WRMP Options Appraisal Report Appendices Appendix A - Reports Appendix B – Unconstrained Options Appendix C – Water resources planning studies Appendix D – Carbon costs Appendix E – Benefits Assessment (BAG) Report Appendix F – Willingness to Pay Report Appendix G – Climate Change Assessment Report Appendix H – Water Framework Directive No Deterioration Report Appendix I – EBSD Optimisation Model Report Appendix J – Preferred plan options set Appendix K – Scenario Testing Results (cid:36)(cid:83)(cid:83)(cid:72)(cid:81)(cid:71)(cid:76)(cid:91)(cid:3)(cid:47)(cid:3)(cid:16)(cid:3)(cid:48)(cid:72)(cid:87)(cid:72)(cid:85)(cid:76)(cid:81)(cid:74)(cid:3)(cid:54)(cid:87)(cid:85)(cid:68)(cid:87)(cid:72)(cid:74)(cid:92)(cid:3) WRMP Options Appraisal Report Appendix A – Reports Options Appraisal Report Appendix A Reports The following reports are referred to within the options appraisal report: • Review of Water Resource Zone Integrity, Final Report, Anglian Water, 19 February 2013 • MISER Product Information Report, May 2013 • Economics of Balancing Supply and Demand Optimisation Model Report, University College London, April 2013 • Economics of Leakage Control for PR14, TMC, April 2013 • Draft 2014 Water Resource Management Plan indicative view of baseline forecast, Anglian Water, October 2012. • Strategic Environmental Assessment Scoping report, October 2012 • Strategic Environmental Assessment, Volume I: Main report, December 2013 • Strategic Environmental Assessment, Volume II: Appendices, May 2013 • Habitats Regulations Assessment, December 2013 • Costessey Surface Water Licence Sustainability Reduction Project Report, Anglian Water, April 2012. • British Waterways Transfer to Pitsford Reservoir, Water Resources Assessment, AW Water Resources Team, July 2012’ • Anglian Water PR14 Willingness to Pay Survey: Final Report (eftec and ICS consulting, November 2012) • Anglian Water PR14 Second Stage Water Resources: Final Report (eftec and ICS consulting, May 2013) • Anglian Water PR14 Customer Research: Completion Report (eftec and ICS consulting, May 2013) WRMP Options Appraisal Report Appendix B – Unconstrained Options Options Appraisal Report Appendix B.1 Unconstrained Options - Fenland Appendix B - Unconstrained options Unconstrained Options - Supply Side Options RZ Fenland Note: Table also includes unconstrained options for Hunstanton RZ Date 20 March 2013 Screening Criteria h a Scheme Type CaSCtceohgmeopmroieen seS/nuStbus-b - Option Ref Option Description Risks & Constraints UnRceoanssotnra Ninoetd I nOcplutidoends iLnis t Does opt. address the problem? oes opt. breacunalterable planning constraints? Is the opt. promotable? oes opt. have high risk of failure Reason for Discounting Option OFpeatisoinb lies ReRfeepreonrtc e D D Direct river abstraction River Wissey / Cut off Channel (WTW extension) x CAMS - Cut off Channel subject to WFD no N deterioration. River Heach Subject to CAMS x CAMS resource availability - no water available, N T6a therefore this option does not address the problem River Ingol Subject to CAMS x CAMS resource availability - water available at N T6a higher river flows. The published CAMS documents have been used to identify potential areas of river abstraction based on the existing water resource availability. However, the CAMS documents that were used in this review are, in several cases, considered out-dated since a republication is due within the next year. For the River Ingol where the preliminary low flow resource availability status of the river reach is ‘water available’ it is overridden to ‘no water available’ in order to indicate that additional abstraction will only be allowed where it does not make the position within the critical unit any worse. Therefore there is a high risk that the option would fail before implementation North Norfolk Rivers Subject to CAMS x CAMS resource availability - no water available, N T6a therefore this option does not address the problem Gaywood River Subject to CAMS x CAMS resource availability - no water N T6a available/over-licensed , therefore this option does not address the problem New reservoir storage On-stream reservoirs None There are no suitable valleys for an impounding reservoir Pumped-storage reservoirs Feltwell (Trent-Rutland-Ouse transfer) A feasible option but not taken through to Stage 2 Y T1d as would need to be developed as part of long term strategy To be considered in the WREA North Norfolk Rivers (winter storage) Yield, location, timing of delivery x Within the North Norfolk AONB. Low flows and N T1e likely high HOF suggest that scheme would have minimum yield. Therefore there is a high risk that the option would fail before implementation. Wash Reservoirs Yield, location, timing of delivery x Due to the environmental sensitivity of the Wash N T1d there is a high risk of failure. This option could be considered in the WREA Flood storage Wash Barrage Yield, timing