DD KK EE HH CC -- AA MM RR AA >> >> ll aa uu nn aa mm nn oo ii tt aa cc ii ll pp pp aa application manual D D APPLICATION MANUAL D K E H C - A M R A > > l a u n a m n o i t a c i l p p a D © ARMACELL UK LTD. D 1 - General >> Working with Arma-Chek D APPLICATION MANUAL WORKING WITH ARMA-CHEK HEALTH & SAFETY • The installer should have a general knowledge of the • When using adhesive and mastic sealants, the manu- installation techniques relating to Armafl ex tube and facturer’s recommendations should be strictly sheet products. followed. Details available from your local Armacell • Use high quality tools. A sharp knife, good brushes Customer Services Department / local agent. and fresh Armafl ex adhesive are required. • Arma-Chek coverings are easily cut with a sharp craft • Use clean Armafl ex material. No dust, dirt, oil or water knife. Such knives should be handled with due care. should be present on the surface, if present clean with care. Armafl ex cleaner. • Use the correctly dimensioned material! TOOLS FOR INSTALLING ARMA-CHEK • Always split oval tubes on the fl at side. • Never pull glued joints when sealing them, always Folding rule / tape push them together fi tted under compression. measure SSStttrrraaaiiiggghhhttt eeedddgggeee • Never insulate installations and systems that are in operation! Only start insulated plants after 36 hours - after this time the adhesive is fully cured. Template Chalk for marking (printed on every D • Do not use Self-adhesive matching Arma-Chek tape irregular shapes Armafl ex carton) k as the only fi xing type for butt and longitudinal joints e and seams. Scissors h Silver ink marker C • Do not apply Arma-Chek covering on seams and pen - a joints which are glued with Armafl ex adhesive until the m Brushs with short, adhesive has been given time to fully cure (typically r fi rm bristles A 36 hours). Dividers h • Do not carry out fabrication on fl oors. Fabricate t i Arma-Chek products on a workbench as you would do w Callipers Smooth spatula metal jacketing. for smoothing g down covering n • Avoid installing in very humid and wet conditions. Tent i k and weather protect where possible. r o Knifes * Sharpened pipe • Avoid installing Arma-Chek covering under tension. W ends for the most • When using Arma-Chek covering on Armafl ex cdoiammmeotenr sp ipe > substrate make sure that all seams/joints are > completely sealed with the correct type of Armafl ex Safe edge craft Paint fabric rollers l a adhesive and are damage free. knife for surface gluing r and smoothing e • Always use the correct specifi ed Armafl ex adhesives. down covering n Do not assume they will always do the same job! If in e G doubt, consult the Armacell technical department / Sharpening stone Gluemaster local agent. • On external installations always ensure a “watershed” is present on all seams and joints. Mastic gun • On external installations and area’s internally that require “wash-down” always provide the Arma-Chek Mastic seal to all exposed seams and joints after the * A three knife set plus sharpening stone are available together as a application of the specifi ed Armafl ex adhesive. tool kit • For internal installations where the installation may be ”washed down,“ install the Arma-Chek covering as you would do for an external application, including the provision for the application of Arma-Chek Mastic . • Minimize joints where possible and “stagger”. • Apply Arma-Chek covering within 3 days of installing the Armafl ex insulation on external installations. © ARMACELL UK LTD. D (1) D APPLICATION MANUAL 1 - General >> Working with Arma-Chek D CORRECT USE OF ARMAFLEX ADHESIVE 0 °C or the relative humidity is higher than 80% (for further information see application hints for Armafl ex There are three types of accessories currently adhesives). available: • Armafl ex adhesive (520 & HT625) g) Use Armafl ex cleaner to clean your tools, con- • Arma-Chek Black Mastic taminated Arma-Chek and all seam and joint details • Arma-Chek D self-adhesive tapes within the Arma-Chek R system, prior to applying the bead of Arma-Chek mastic. ARMAFLEX ADHESIVE Adhesives to use are: ARMA-CHEK MASTIC Armafl ex adhesive HT 625 (bonding of HT/Armafl ex) The Arma-Chek mastic is an adhesive and a sealing Armafl ex