ebook img

APPROVED CAPABILITY LIST DGCA APPROVED MAINTENANCE ORGANIZATION No. PDF

599 Pages·2016·2.75 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview APPROVED CAPABILITY LIST DGCA APPROVED MAINTENANCE ORGANIZATION No.

APPROVED CAPABILITY LIST For DGCA APPROVED MAINTENANCE ORGANIZATION No.: 145D-001 Document Number : DQ-001 Issue : 10 Revision : 5 Date : February 17, 2016 GMF Aero Asia Soekarno – Hatta International Airport Cengkareng – Indonesia, BUSH 19130, PO Box : 1303 Document Control Number : DGCA/CAP/004 Assignment : Directorate of Airworthiness and Aircraft Operation of Indonesia. CAPABILITY LIST Issued : 10 Revision : 5 Date : February 17, 2016 INTRODUCTION This Capabilities List has been prepared in accordance with the policies of Garuda Maintenance Facility AeroAsia. This listing document provides an overall portfolio of Accessories ratings, for the repair station located at : Garuda Maintenance Facility AeroAsia Soekarno - Hatta International Airport Cengkareng - Indonesia The general repair, overhaul or al teration of products will be performed in accordance with the current Civil Aviation Safety R egulations, manufacturer's data, drawings, specification and bulletins or other technical data approved or accepted by the Director General Civil Aviation of Indonesia for the particular Accessory limited rating. This Repair Station will not maintain or alter any item for which it is not rated, and will not maintain or alter any article for which it is rated if it requires technical data, equipment, materials, facilities or trained personnel that are not available. The technical library and this Approved Capability List, required for operation of this repair station, will be maintained in a current status at all times, withi n the time frames of distribu tion. The Quality Assurance of GMF AeroAsia will control this document's revision stat us a nd distribution. Each production General Manager and chi ef inspector working for this approved maintenance organization will have a current copy of this manual and should thoroughly understand of its contents. It will also be available to other personnel as required. 1 CAPABILITY LIST Issue : 10 Revision : 5 Date : February 17, 2016 CAPABILITY LIST CONTROL Each capability listing will have a control num ber and an as signment entry on the cover page. A master list containing the manu al number, location and revision status will be kept in the Quality Assurance & Safety office. It will be the responsibility of the Quality Assurance to continuo usly monitor, audit and update all relevant specifications used in the repair station. Any revisions necessary will be proposed by th e production General Manager for coordination and approval by Lead Auditor for Component. Lead Auditor for Component there to will appr ove each page of the listing and revision. Upon approval by Quality Assurance, sufficient copies will be made and distributed to provide revision pages for each Capability List holder. Upon receipt of a revision, each holder will be responsible for inserting the revised pages in its Capability List, record the revision on the record of revision page and return the acknowledgment form (provided with the revision) to the Quality Assurance & Safety office showing the holder has revised its Capability List. A section of effective pages will be issued with each revision so each listing can be checked and kept current. 2 CAPABILITY LIST Issue : 10 Revision : 5 Date : February 17, 2016 LIST OF EFFECTIVE PAGES Title Page No. Issue Date Revision Number Introduction 1 17 February 2016 5 Capability List Control 2 17 February 2016 5 List of Effective Pages 3 17 February 2016 5 Record of Revision 4 - 8 17 February 2016 5 Insertion Revision Record 9 - 10 17 February 2016 5 Capability List Electrical Component 1 – 49 17 February 2016 5 Electronic Component 1 – 31 17 February 2016 5 Emergency Equipment 1 – 66 17 February 2016 5 Engine/APU Component 1 – 59 17 February 2016 5 Fuel Component 1 – 21 17 February 2016 5 Gas Component 1 – 53 