ebook img

Atal Apartments PDF

91 Pages·2017·18.91 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Atal Apartments

Building & Construction Project “Atal Apartments” located at Shaheed Karnail Singh Nagar, Pakhowal Road, Ludhiana, Punjab. By Ludhiana Improvement Trust. . AS PER CHECK LIST SEIAA, PUNJAB FOR BUILDING, CONSTRUCTION, TOWNSHIP AND AREA DEVELOPMENT PROJECTS Sr. Description Reply No. 1. Properly filled Form 1 & 1A Form I & IA are enclosed with the application. 2. (a) In case(s) where land has already been Land documents are attached as Annexure- purchased/acquired: 1. Proof of ownership of land (b) In case where land is yet to be purchased/acquired: Proof of ownership of land (existing owner) such as copy of latest Jamabandi (not more than one month old) and credible document showing status of land acquisition w.r.t. project site as prescribed in OM dated 07.10.2014 issued by MoEF) 3. Copy of Master Plan of the area showing land Copy of Master Plan of Ludhiana showing use pattern of the proposed site/certificate project site is enclosed as Drawing-2. from Competent Authority intimating land use pattern of the project site as per proposals of Master Plan of the area. 4. Layout plan duly approved by the Competent Approved Layout Plan of the project is Authority / Conceptual plan of the project. enclosed as Drawing-3(a). 5. Topographical map of the area showing Toposheet showing project site is enclosed Contour Plan. In case of Area Development with the application. Contour Plan is Projects, the Contour Plan should reflect the enclosed as Drawing-4. true existing physical features of the site and may be prepared by the project proponent w.r.t. some permanent reference marks. 6. Status of construction, if any, along with No construction has been done at site; site photographs from all the four sides. photographs are enclosed as Annexure 2. 7. 500 meter radius map of the area from Google Earth Image showing project site & periphery of project site clearly indicating the surroundings within 500 m is enclosed as various industries (specifically red category Drawing 1. industries) and structures lying in the area. 8. Location plan showing the exact location of Marked layout cum Site Plan showing the the project site w.r.t. some permanent / location of STP, location of tubewell, Solid important features of the area and site plan of Waste segregation area, First Aid room, DG the project showing the following: sets & Transformers is enclosed as i) Location of STP Drawing-3 (b). ii) Solid waste storage area Plan Showing rain water recharging pits is iii) Green belt attached as Drawing-6. iv) Parking space Landscape plan showing green area details v) RWH and water recharge pits is attached as Drawing-9. vi) Fire fighting equipment layout Plan showing Surface & Stilt Parking is vii) First aid room enclosed as Drawing- 5. viii) Location of Tubewells Fire Fighting layout is enclosed as ix) DG Sets and Transformers Drawing-8. x) Any other utilities 9. Permission of Competent Authority for; a) Water and Sewerage connection The application for withdrawal of ground A letter from concerned Local Body / water has been submitted to DC. Copy of Authority giving details about existing status the same is enclosed as Annexure-9(c). of sewer connectivity and availability of NOC from MC, Ludhiana regarding water supply in the area and acceptance of Sewerage & Solid Waste disposal is Local Body for taking the quantity of sewage enclosed as Annexure-9(a) and to be generated by the proposed project and Annexure-9(b) respectively. providing the water supply. Existing position of public sewer and water supply line duly marked on the layout map / plan. b) Collection of Solid waste 10. Water balance chart for summer, rainy and Water Balance Diagrams for different winter seasons indicating critical requirements seasons i.e. Summer, Winter & Monsoon season are shown in Conceptual Plan Page Nos. 5 to 7 as Figure No. 1 to 3 respectively. 11. Availability of adequate land for use of Wastewater generated from the project will treated sewage and plantation. be treated in STP of 500 KLD capacity based on MBBR Technology. Treated water will be recycled for flushing & irrigation and remaining will be discharged to Municipal Sewer. 12. Analysis reports of ambient air, ground water Lab reports along with Field data sheets are and noise levels from NABL/MoEF enclosed as Annexure 10(a) & 10(b) Accredited laboratories as per detail below: respectively. (i) The field data sheets as prescribed by Layout map showing the location of SEIAA, Punjab which are available on the sampling is enclosed as Drawing 11. official website of SEIAA, Punjab along with exact location of sampling / monitoring point Email stating intimation for monitoring is marked on the layout map should be filled at enclosed as Annexure-10(c). the time of sample collection/monitoring by the Lab and should be attached with the water, air, noise & soil monitoring reports. (ii) Water, air, noise & soil monitoring reports more than 6 months old or prior to date of signing of consent letters/agreement with the land owner shall not be accepted w.e.f. June, 1st 2015 onwards. (iii) Atleast one groundwater sample from the shallow / first aquifer and in case groundwater is to be abstracted for drinking purposes then atleast one groundwater sample from the said aquifer should be monitored and reports be attached accordingly. 