adhesive 520 (all other Armafl ex elastomerics) product designed to give additional and long life protec- a) Before use shake and stir the adhesive thoroughly. tion to all Arma-Chek glued seams and joints in external Keep container/adhesive holder closed when not in environments and area’s internally that require “wash- use. down”. b) Use brushes with short, stiff bristles. Alternatively the 1. Before applying the mastic to all seams and joints, Armafl ex adhesive gluemaster can be used when check that they are completely sealed with the D working with the adhesive. correct type of Armafl ex adhesive, and securely fi xed k c) Application procedures for installing the Arma-Chek down (see item 6 below). e h covering to fl at and large surface area’s, where all- 2. Check that the seams and joints are clean, dry C over adhesive coverage is required: and free from contamination before applying the - a For Arma-Chek D covering adhesive is only required mastic. All seam and jointing details contained within m on the Armafl ex surface and on the overlapping area. the Arma-Chek R coverings, shall be cleaned with r A Always ensure there is all over adhesive coverage Armafl ex Cleaner/local solvent cleaner, before with no signs of “dry spots” where applicable, such applying the Arma-Chek mastic. h t as fl at surfaces, vessels and piping diameters above i 3. All seams and joints to have an allowance of a w 500mm. The Arma-Chek D covering is to be fi xed and minimum of 10 mm wide and 3 mm thick mastic g secured immediately, no “tack “time is required. “beading” applied. n Note: If the Armafl ex surfaces are left to two tack” i k 4. Smooth the mastic, with the use of a mastic spoon dry, they will not bond when pressure is applied. r o When this happens you can re-activate by applying a or a fi nger (use washing up liquid and water). The W fi nish of the mastic can be enhanced by „masking“ off further fi lm of Armafl ex adhesive. 5 mm either side of the seams and joints, prior to the > A short pile fabric paint roller/ large paint brush may > application of the mastic. Proceed to remove the be preferred on large circular and fl at surface areas. “masking tape” while the mastic is in its wet state l a d) Allow the adhesive to “tack-dry” on overlapping (Take care on health and safety issues!!) r e details . The “tack”-time depends on the thickness of n 5. In general, the application of the mastic should not be e the adhesive layer and the ambient conditions carried out when the ambient temperature is below G (temperature, relative humidity, air movement). The +5 °C or the relative humidity is higher than 80%. correct initial drying time is checked by the “fi nger- nail test”: Touch the surface with a fi ngernail, if the 6. The Arma-Chek mastic should not be used on a stand fi ngernail does not adhere to the surface and the alone basis to fi x and bond the coverings (see item 1 surface itself does not feel tacky the covering can be above). positioned and fi xed using hand pressure, a dry paint roller or a big brush to bond the covering to the Armafl ex. Apply pressure to the entire surface, smoothing the covering round making sure there are no air pockets present. Always check for alignment and avoid “creases and crinkles” during that time. e) If the surfaces are left to dry too long, they will not bond when pressure is applied. When this happens you can re-activate by applying a further fi lm of Armafl ex adhesive following steps b) to d). f) In general, the application of adhesives should not be carried out when the ambient temperature is below (2) D © ARMACELL UK LTD. D 1 - General >> Working with Arma-Chek D APPLICATION MANUAL CORRECT USE OF ARMA-CHEK D TAPES The following procedures are applicable for Arma-Chek self-adhesive matching tape with 20 mm, 50 mm and 100 mm width. • Self-adhesive tapes are to be used for internal applications only - do not use them on external installations!! • Check that the seams and joints are clean, dry and free from contamination before applying the self adhesive tape. To clean the seams and joints use the Armafl ex cleaner. • Peel back release paper and cover the entire seam line with an additional 50 mm overlap where appli- cable, applying pressure during the installation. • Check