17 February 2016 5 Hydraulic Component 1 – 40 17 February 2016 5 Instrument Component 1 – 60 17 February 2016 5 Landing Gear Component 1 – 18 17 February 2016 5 Pneumatic Component 1 – 22 17 February 2016 5 Radio Component 1 – 52 17 February 2016 5 Structure Component 1 – 105 17 February 2016 5 3 CAPABILITY LIST Issue : 10 Revision : 5 Date : February 17, 2016 RECORD OF REVISION Doc. Number & Revision Description of Revision Date Supersedes Issued DQ-001 Issued 0 0 Original issued April 01, 1991 None DQ 001 Issued 1 0 Reissue April 01, 1992 DQ 001 Issued 0 DQ 001 Issued 2 0 Reissue April 01, 1994 DQ 001 Issued 1 DQ 001 Issued 3 0 Reissue Jan 01, 1996 DQ 001 Issued 2 DQ 001 issued 4 0 Reissue March 20, 1998 DQ 001 Issued 3 DQ 001 Issued 5 0 Reissue October 22, 1998 DQ 001 Issued 4 DQ 001 Issued 6 0 Reissue August 23, 1999 DQ 001 Issued 5 DQ 001 Issued 7 0 Reissue March 01, 2001 DQ 001 Issued 6 DQ 001 Issued 7 1 Add part numbers June 20, 2001 DQ 001 Issued 7 rev #0 Change the company name from Garuda Maintenance DQ 001 Issued 8 0 June 17, 2003 DQ 001 Issued 7 rev #1 Facility to GMF AeroAsia DQ 001 Issued 8 1 Add part numbers Jan 02, 2004 DQ 001 Issued 8 rev #0 DQ 001 Issued 8 2 Add part numbers Jan 21, 2004 DQ 001 Issued 8 rev #1 DQ 001 Issued 8 3 Add part numbers February 19, 2004 DQ 001 Issued 8 rev #2 DQ 001 Issued 8 4 Add part numbers February 25, 2004 DQ 001 Issued 8 rev #3 DQ 001 Issued 8 5 Add part numbers May 05, 2004 DQ 001 Issued 8 rev #4 DQ 001 Issued 8 6 Add part numbers June 30, 2005 DQ 001 Issued 8 rev #5 4 CAPABILITY LIST Issue : 10 Revision : 5 Date : February 17, 2016 RECORD OF REVISION Doc. Number & Revision Description of Revision Date Supersedes Issued 1. Reissue DQ 001 Issued 9 0 2. Add Structure Component. May 10, 2007 DQ 001 Issued 8 rev #6 3. Remove the selected part numbers Add Electrical, Electronic, Emergency, Fuel, Gas , Hydraulic, 1 Instrument, Landing Gear System, Pneumatic, Radio & October 27, 2008 DQ 001 Issued 9 rev # 0 DQ 001 Issued 9 Structure Components 1. Add Electrical, Electronic, Gas, Instrument, Radio And Structure Components’ Part Numbers. 2. Revise ATA Chapter of Instrument & Structure Part DQ 001 Issued 9 2 December 31, 2008 DQ 001 Issued 9 rev #1 Number. 3. Delete some Electrical, Emergency, Pneumatic and Radio Components Part Numbers. 1. Add Electrical, Instrument, Landing Gear, Radio And DQ 001 Issued 9 rev #2 DQ 001 Issued 9 3 Structure Components Part Numbers. April 30, 2009 2. Delete some Radio Component Part Numbers. 1. Add Electrical, Fuel, Hydraulic, Instrument, Landing Gear, Radio and Structure Component’s Part No. DQ 001 Issued 9 4 August 31, 2009 DQ 001 Issued 9 rev #3 2. Delete some Electrical, Fuel, Instrument, Pneumatic and Radio Components’ Part Numbers. 1. Add Electrical, Electronic, Fuel, Gas, Instrument, Landing Gear, Radio and Structure Components Part Numbers. DQ 001 Issued 9 5 2. Down Grade Gas Component’s Part Number. December 31, 2009 DQ 001 Issued 9 rev #4 3. Delete some Emergency, Gas, Hydraulic and Pneumatic Component’s Part Numbers. 5 CAPABILITY LIST Issue : 10 Revision : 5 Date : February 17, 2016 RECORD OF REVISION Doc. Number & Revision Description of Revision Date Supersedes Issued 1. Revise the term of Vendor to be Manufacturer. 2. Revise Capability level to 5 categories (1,2,3,4,5) 3. Add Fuel, Gas, Instrument, Pneumatic, Radio and DQ 001 Issued 9 rev #5 DQ 001 Issued 9 6 Structure Components’ Part Numbers. April 30, 2010 4. Revise ATA Chapter of Gas’s Components Part No. 5. Upgrade Gas Component’s Part Number. 6. Delete Some Electrical Component’s Part Numbers 1. Add Fuel, Gas & Hydraulic Component’s Part No. 2. Add Engine / APU Components ( 1 folder ). 3. Revise Electronic and Gas Components’ Part No. 4. Revise ATA Chapter of Electronic, Gas and Radio DQ 001 Issued 9 7 June 30, 2010. DQ 001 Issued 9 rev #6 Components’ Part Numbers. 