13. Quantification of energy saved and renewable Quantification of energy saved is enclosed energy devices used. as Annexure-11. 14. Drawing showing plumbing systems for use Dual Plumbing Plan along with schematic of fresh, treated and hot water drawing showing fresh water line, sewer line & treated line is enclosed as Drawing- 7. 15. Construction schedule (PERT/CPM Chart) PERT Chart is enclosed as Annexure-7. 16. Undertaking(s) for; Affidavit for the same is enclosed as a) Constitution of Environment Monitoring Annexure-4. Cell. b) Use of ready mix concrete or use of fly ash during construction. c) To provide Fire Fighting System. d) To provide wind breaking curtains and water sprinkling system to minimize dust emissions during construction phase. e) To provide adequate safety measures for the construction workers during the construction phase. 17. Environmental Management Plan Environment Management Plan mentioning indicating the following: the Mitigation measures along with a) All mitigation measures for each item- compliance of various regulations is wise activity to be undertaken during the enclosed with the application. construction, operation and the entire life cycle to minimize adverse environmental Mr. Rakesh Kumar Garg of Ludhiana impacts as a result of the activities of the Improvement Trust will be responsible for project. implementation of EMP for 5 years and b) Compliance of various environmental after that the welfare society of "Atal regulations. Apartments" will be responsible for the c) Steps to be taken in case of emergency same. such as accidents at the site including fire. d) For how long period the project proponent Capital & recurring cost for the EMP per will be responsible for implementation of year is given in Table 1(a) & 1(b) of EMP. EMP and the name of the person(s) responsible for implementation of EMP. e) Capital & recurring cost for the EMP per year and the details of funds for the same. f) Name of the individual persons / organization, who will be responsible for implementation of EMP after the lapse of the period for which the project proponent is responsible. 18. Corporate Social Responsibility indicating Ludhiana Improvement Trust being a Govt. various activities to be undertaken, organization, LIT undertakes various CSR provisions of funds for the same, the period measures in the region Ludhiana. for which the same is to be implemented and the person(s) responsible for the implementation of the same. 19. Traffic Circulation System and connectivity Plan showing Surface parking and stilt with a view to ensure adequate parking, parking is enclosed as Drawing-5. conflict free movements, Energy efficient Public Transport. 20. Disaster/Risk Assessment and Management Risk Assessment is enclosed with the Plan. application. 21. Copy of Memorandum of Article & Persons responsible for the development of Association / partnership deed / undertaking scheme is mentioned below as per the of sole proprietorship / list of Directors and hierarchy chart: names of other persons responsible for 1. Chairman managing the day-to-day affairs of the 2. Superintending Engineer project. 3. Technical Engineer 4. Assistant Technical Engineer 5. Junior Engineers 22. In case of expansion projects, compliance This point is not applicable as this is the report of earlier granted environmental fresh application for the Environmental clearance conditions verified by Northern Clearance. Regional Office of Ministry of Environment, Forests & Climate Change, Chandigarh. 23. Copy of presentation to be made before the Agreed SEAC at the time of appraisal in PDF format having size less than 25 MB. 24. Soft copy of all documents in compliance to Agreed. Ministry of Environment & Forests, New Delhi Office Memorandum No. J-11- 013/19/2012-IA-II(I) dated 31st May, 2012 having size less than 25 MB. 25 For expansion projects: This point is not applicable as this is the i. All the columns in the application form fresh application for the Environmental may be got filled in three parallel columns Clearance. i.e. Existing, Proposed and Total. ii. In case of increase in no. of story's, Structural Safety/ Stability Certificate may be required from the Approved Engineer. iii. The existing building plan may be got super imposed with the proposed building plan and be marked in different colors. iv. Specify the adequacy of internal water supply system, sewer line and STP for the proposed expansion/revision.

Description:
education in each & every subject on computer stream in Ludhiana. Animation, Audio Video Editing Vatavaran Bhawan, Nabha Road, Patiala.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.