the self-adhesive tape has completely adhered itself to the under-laying covering. D • Self-adhesive Arma-Chek tape should not be used as k the only fi xing type for butt and longitudinal joints and e seams. h C - Temperature limits using self-adhesive tapes: a m • Ambient application temperature +10 °C to +35 °C, r maximum relative humidity 80 % A • Surface application temperature: minimum -50 °C, h maximum +80 °C it w • Always store in a warm, dry storage location. Ideal g storage temperature +5 °C to +35 °C (preferred n +18 °C) i k r o W > > l a r e n e G © ARMACELL UK LTD. D (3) D APPLICATION MANUAL 1 - General >> Working with Arma-Chek D D k e h C - a m r A h t i w g n i k r o W > > l a r e n e G (4) D © ARMACELL UK LTD. D 2 - Insulating with Arma-Chek D >> Using Pre-Covered Tubes APPLICATION MANUAL ARMA-CHEK D PRE-COATED TUBES Arma-Chek D pre-coated tubes are supplied with a self- adhesive seal in 1 metre lengths. The covering fi nishes approximately 10 mm before the end of the tube in order to guarantee that the insulation material is installed “un- der tension” around butt joints. 50 mm The Arma-Chek D pre-coated tube range is available for For external application: pipes with an outer diameter of up to 89 mm. For larger- Over seal all seam and jointing details of the covering sized pipes with an outer diameter of 102 mm up to 160 with a “bead” of Arma-Chek Black or Grey Mastic. mm special (non self-adhesive) pre-coated tubes are Ensure all joints are staggered away from the direct available on request. patch of rain, provide a watershed. Note: Due to the semi-fl exible nature of the products 8. Use the Arma-Chek mastic to seal all seams and s sleeving around bends is not possible! e joints! All seams and joints to have an allowance of a b min. of 10 mm wide and 3 mm thick mastic “beading” u T applied. INSULATING STRAIGHT PIPES (OD < 89 MM) d e USING THE ARMAFLEX TEMPLATE r e v The fabrication of bends and tees using Armafl ex tube o requires tubes to be cut to different angles. In order to C - make this process quicker and easier, the Armafl ex tem- e plate is provided on every box of Armafl ex. r P Additional copies are available on request (contact your g local Armacell representative for more information). n 1. Clean the pipe surface with Armafl ex cleaner i s removing any dust or other contamination. 1. Place a copy of the Armafl ex template face up on a U 2. Snap the tube onto the pipe. table or worktop. > > 2. Line a tube of Armafl ex across the template parallel along the horizontal base line. D k 3. Select the required angle cut from the template and e cut along this line. h C - a m r 3. Peel back both release paper strips step by step, A 200 mm at a time. Align the seam joints and apply h heavy pressure to the complete seam, this action will t i w allow closure. Note: Always check the seam is fully bonded before g proceeding to the next steps. n i t 4. Lay the covering tightly round the tube and fi x using a l the factory applied adhesive strip. u s n 5. Use correct Armafl ex adhesive to secure the longi- I tudinal seam. Apply on one side only. Always remember to “stagger” longitudinal seams. 6. Secure the butt end on the under face of the Armafl ex tube with the Armafl ex adhesive and also provide a “wet seal“ to the adjoining tube. 7. For internal application: The butt joints have to be over secured with the matching 50mm width self-adhesive Arma-Chek D tape. © ARMACELL UK LTD. D (5) D APPLICATION MANUAL 2 - Insulating with Arma-Chek D >> Using Pre-Covered Tubes INSULATING FITTINGS WITH PRE-COVERED TUBES BEND WITH 45° ANGLE USING ARMAFLEX TUBE 1. Cut the pre-coated tube to the correct length for the bend. 22.5° 2. Carefully close the longitudinal seam of the tube. 3. Carefully peel back the covering where it is fi xed. Ø Apply all over adhesive coverage to one of the sur- faces only. Once the adhesive is touch dry, fi x the covering to the piece of tube. 1/3 Ø* 4. Fabricate fi tting pieces as indicated in the drawings * The Ø details to achieve the 45° angle are approximate values! below. See also the Armafl ex installation manual! The s Note: Yellow lines indicate where cuts are to be made. e procedure for this is the same as for Armafl ex tube. Always follow instructions