of delivery x Due to the environmental sensitivity of the Wash N T10c there is a high risk of failure. New IDB structure Yield, location, timing of delivery x x Uncertainty of reliability, quantity and quality of N T10a resource. Therefore high risk of failure and solution not addressing the problem. To be considered in the WREA SUDS - recharge lagoons Yield, location, timing of delivery x x Uncertainty of reliability, quantity and quality of N T10b resource. Therefore high risk of failure and solution not addressing the problem Reservoir raising None There are no reservoirs to raise Groundwater sources Sandringham Sands Subject to CAMS x CAMS Review - no water available (Heach). Water N T6b available (Ingol) but "Economic gains from the relatively small quantities of water which might be available, are outweighed by the environmental risks to a small river which is highly dependent on the underlying Chalk strata”. Therefore there is a high risk of failure that the option would fail before implementation. Nitrate removal/revised blending regime x No WTW output constrained by blending scheme. N T4e Therefore this option does not address the problem H4 Hunstanton groundwater development Y T4c Infiltration galleries None No suitable sites Artificial Storage and Recovery Sandringham Sands x x ASR scheme has been discounted due to risk of N T8a wells (or ‘Aquifer Storage and clogging due to fine sands, risk of changes in Recharge’) (ASR) water quality, potential for recharge water loss and distance to the potential recharge source. Options Appraisal Report Appendix B.1 Unconstrained Options - Fenland Aquifer Recharge (AR) North Norfolk Rivers (central Norfolk) x CAMS5 states no available surface water. N T8c Recharge to the coastal Crag and the Chalk using treated effluent could be possible, but would require a site by site assessment to determine if there is sufficient head room and permeability. However the discharged effluent must be of sufficient quality to protect groundwater quality, and such discharges would be subject to an Environmental Permit (NEP) and risk assessment. Will be considered further in WREA. Desalination H3 Hunstanton (Wash) Desal Location Y T11b F2 Kings Lynn Desal Location Y T11b Reclaimed water Reclaimed domestic F1 Kings Lynn Effluent Reuse Y T3a wastewater F1 West Walton WRC Reuse Y T3a H2 Heacham WRC Y T3b Reclaimed industrial and Industrial reclaimed water Resource availability, yield, WQ, Unproven - subject to significant uncertainty in N commercial wastewater (for availability to trade terms of impact on river flows, water quality, WFD domestic, commercial and and availability of trading options industrial users) Bulk transfers (including changes By canal None No canals in area to existing transfers, and transfers from sources both inside and outside the company’s own supply area) By river By pipeline H1 Fenland PZ transfer to Hunstanton Y T2 North Norfolk Coast RZ transfer x Not adequate surplus to transfer N T2 Wash Pipeline from Lincolnshire Resource availability in Lincolnshire x Due to the environmental sensitivity of the Wash N T2 there is a high risk of failure. This option could be considered in the WREA F3 NW Norfolk transfer x Not adequate surplus to transfer from North N T2 Norfolk Coast WRZ F4 and F5 Transfer from Ruthamford WRZ Resource availability in Ruthamford Y T2 Resource Sharing with other Trade None No adjacent water companies Water Companies Shared asset ownership None No adjacent water companies 3rd Party Options Trade 3rd party trade options Resource availability, yield, WQ, Unproven - subject to significant uncertainty in N availability to trade terms of impact on river flows, water quality, WFD and availability of trading options Shared asset ownership Multi use reservoir (agriculture) Resource availability, yield, WQ Concerns over resilience in a drought and control N T13 over raw water quality. To be considered in WREA and the Defra Wissey pilot study. Tankering of water H5 Hunstanton tankering (road) x x Due to the high numbers of tanker deliveries per N T15 day down narrow country roads will be difficult to justify given the potential for disruption of local traffic. High WQ risks. Therefore the option is considered not promotable with a high risk of failure before implementation Kings Lynn tankering (sea) Subject to ongoing evaluation. N Icebergs x Unproven - subject to significant risk N Improved/sophisticated Kings Lynn conjunctive use Subject to ongoing evaluation and RSA risk. N conjunctive management Other Options Appraisal Report Appendix B.2 Unconstrained Options - Norwich and the Broads Appendix B - Unconstrained options Unconstrained Options - Supply Side Options RZ Norwich & the Broads Date 20 March 2013 Screening Criteria Scheme Type CaSCtceohgmeopmroieen seS/nuStbus-b - Option Ref Option Description Risks & Constraints UnRceoanssotnra Ninoetd I nOcplutidoends iLnis t Does