5. Revise some Vendor’s name of Gas Component’s 6. Delete some Electronic, Emergency, Gas, Radio, Instrument and Structures Components’ Part No. 1. Add Electrical, Electronic, Emergency, Fuel, Gas, Hydraulic, Instrument, Landing Gear, Pneumatic, Radio DQ 001 Issued 9 8 and Structure Component’s Part Number. September 30, 2010 DQ 001 Issued 9 rev #7 2. Delete some Electrical and Radio Component’s Part Number. 1. Add Electrical, Electronic, Emergency, Gas, Hydraulic, Instrument, Landing Gear, Pneumatic, Radio and DQ 001 Issued 9 rev #8 DQ 001 Issued 9 9 December 31, 2010 Structure Component’s Part Number. 2. Delete double Part Number. 6 CAPABILITY LIST Issue : 10 Revision : 5 Date : February 17, 2016 RECORD OF REVISION Doc. Number & Revision Description of Revision Date Supersedes Issued 1. Change the format of the Capability List (Breakdown Part Number). DQ 001 Issued 10 0 2. Add Electrical, Electronic, Emergency, Engine/APU, Gas, April 29, 2011 DQ 001 Issued 9 rev #9 Instrument and Landing Gear Component’s Part Number. 3. Delete double Part Number. 1. Add Electrical, Emergency, Engine /APU, Fuel, Hydraulic, Instrument, Landing Gear, Pneumatic and Structure DQ 001 Issued 10 1 July 13, 2011 DQ 001 Issued 10 rev #0 Component’s Part No. 2. Delete some Instrument Part Number. 1. Add Electrical, Electronic, Emergency, Engine /APU, Fuel, Gas, Hydraulic, Instrument, Landing Gear, Pneumatic and DQ 001 Issued 10 2 Radio Component’s Part No. June 29, 2012 DQ 001 Issued 10 rev #1 2. Add work scope for Electronic, Instrument and Radio Components. 1. Add Electrical, Electronic, Emergency, Engine/APU, Fuel, Gas, Hydraulic, Instrument, Landing Gear, Pneumatic, DQ 001 Issued 10 3 June 10, 2013 DQ 001 Issued 10 rev #2 Radio and Structure Component’s Part Number. 2. Delete some Radio and Main Wheel Part Number. 7 CAPABILITY LIST Issue : 10 Revision : 5 Date : February 17, 2016 RECORD OF REVISION Doc. Number & Revision Description of Revision Date Supersedes Issued 1. Add Electrical, Electronic, Emergency, Engine/APU, Fuel, Gas, Hydraulic, Instrument, Landing Gear, Pneumatic, DQ 001 Issued 10 4 Radio and Structure Component’s Part Number. August 22, 2014 DQ 001 Issued 10 rev #3 2. Deleted some Electronic, Fuel, Hydraulic, Instrument, Radio and Seat component’s part numbers. 1. Add Electrical, Electronic, Emergency, Engine/APU, Fuel, Gas, Hydraulic, Instrument, Landing Gear, Pneumatic, Radio and Structure Component’s Part Number. DQ 001 Issued 10 5 February 17, 2016 DQ 001 Issued 10 rev #4 2. Deleted some Electrical, Pneumatic, Hydraulic, Engine/APU, Instrument, Radio and Seat component’s part numbers. Approved by : Ahmad Yani Chumaidhy Lead Auditor for Component Maintenance 8 CAPABILITY LIST Issue : 10 Revision : 5 Date : February 17, 2016 INSERTION REVISION RECORD Retain this record in the capability list. Upon receipt of revisions, insert revised pages in the list and enter the revision number, revision date, insertion date and initial of person incorporating the revision block on the record of revisions. Return the acknowledgment from to Qu ality Assurance office. All personnel are expected to suggest revision requirements, when the need is apparent, to the Lead Auditor for Component. Issue Revision Revision Date Insertion Date Insert By 8 0 (Re-issue) June 17, 2003 June 17, 2003 TQ 8 1 January 02, 2004 January 02, 2004 TQ 8 2 January 21, 2004 January 21, 2004 TQ 8 3 February 19, 2004 February 19, 2004 TQ 8 4 February 25, 2004 February 25, 2004 TQ 8 5 May 05, 2004 May 05, 2004 TQ 8 6 June 30, 2005 June 30, 2005 TQ 9 0 May 10, 2007 May 10, 2007 TQ 9 1 October 27, 2008 October 27, 2008 TQ 9 2 December 31, 2008 December 31, 2008 Quality Assurance & Safety 9 3 April 30, 2009 April 30, 2009 Quality Assurance & Safety 9 4 August 31, 2009 August 31, 2009 Quality Assurance & Safety 9 5 December 31, 2009 December 31, 2009 Quality Assurance & Safety 9

Description:
station. Any revisions necessary will be proposed by th e production General Manager for coordination and approval by Lead Auditor for Component. EMERGENCY. VARIOUS. 146 D23835-101. LIFE RAFT. AIR CRUISER. 25-60-07. X X X X X. EMERGENCY. B747. 147 D23835-103. LIFE RAFT.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.