale blade signs or awning signage would be more appropriate for a mixed-use residential neighborhood. • Signage must not present a visual obstruction to sight distances at intersections and vehicular CSP 2010-PR-014-02 Page 4 ANALYSIS Comprehensive Sign Plan (Appendix 1) Title of CSP: Adaire at Spring Hill Station, Land Bay – D2A, Comprehensive Sign Plan Prepared By: Walsh Colucci Lubeley & Walsh PC Original Date: December 30, 2015 Revision Date: April 29, 2016 Description of the Comprehensive Sign Plan The CSP contains 28 sheets and proposes building-mounted signs and temporary signs for the Adaire building. The CSP also proposes building-mounted signs for future retail tenants. Typography or specific number of retail signs are not specified; however, the CSP does propose a limitation to the amount of sign area and the location of these future signs on the building façade. The following is a summary of the proposed signage by sign type: Permanent Site Signs Adaire Building-Mounted Identification Signs One ground-floor entrance sign is proposed on the south elevation of the building with a maximum proposed sign area of 11.5 square feet (SF). The sign will consist of individual aluminum face-lit channel letters. Figure 2: Ground floor entrance signage CSP 2010-PR-014-02 Page 5 Two tower signs are proposed at the top of the building, with one sign measuring 157.5 SF to be located on the southern elevation and the other tower sign measuring 240 SF to be located on the northern elevation of the building. This signage would also consist of individual aluminum face lit channel letters. Figure 3: Tower signage, north elevation Temporary Park Signage A temporary park sign will be provided at three entry point locations to the interim park, as proffered in RZ 2010-PR-014D. Each of these signs will be no greater than 4 SF each. Figure 4: Interim park signage CSP 2010-PR-014-02 Page 6 Parking Directional Signage The CSP details three parking directional signs to be located on the southern elevation of the Adaire. These signs will include an exit lane sign, a loading entry sign, and a garage entry sign, measuring 5 SF, 8.1 SF, and 7.9 SF, respectively. Figure 5: Ground floor parking signage Retail Tenant Signs The applicant has proposed building-mounted signage along with select sidewalk sandwich board signs to be utilized by retail tenants. Under the proposed CSP, the tenant storefronts may contain blade signs, window signs, façade signs, or sidewalk signs (for restaurant uses only). The size and number of each sign will vary by tenant, but under the proposed CSP, the maximum allowable square footage per tenant shall not exceed 2.0 SF for each linear foot of frontage or a combined sign area greater than 200 SF. The total frontage for tenants is approximately 107 SF, or 160 SF of total allowable retail tenant signage. Figure 6: Retail signage CSP 2010-PR-014-02 Page 7 Temporary Signage The CSP proposes two temporary signs to assist in marketing during the initial leasing of the building. One banner would be located along the western elevation, which would be 378 SF in size; the other banner, which would be located along the southern elevation facing the Spring Hill Metro platform, would be 750 SF in size. A development condition has been included permitting these banners to remain for a maximum of 18 months from the date of issuance of each sign permit. Figure 7: Temporary signage along the western elevation

Description:
(ADA): Reasonable accommodation is available upon 48 hours advance P6. P7. T13. ADAIRE AT SPRING HILL STATION. SOUTH ELEVATION . P-5, P-6, P-7 DIRECTIONAL - GROUND FLOOR SOUTH ELEVATION - . Tax Map Parcels 29-3 ((32)) 2A and 3 to allow a Comprehensive Sign Plan
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.