opt. address the problem? Does opt. breach unalterable Is the opt. promotable? Does opt. have a high risk of failure Reason for Discounting Option OFpeatisoinb lies WRR Teafeskre Rnecpeort Direct river abstraction NB6, NB7, NB10 River Wensum Subject to CAMS/SR Y T17 River Yare Subject to CAMS x CAMS resource availability - N T6a overlicenced. Therefore this option does not address the problem River Tas Subject to CAMS x CAMS resource availability - over N T6a abstracted. Therefore this option does not address the problem New reservoir storage On-stream reservoirs NB7 Existing storage pits development (lining pits) Conclusion of hydraulic connectivity study Y T1d Gravel Pit development Yield, timing of delivery x Development of the gravel pits do N T1e not provide sufficient storage capacity and are not feasible on environmental regulatory grounds Pumped-storage reservoirs NB5 and NB8 New Wensum Reservoir Timing of delivery Y T1d Feltwell winter storage reservoir + transfer Resource availability, timing of delivery x A feasible option but not taken Y T1d through to Stage 2 as the scheme could not be implemented in time to meet deficit created by sustainability reduction on Wensum. Would need to be developed as part of long term strategy and should be considered in the WREA. Flood storage SUDS Yield, location and timing of delivery x Uncertainty of reliability, quantity N T10b and quality of resource. Therefore high risk of failure and solution not addressing the problem Reservoir raising None There are no reservoirs to raise Groundwater wells NB9 Norwich groundwater development Solution included in the baseline N Alliance Ringland perched ponds Unproven - subject to ongoing N evaluation. Infiltration galleries Wensum gravels Yield, licence x Low Potential - Loss of water from N T8b river is likely. Unmanageable WQ risk Artificial Storage and Recovery None No suitable sites wells (or ‘Aquifer Storage and Recharge’) (ASR) Aquifer Recharge (AR) Flood water management Yield, licence x It is considered potentially feasible to N T8c site a SuDS scheme in north and north-west Norwich . Local Site Investigations will be required due to the variable ground conditions. However there is uncertainty of reliability and quality of resource. Desalination NB1 Bacton Y T11a NB3 Cantley Reuse (brackish river water or groundwater) Yield, WQ x Discounted based on SEA N T11b Reclaimed water Reclaimed domestic NB2 Norwich water reuse Y T3a wastewater NB4 Lowestoft/Great Yarmouth Reuse Yield and location in relation to deficit x Discounted based on SEA N T3b Reclaimed industrial and Review discharge consents Unproven - subject to significant N T5a commercial wastewater (for uncertainty in terms of impact on domestic, commercial and river flows, water quality, WFD and industrial users) availability of trading options Sizewell Location, public perception x Return seawater used for cooling N T7 could be suitable as a raw water source. However initial comparison between the RO plant detailed in Task 11 and treatment of the higher temperature seawater indicate that there maybe savings of around 5% OPEX but CAPEX would be the same magnitude and the operational risks are much higher. Therefore this option has been discounted. Bulk transfers (including changes By canal None No canals in the area to existing transfers, and Options Appraisal Report Appendix B.2 Unconstrained Options - Norwich and the Broads g , transfers from sources both inside and outside the company’s own supply area) By river Ouse - Wensum transfer (with Feltwell reservoir) A feasible option but not taken Y T2/T1d through to Stage 2 as the scheme could not be implemented in time to meet deficit created by sustainability reduction on Wensum. Would need to be developed as part of long term strategy and should be considered in the WREA. By pipeline Fenland RZ transfer x Not adequate surplus to satisfy deficit N T2 in Norwich and the Broads WRZ Ruthamford North RZ transfer x Not adequate surplus to satisfy deficit N T2 in Norwich and the Broads WRZ West Suffolk RZ transfer x Not adequate surplus to satisfy deficit N T2 in Norwich and the Broads WRZ Essex and Suffolk Water transfer No trading options N T2 x Resource Sharing with other Trade Essex and Suffolk Water transfer from the Broads x No trading options N T2 Water Companies Cambridge Water x Options been maximised for CWS RZ N T2 no further trading options Shared asset ownership Sizewell (with ESW) Location, public perception x Option discounted on basis increased N T7/T13 risk and costs compared to traditional desalination 3rd Party Options Trade 3rd party trade options Yield, reliability, WQ and timing of Subject to ongoing evaluation. N T5a/b delivery Shared asset ownership Agricultural reservoirs Resource availability, yield, WQ Concerns over resilience in a drought N T13 and control over raw water quality. To be considered in WREA Tankering of water No Quantities too high for tankering to be feasible Improved/sophisticated conjunctive management Other Options Appraisal Report Appendix B.3 Unconstrained Options - East Suffolk and Essex Appendix B - Unconstrained options Unconstrained Options - Supply Side Options RZ East Suffolk & Essex Date 20 March 2013 Screening Criteria Scheme Type CaSCtceohgmeopmroieen sSe/nuStbus-b - OpRteiofn Option Description Risks & Constraints UnRceoanssotnra Ninoetd I nOcplutidoends iLnis t Does opt. address the problem? Does opt. breach unalterable planning constraints? Is the opt. promotable? Does opt. have a high risk of failure OFpeatisoinb lies Reason for Discounting Option Information Required Task Owners Direct river abstraction Existing intake pumps and licence maximisation x N Intake to Alton water currently Resource assessment T1b/T6a operating at maximum licence conditions, WFD no-deterioration Mill River - licence maximisation x N Sustainability reduction imposed Resource assessment T6 resulting in no additional water available River Stour - trade with Essex and Suffolk Water x N No trade options available with Essex Resource assessment T6/14 and Suffolk Water River Colne x N CAMS resource availability for the Resource assessment T1d/T6a Lower Colne - overlicenced. Therefore this option does not address the problem River Fynn/River Deben Subject to CAMS - licence issues x N Unproven - unlikely to be suitable for Resource assessment T6a public water supply River Blackwater Subject to CAMS x N CAMS resource availability for the Resource assessment T6a River Blackwater - overlicenced. Therefore this option does not address the problem New reservoir storage On-stream reservoirs Great Bradley Yield, timing of delivery Y A feasible option but not taken Resource assessment T1d through to Stage 2 as would need to be developed as part of long term strategy and should be considered in the WREA Reservoir dredging x N Increasing storage at Alton is not a Resource assessment T1c viable method of increasing hydrological yield, under current licence conditions Pumped-storage reservoirs Feltwell reservoir + transfers to Essex and Suffolk WRZ Y A feasible option but not taken Review previous study T1d through to Stage 2 as would need to be developed as part of long term strategy and should be considered in the WREA SE7 Ardleigh extension (see shared asset ownership below) Y Review previous study T1d Flood storage SUDS Yield, location and timing of delivery x N Uncertainty of reliability and quality Resource assessment T10b of resource. Therefore high risk of failure and solution not addressing the problem. To be considered in the WREA Reservoir raising Alton Water x N Increasing storage at Alton is not a Resource assessment T1c viable method of increasing hydrological yield, under current licence conditions Ardleigh Reservoir x N Increasing storage at Ardleigh is not a Resource assessment T1c viable method of increasing hydrological yield, under current licence conditions Groundwater sources Gravel Pit exploitation Yield, WQ, location and timing x N CAMS resource availability for the Resource assessment T6b River Gipping - overlicenced. There are WQ risks with this option. Therefore this option does not address the problem Baylham x N CAMS resource availability for the Resource assessment T6b River Gipping - overlicenced. There are WQ issues with this option. Therefore this option does not address the problem North Ipswich groundwater x N CAMS resource availability for the Resource assessment T6b confined chalk - over abstracted. Therefore this option does not address the problem Bartlow/Bures x N CAMS resource availability for the Resource assessment T6b confined chalk - over abstracted. Therefore this option does not address the problem SE6 South essex RZ groundwater development Y Resource assessment T4c ES6 Ipswich groundwater development Y Resource assessment T4c ES7 Belstead Brook Chalk groundwater development x N Option discounted on further review Resource assessment T6b of CAMS Treat high fluoride groundwater source x N WTW output from high fluoride Resource assessment T4e sources are constrained by licence and not poor quality water and WTW capacity Infiltration galleries Ipswich Yield, WQ, licence and location x N No Potential - There is no source of Resource assessment T8b recharge for this scheme here. The river is tidally influenced and therefore not suitable due to the salinity content Braintree Yield, WQ, licence and location x N Low Potential - Loss of water to river Resource assessment T8b is likely, and the gravel outcrop coincides with the flood plain so would increase local flood risk and WQ risks. Localised outcrops will not Woodbridge Yield, WQ, licence and location x N No Piodte ntiaffli -i Thte rte is no source of Resource assessment T8b recharge for this scheme here. The river is tidally influenced and therefore not suitable due to the salinity