related to the application of pre-coated Arma- b u 5. Apply Armafl ex adhesive to all segment seams. Chek S+ tubes as stated in the above procedures relating to adhesives T and self-adhesive tapes and bandages. d e r e v SEGMENT BEND o C WITH 1 MIDDLE PART - 2+1 - 22.5° USING ARMAFLEX TUBE e r Ø P 6. Cut the fi tting piece open along the inside “throat”. g 22.5° 22.5° n Install the fi tting piece on the pipe. Apply the appro- si priate Armafl ex adhesive on the “throat”-seam. U 7. For internal installations: Cover the joints between > Ø successive tube segments and the seam of the > throat using 30 mm wide Arma-Chek S+ Self-Adhe- D sive Tape. k 10 - 50mm e For external installations: Cover the joints h between successive tube segments and the seam of C Note: Yellow lines indicate where cuts are to be made. the throat using 20 mm wide Arma-Chek S+ Butyl - Always follow instructions related to the application of pre-coated Arma- a Tape. Always ensure the tape is applied such that a m Chek S+ tubes as stated in the above procedures relating to adhesives watershed is achieved. r and self-adhesive tapes and bandages. A h t i w SEGMENT BEND g WITH 2 MIDDLE PARTS - 2+2 n USING ARMAFLEX TUBE i t a 10 - 50mm l u s Note: In some circumstances it may be preferable to 15° 15° n fabricate segment fi ttings from standard, un-covered, I Armafl ex with the Arma-Chek covering applied as a sec- ondary operation. Ø 10 - 50mm 2/3 Ø Note: Yellow lines indicate where cuts are to be made. Always follow instructions related to the application of pre-coated Arma- Chek S+ tubes as stated in the above procedures relating to adhesives and self-adhesive tapes and bandages. (6) D © ARMACELL UK LTD. D 2 - Insulating with Arma-Chek D >> Using Pre-Covered Tubes APPLICATION MANUAL INSULATION OF PIPE REDUCER USING SEGMENT BEND ARMA-CHEK D PRE-COVERED TUBES WITH 3 MIDDLE PARTS - 2+3 11,25° USING ARMAFLEX TUBE 10 - 50mm 11.25°11/25° 11.25°11/25° Ø 5. To seal the overlap Cut reducer to size - allow com- pression of 5mm at each end. Slit fi tting on the fl at side 10 - 1/2 Ø 10 - 50mm 50mm s e b Note: Yellow lines indicate where cuts are to be made. u Always follow instructions related to the application of pre-coated Arma- T Chek S+ tubes as stated in the above procedures relating to adhesives d and self-adhesive tapes and bandages. e r e v o C Install and glue seam and butt joints - e SWEPT T-PIECE r USING ARMAFLEX TUBE For internal application: Cover the segment fi tting P joints of the tube and the seam of the throat using g n Arma-Chek D Self-Adhesive Tape. i s For external installations: Cover the segment fi t- U ting joints of the tube and the seam of the throat using > Arma-Chek mastic. > D k e h 1/2 Ø 1/2 Ø C - a m r A h Y-TUBE t i USING ARMAFLEX TUBE w g n i t a l u 45° bend 45° bend s n I 90° bend Note: Yellow lines indicate where cuts are to be made. Always follow instructions related to the application of pre-coated Arma- Chek S+ tubes as stated in the above procedures relating to adhesives and self-adhesive tapes and bandages. © ARMACELL UK LTD. D (7) D APPLICATION MANUAL 2 - Insulating with Arma-Chek D >> Using Pre-Covered Tubes INSULATION JACKET COVER (small bore valves/unions etc.)all valves / unions etc.) 1. On cold lines, apply a small piece of Armafl ex tube completely glued on the spindle (or Armafl ex self- adhesive tape). 2. Ensure the Armafl ex is “butted” up to the face of the over-sized fi tting. Apply over-size pre-coated Arma-Chek tube over the fi tting. The oversize fi tting should extend by the wall thickness of the over-sized fabrication (minimum of 25 mm is required) over the adjoining insulation. On the butt end of the adjoining insulation remove the pre-coated covering by the s overlapping measurement. e b The spindle cut out should be 5 mm smaller than the u actual size of the insulated spindle diameter. T d e r e v o C - e r P g n i s U > > D k 3. Vapour sealing of all seams and joints together with e the penetration area of spindle. h C - a m r A h t i w g 4. Applying the Arma-Chek self adhesive tape to the n ends of the valve covering. Use minimum width of i t 50 mm apply the tape following description under a l chapter “End caps and Termination points”. u s n I (8) D © ARMACELL UK LTD.
Description: