ebook img

Best Practices for Airport Portland Cement Concrete Pavement PDF

159 Pages·2003·1.86 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Best Practices for Airport Portland Cement Concrete Pavement

IPRF An Research Report Innovative Pavement Research Foundation Airport Concrete Pavement Technology Program Best Practices for Airport Report IPRF-01-G-002-1 Portland Cement Concrete Pavement Construction (Rigid Airport Pavement) Programs Management Office 1010 Massachusetts Avenue, N.W. Suite 200 Washington, DC 20001 April 2003 ACPA Document No. JP007P IPRF An Research Report Innovative Pavement Research Foundation Airport Concrete Pavement Technology Program Best Practices for Airport Report IPRF-01-G-002-1 Portland Cement Concrete Pavement Construction (Rigid Airport Pavement) Principal Investigators Dr. Starr D. Kohn, P.E., Soil and Materials Engineers, Inc. Dr. Shiraz Tayabji, P.E., Construction Technology Laboratories, Inc. Contributing Authors Mr. Paul Okamoto, P.E. Dr. Ray Rollings, P.E. Dr. Rachel Detwiller, P.E. Dr. Rohan Perera, P.E. Dr. Ernest Barenberg, P.E. Dr. John Anderson, P.E. Ms. Marie Torres Mr. Hassan Barzegar, P.E. Dr. Marshall Thompson, P.E. Mr. John Naughton, P.E. Programs Management Office 1010 Massachusetts Avenue, N.W. Suite 200 Washington, DC 20001 April 2003 This report has been prepared by the Innovative Pavement Research Foundation (IPRF) under the Airport Concrete Pavement Technology Program. Funding is provided by the Federal Aviation Administration (FAA) under Cooperative Agreement Number 01-G-002. Dr. Satish Agrawal is the Manager of the FAA Airport Technology R&D Branch and the Technical Manager of the Cooperative Agreement. Mr. Jim Lafrenz is the IPRF Cooperative Agreement Program Manager. The IPRF and the FAA thank the Technical Panel that willingly gave of their expertise and time for the development of this report. They were responsible for the oversight and the technical direction. The names of those individuals on the Technical Panel follow. Mr. Terry Ruhl, P.E. CH2M Hill Mr. Gary Fuselier Metropolitan Washington Airports Authority Mr. Gary Fick Duit Construction Company, Inc. Mr. Jeffrey Rapol FAA Project Technical Advisor The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the data presented within. The contents do not necessarily reflect the official views and policies of the Federal Aviation Administration. This report does not constitute a standard, specification, or regulation. i ACKNOWLEDGEMENTS The manual was prepared by the following project team members: Principal Investigators Dr. Starr D. Kohn, P.E., Soil and Materials Engineers, Inc. Dr. Shiraz Tayabji, P.E., Construction Technology Laboratories, Inc. Contributing Authors Mr. Paul Okamoto, P.E. Dr. Ray Rollings, P.E. Dr. Rachel Detwiller, P.E. Dr. Rohan Perera, P.E. Dr. Ernest Barenberg, P.E. Dr. John Anderson, P.E. Ms. Marie Torres Mr. Hassan Barzegar, P.E. Dr. Marshall Thompson, P.E. Mr. John Naughton, P.E. The project team would like to acknowledge the contributions of the following: • Mr. Terry Sherman, Mr. Gene Gutierrez and Mr. Richard Donovan, U.S. Army Corps of Engineers, who provided valuable feedback at various stages in the development of the manual. • The staff of the Port Authority of New York and New Jersey, Memphis-Shelby County Airport Authority and Wayne County Department of Public Services who provided their time and arranged site visits and meetings with contractors, material suppliers and testing personnel. • The staff of the following paving contractors and equipment suppliers: o Interstate Highway Construction, Inc., Englewood, Colorado o Ajax Paving Industries, Inc., Madison Heights, Michigan o Gunthert & Zimmerman Construction Division, Inc., Ripon, California o Gomaco Corporation, Ida Grove, Iowa. The project team would also like to acknowledge that the manual incorporates the collective experience of a broad range of experts who have, over the years, contributed so much to the developments in airport concrete pavement construction technology. As a result of their contributions, which have produced long lasting concrete pavements, the United States enjoys one of the best aviation systems in the world. ii TABLE OF CONTENTS Page IPRF/FAA PREFACE ....................................................................................................................i ACKNOWLEDGEMENTS ...........................................................................................................ii NOTES FOR THE READER........................................................................................................ix EXECUTIVE SUMMARY ............................................................................................................x 1. INTRODUCTION ..............................................................................................................1 1.1 Purpose.....................................................................................................................1 1.2 Scope ......................................................................................................................2 1.3 Disclaimer................................................................................................................2 1.4 Quality in Constructed Projects...............................................................................2 2. CONSIDERATION OF DESIGN ISSUES.........................................................................4 2.1 Introduction..............................................................................................................4 2.2 Construction Variability...........................................................................................7 2.3 Summary..................................................................................................................7 3. PRE-CONSTRUCTION ACTIVITIES...............................................................................9 3.1 Construction Specification Issues............................................................................9 3.1.1 Civil (Private Sector) Construction Specifications......................................9 3.1.2 Military Construction Specifications.........................................................10 3.2 Planning Construction Logistics............................................................................10 3.3 Fast Track Construction and Opening Pavement to Traffic..................................11 3.3.1 Opening Pavement to Traffic.....................................................................11 3.4 Pre-Bid Meetings...................................................................................................13 3.5 Pre-Award Meetings..............................................................................................14 3.6 Pre-Construction Meetings....................................................................................14 3.7 Qualifying Construction Materials........................................................................15 3.7.1 Evaluation of Local Aggregates.................................................................15 3.7.2 Availability and Certification of Cementitious Materials..........................18 3.7.3 Availability and Certification of Admixtures & Curing Compounds........21 3.8 Specifying Project QMP/CQC Requirements........................................................23 iii 3.8.1 Basic QMP/CQC Definitions.....................................................................24 3.8.2 General Issues............................................................................................24 3.8.3 Quality Management Plan..........................................................................25 3.8.4 Contractor QC versus Agency QA (or Acceptance) Testing Responsibilities..........................................................................................26 3.9 Test Strip Construction..........................................................................................26 3.9.1 Test Strip Details........................................................................................27 3.9.2 Test Strip Acceptance................................................................................31 3.9.3 Consideration of Changes in Contractor and QMP/CQC Operations.......31 4. GRADE PREPARATION.................................................................................................32 4.1 Introduction............................................................................................................32 4.2 Grading and Compacting Subgrade.......................................................................32 4.2.1 Pre-Grading Activities...............................................................................32 4.2.2 Removal of Unsuitable Subgrade..............................................................33 4.2.3 Protection of Grade....................................................................................33 4.2.4 Grading Operations....................................................................................33 4.2.5 Compaction Requirements.........................................................................34 4.3 Subgrade Stabilization...........................................................................................36 4.3.1 Lime Stabilization......................................................................................36 4.3.2 Cement Stabilization..................................................................................38 4.3.3 Contingencies for Localized Areas............................................................38 4.4 Proof-Rolling.........................................................................................................39 4.5 Acceptance of Grade..............................................................................................39 4.6 Protection of Grade................................................................................................39 4.7 Adverse Weather Conditions.................................................................................40 4.8 Troubleshooting Guide..........................................................................................40 5. BASE AND SUBBASE CONSTRUCTION.....................................................................41 5.1 Introduction............................................................................................................41 5.2 Subbase Course......................................................................................................41 5.3 Mechanically Stabilized Base Course....................................................................42 5.4 Chemically Stabilized Bases..................................................................................42 5.4.1 Cement Treated Base.................................................................................43 5.4.2 Lean Concrete (Econocrete)......................................................................44 5.4.3 Asphalt Treated Base.................................................................................45 iv 5.5 Drainage Layers.....................................................................................................46 5.6 Stabilized Base Issues............................................................................................46 5.7 Troubleshooting Guide..........................................................................................47 6. GETTING READY FOR CONCRETE PAVING............................................................48 6.1 Grade Acceptance..................................................................................................48 6.2 Concrete Plant Operation.......................................................................................49 6.2.1 Managing the Aggregate Stockpile............................................................50 6.2.2 Concrete Uniformity Testing.....................................................................51 6.3 Paving Equipment Issues.......................................................................................52 6.4 Stringline Issues.....................................................................................................52 7. CONCRETE MIXTURE...................................................................................................54 7.1 Introduction............................................................................................................54 7.1.1 Concrete Mixture Requirements................................................................55 7.1.2 Laboratory Mixture Design Process..........................................................56 7.2 Concrete Mixture Design Issues............................................................................57 7.2.1 Workability................................................................................................57 7.2.2 Strength......................................................................................................58 7.2.3 Sulfate Resistance......................................................................................59 7.2.4 Air Entrainment.........................................................................................60 7.3 Blended Cements and Supplementary Cementitious Materials.............................60 7.4 Materials Incompatibility.......................................................................................62 7.5 Aggregate Requirements........................................................................................63 7.5.1 Aggregate Grading.....................................................................................63 7.5.2 The Case of Slag Aggregates.....................................................................65 7.5.3 The Case of Recycled Concrete Aggregates..............................................65 7.6 Field Adjustments of Concrete Mixture Design....................................................65 7.7 Troubleshooting Guide..........................................................................................67 8. CONCRETE PLACEMENT, FINISHING, TEXTURING, AND CURING....................68 8.1 Introduction............................................................................................................68 8.2 Concrete Delivery at the Site.................................................................................70 8.3 Concrete Placement...............................................................................................71 8.4 Embedded Steel and Tie-Bar Placement................................................................72 v 8.5 Dowel Bar Installation...........................................................................................73 8.5.1 Dowel Bars at Construction Joints.............................................................75 8.6 Concrete Consolidation..........................................................................................76 8.7 Concrete Finishing.................................................................................................78 8.8 Concrete Texturing................................................................................................79 8.9 Concrete Grooving.................................................................................................80 8.10 Concrete Curing.....................................................................................................81 8.11 Minimizing Edge Slump........................................................................................82 8.12 Fixed Form Paving.................................................................................................82 8.13 Paving and In-Pavement Structures.......................................................................85 8.14 Paving at Flexible Pavement Interfaces.................................................................85 8.15 Hot-Weather Concrete Placement..........................................................................86 8.16 Cold-Weather Concrete Placement........................................................................88 8.17 Protecting Concrete Against Rain Damage...........................................................90 8.18 Troubleshooting Guide..........................................................................................92 9. JOINT SAWING AND SEALING....................................................................................96 9.1 Joint Layout Issues.................................................................................................96 9.2 Timing of Joint Sawing........................................................................................100 9.3 Joint Sawing Operation........................................................................................103 9.4 Joint Cleaning Prior to Sealing............................................................................106 9.5 Joint Sealing Issues..............................................................................................107 9.5.1 Hot-Poured Joint Sealing Material...........................................................108 9.5.2 Cold-Poured Joint Sealing Material.........................................................108 9.5.3 Preformed Joint Sealer.............................................................................109 9.6 Troubleshooting Guide........................................................................................110 10. IMPLEMENTING QMP/CQC REQUIREMENTS........................................................111 10.1 QMP/CQC Testing and Production Plans............................................................111 10.2 Control Charts......................................................................................................112 10.3 Testing Process....................................................................................................113 10.3.1 Subgrade, Subbase, and Base Testing......................................................113 10.3.2 Fresh Concrete Testing............................................................................114 10.3.3 Thickness Testing....................................................................................115 10.3.4 Aggregate Tests (Gradation and Moisture Content)................................116 10.3.5 Strength Testing.......................................................................................117 10.3.6 Edge Slump, Joint Face Deformation, and Profile Testing and Tolerances................................................................................................120 10.3.7 Dowel Bar Alignment and Inspection......................................................122 vi 11. REPAIR OF EARLY AGE DISTRESS..........................................................................123 11.1 Plastic Shrinkage Cracking..................................................................................123 11.2 Edge Slump..........................................................................................................124 11.3 Joint Spalling.......................................................................................................125 11.4 Full Depth Cracking.............................................................................................125 BIBLIOGRAPHY........................................................................................................................127 INFORMATION CONTACTS/WEBSITES...............................................................................128 APPENDICES A – Test Standards Referred to in the Manual.................................................................130 B – Preconstruction Review Checklist............................................................................133 C – Inspection and Testing Checklist..............................................................................136 D – Joint Sawing Checklist..............................................................................................140 E – Decision Tree for Early Age Cracking......................................................................141 vii LIST OF TABLES Table Page 3.1 List of items from FAA’s AC: 150/5370-10A...........................................................10 3.2 Changes to project activities to shorten concrete pavement construction time.........12 9.1 Recommended maximum joint spacing on aggregate (granular) base......................98 LIST OF FIGURES Figure Page 4.1 Typical moisture-density curves showing the effect of moisture content on density...................................................................................................................35 6.1 Common concrete plant layout..................................................................................49 6.2 Working the aggregate stockpile...............................................................................51 6.3 An excessively high stockpile....................................................................................51 7.1 Aggregate workability factor.....................................................................................64 8.1 Typical bridge deck paving operation........................................................................69 8.2 A typical fillet construction operation.......................................................................69 8.3 Concrete placement ahead of paver...........................................................................72 8.4 Dowel bar installation along a longitudinal construction joint..................................76 8.5 Vibrator layout and position......................................................................................77 8.6 Honeycombed concrete..............................................................................................77 8.7 Output from a smart vibrator system showing the frequency of each vibrator.........78 8.8 Finishing operations...................................................................................................79 8.9 Blockout method........................................................................................................83 8.10 Split can coring technique..........................................................................................84 8.11 Rate of evaporation as affected by ambient conditions.............................................88 9.1 Airport concrete pavement joint types.......................................................................97 9.2 Typical joint spacing for pavements on stabilized bases...........................................99 9.3 Joint sawing window of opportunity..........................................................................101 9.4 Slab surface temperature at early age........................................................................101 9.5 Maturity meter testing................................................................................................103 9.6 Joint sealant reservoir design options for airport concrete pavements......................104 10.1 Example control charts..............................................................................................112 10.2 Field laboratory for beam fabrication and curing......................................................118 10.3 Measuring edge slump...............................................................................................120 10.4 Profilograph testing in progress.................................................................................121 11.1 Plastic shrinkage cracking..........................................................................................123 11.2 Shallow spalling due to improper edge slump repair.................................................124 viii

Description:
An IPRF Research Report Innovative Pavement Research Foundation Airport Concrete Pavement Technology Program Report IPRF-01-G-002-1 Best Practices for Airport
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.