content Halstead Yield, WQ, licence and location x N No Potential - Loss of water to river is Resource assessment T8b likely. Already a water quality issue within area due to Safeguard Zone Artificial Storage and Recovery Mill River Licence x N Option does not provide additional DO Review previous study T8a wells (or ‘Aquifer Storage and and has therefore been discounted as Recharge’) (ASR) part of WRMP. Limited availability of injection water. Options Appraisal Report Appendix B.3 Unconstrained Options - East Suffolk and Essex SE3 South Essex RZ ASR Yield, WQ, licence and location x N Option does not provide additional DO Resource assessment T8a and has therefore been discounted as part of WRMP Aquifer Recharge (AR) SUDS Yield, WQ, licence and location x N Uncertainty of reliability, quantity and Resource assessment T8c quality of resource. Therefore high risk of failure and solution not addressing the problem. To be considered in the WREA Desalination ES4 Felixstowe Y Review previous study T11a Reclaimed water Reclaimed domestic ES3 Ipswich Water Reuse Y Review previous study T3a wastewater SE1 Colchester Water Reuse Y Review previous study T3a Tilbury/Chelmsford (trades) Yield, location N Unproven - subject to significant Resource assessment T3b uncertainty in terms of impact on river flows, water quality, WFD and availability of trading options Reclaimed industrial and Colchester/Ipswich industrial study (discharge consents) N Unproven - subject to significant Review trade eff discharge T5a commercial wastewater (for uncertainty in terms of impact on domestic, commercial and river flows, water quality, WFD and industrial users) availability of trading options Sizewell Location, public perception x N Return seawater used for cooling Review previous study T7 could be suitable as a raw water source. However initial comparison between the RO plant detailed in Task 11 and treatment of the higher temperature seawater indicate that there maybe savings of around 5% OPEX but CAPEX would be the same magnitude and the operational risks are much higher. Therefore this option has been discounted. Bulk transfers (including changes By canal None No canals to existing transfers, and transfers from sources both inside and outside the company’s own supply area) By river EOETs optimisation (+ trade with Essex and Suffolk Water) x N No trade options available with Essex T2 and Suffolk Water By pipeline SE2, South Essex RZ to East Suffolk RZ Y T2 SE8, ES10 ES1 Transfer from Ipswich PZ to Woodbridge PZ Y Included in baseline ES5 Transfer WTW to Semer PZ or Ipswich PZ N Subject to on-going evaluation Resource Sharing with other Trade SE4 Affinity East (Ardleigh agreement) Y Discuss with Affinity T14 Water Companies Affinity Central x N No water to trade Discuss with Affinity T14 ES8, ES9Essex and Suffolk Water x N No water to trade Discuss with ESW T14 Thames Water x N No water to trade Discus with Thames Shared asset ownership Sizewell Location, public perception x N Return seawater used for cooling Discuss with ESW T7 could be suitable as a raw water source. However initial comparison between the RO plant detailed in Task 11 and treatment of the higher temperature seawater indicate that there maybe savings of around 5% OPEX but CAPEX would be the same magnitude and the operational risks are much higher. Therefore this option has been discounted. EOETs extension N Only feasible if combined with storage Discuss with ESW T14 reservoir (Feltwell). Would need to be developed as part of long term strategy and should be considered in the WREA Ardleigh upgrade - gravel pit extension Y A feasible option but not taken Discuss with Veolia T14 through to Stage 2 as would need to be developed as part of long term strategy and should be considered in the WREA 3rd Party Options Trade 3rd party trade options ? Subject to ongoing evaluation. Review trade effluent discharge T5b Trade high fluoride water x N WTW output from high fluoride Resource assessment T4e/T5b sources are constrained by licence and not poor quality water and WTW capacity. Therefore no water to trade Shared asset ownership None identified Tankering of water CE3 Tankering (Road) Location of source x x N Due to the high numbers of tanker Identify source and route T15 deliveries per day down narrow country roads will be difficult to justify given the potential for disruption of local traffic. High WQ risks. Therefore the option is considered not promotable with a high risk of failure before Icebergs x N Unproven - subject to significant risk Tankering (sea) N Subject to ongoing evaluation. Improved/sophisticated Colchester Chalk (optimise use of surface water resources and back off N Subject to ongoing evaluation and Resource assessment T12 conjunctive management Colchester Chalk) RSA risk. Other SE5 Refurbish Ardleigh WTW to maximise DO Y Included in the baseline forecast, capital maintenance scheme
Description: