GGGOOOVVVEEERRRNNNMMMEEENNNTTT OOOFFF KKKAAARRRNNNAAATTTAAAKKKAAA WWAATTEERR RREESSOOUURRCCEESS DDEEPPAARRTTMMEENNTT (((MMMAAAJJJOOORRR,,, MMMEEEDDDIIIUUUMMM IIIRRRRRRIIIGGGAAATTTIIIOOONNN AAANNNDDD CCCAAADDDAAA))) AANNNNUUAALL RREEPPOORRTT 2015-16 VVIIKKAASSAA SSOOUUDDHHAA JUNE 2016 1 SL. PAGE CONTENTS No. No. 1 INTRODUCTION 7 2 ORGANISATIONAL STRUCTURE 9 ACHIEVEMENTS OF WATER RESOURCES DEPARTMENT DURING 3 10 2015-16 4 ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP) 13 5 SPECIAL DEVELOPMENT PLAN (SDP) 15 6 KRISHNA BHAGYA JALA NIGAM LIMITED (KBJNL) 19 UPPER KRISHNA PROJECT (UKP) 28 7 KARNATAKA NEERAVARI NIGAMA LIMITED (KNNL) 51 1 GHATAPRABHA PROJECT 53 2 HIPPARAGI IRRIGATION PROJECT 53 3 MARKANDEYA PROJECT 54 4 MURGOD LIS 54 5 CHACHADI LIS 54 6 DUDHGANGA IRRIGATION PROJECT 54 7 HIRANYAKESHI LIS 55 8 BELLARY NALA PROJECT 55 9 SRI RAMESHWARA LIS 55 10 KINAYE PROJECT 56 11 MALIKWADI LIS 56 12 FILLING OF SHIRGAON BASAVANNA TANK 56 13 FILLING OF KADAPUR TANK 56 FILLING OF 22 TANKS FROM OF HIRANYAKESHI RIVER (18 14 57 TANKS OF HUKKERI TALUK & 4 TANKS OF CHIKKODI TALUK 15 TUBACHI-BABALESHWAR LIS 57 16 BASAVESHWAR (KEMPWAD) LIS 57 17 VEERABHADRESHWARA LIS 57 2 SL. PAGE CONTENTS No. No. 1 18 KALLOL-YADUR BRIDGE CUM BARRAGE 58 19 VENKATESHWARA LIS 58 20 MALAPRABHA PROJECT 58 21 HARINALA IRRIGATION PROJECT 59 22 KALASA NALA AND BANDHURNALA PROJECT 59 23 JAVALUHALLA L.I. SCHEME 60 24 BENNIHALLA L.I. SCHEME (5 NOS.) 60 25 KOLACHI L.I. SCHEME 60 26 KONNUR L.I. SCHEME 60 SHIGGAON L.I. SCHEME (Micro irrigation project- sprinkler/drip 27 61 system) 28 SAVANUR LIS 62 29 UPPER TUNGA PROJECT (UTP) 62 30 TUNGA LIFT IRRIGATION SCHEME 63 31 BASAPURA LIFT IRRIGATION SCHEME 63 32 ITAGI-SASALWAD LIS 63 33 GUDDADA MALLAPURA LIS 63 34 UBRANI-AMRUTHAPUR LIS 64 35 SANYASIKOPPA LIS 64 36 DANDAVATHI PROJECT 64 37 THILUVALLI LIFT IRRIGATION SCHEME 64 38 MODERNISATION OF TUNGA ANICUT PROJECT 65 39 KACHAVI LIFT IRRIGATION SCHEME 65 40 ANJANAPURA/AMBLIGOLA RESERVOIR PROJECT 65 41 HUCHARAYANA KERE 65 42 SHEELAVANTHANA KOPPA KERE 66 43 MADAGA-MASUR TANK PROJECT 66 44 DHARMA PROJECT 66 45 BHADRA RESERVOIR PROJECT 66 3 SL. PAGE CONTENTS No. No. 46 VANI VILAS SAGAR RESERVOIR PROJECT 67 47 GONDI ANICUT (BHADRA) PROJECT 67 48 HODIRAYANAHALLA DIVERSION SCHEME 68 49 RANIKERE FEEDER CANAL 68 50 JAMBADAHALLA RESERVOIR PROJECT 68 51 GAYATHRI RESERVOIR PROJECT 68 52 BHEEMASAMUDRA TANK 69 53 D.B.KERE PICK-UP PROJECT 69 54 DAVANAGERE 22 TANKS (RAJANAHALLI LIS) 69 55 BYRANAPADA LIS 69 CONSTRUCTION OF LINK CANAL FROM HEBBEHALLA TO 56 70 MADAGADAKERE CONSTRUCTION OF BRIDGE ACROSS TUNGA RIVER NEAR 57 70 MATTUR HOSAHALLI IN SHIMOGA TALUK CONSTRUCTION OF BRIDGE ACROSS BHADRA RIVER NEAR 58 70 GONDI IN BHADRAVATHI TALUK 59 BENNITHORA PROJECT 70 60 BHIMA LIFT IRRIGATION SCHEME 71 61 GANDORINALA PROJECT 71 62 LOWER MULLAMARI PROJECT 72 63 AMARJA PROJECT 72 64 CHAMDRAMPALLI PROJECT 73 65 HATHIKUNI TANK PROJECT 73 66 SOUDHAGAR TANK PROJECT 73 67 KARANJA PROJECT 73 68 UPPER MULLAMARI PROJECT 74 69 CHULKINALA PROJECT 74 70 TUNGABHADRA PROJECT 74 71 HIREHALLA PROJECT 74 72 SINGATALUR LIFT IRRIGATION SCHEME (SLIS) 75 4 SL. PAGE CONTENTS No. No. 73 KATARKI LIS 75 74 BAILMARCHAD LIS 75 75 Y KAGGAL LIS 75 76 KARUR LIS 76 77 OLABELLARY LIS 76 78 MODERNISATION VIJAYANAGARA CANAL S 76 79 RAJOLI BANDA PROJECT 76 80 MASKINALA PROJECT 77 FILLING UP OF 10 TANKS HADAGALI TALUK FROM TUNGABHADRA 81 77 RIVER 81A Alwandi Bettager LIS: 77 82 VARAHI PROJECT 77 83 UPPER BHADRA PROJECT (UBP) 78 84 YATTINAHOLE PROJECT 78 8 CAUVERY NEERAVARI NIGAMA LIMITED 79 1 D. DEVARAJA URS CANAL 81 2 KABINI RESERVOIR PROJECT 82 3 HARANGI PROJECT 83 4 TARAKA PROJECT 84 5 ARKAVATHY PROJECT 86 6 CHIKLIHOLE PROJECT 86 7 UDUTHOREHALLA PROJECT 87 8 IGGALUR BARRAGE PROJECT 88 9 MANCHANABELE PROJECT 89 10 KRISHNARAJA SAGAR MODERNISATION 90 11 HULIKERE TUNEL 91 CONSTRUCTION OF BALANCING/STORAGE RESERVOIR ACROSS 12 91 CAUVERY RIVER ON THE UPSTREAM OF MEKEDATU PROJECT 13 NANJAPURA LIFT IRRIGATION SCHEME 92 5 SL. PAGE CONTENTS No. No. 14 BANAHALLIHUNDI LIS 93 15 HEMAVATHY PROJECT,GORUR 94 16 YAGACHI PROJECT 95 17 HUCHANAKOPPALU LIS 96 18 KAMASAMUDRA LIS 97 19 KACHENAHALLI LIS 97 20 VOTEHOLE PROJECT 98 21 MALALUR LIFT IRRIGATION SCHEME. 99 REMODELLING OF HEMAVATHY LEFT BANK CANAL FROM CH 22 99 0.00 TO 72.00 KM 23 HEMAVATHY CANAL ZONE TUMKUR 100 24 DRINKING WATER SCHEMES 101 25 MODERNIZATION OF ANECUT CANALS 110 9 COMMAND AREA DEVELOPMENT AUTHORITY 121 10 WATER RESOURCES DEVELOPMENT ORGANISATION 131 11 CENTRAL MECHANICAL ORGANISATION (CMO) 150 12 KARNATAKA ENGINEERING RESEARCH STATION (KERS, K.R SAGAR) 153 13 WATER AND LAND MANAGEMENT INSTITUTE (WALMI, DHARWAD) 162 ADVANCED CENTRE FOR INTEGRATED WATER RESOURCES 14 163 MANAGEMENT (ACIWRM) 6 1. INTRODUCTION This Annual Report of Water Resources Department includes annual Programme, Progress and important events that have taken place during the year 2015-16. GEOGRAPHICAL AREA The geographical area of Karnataka is 1,91,791 Sq. Km., accounting for 5.83% of the total area of the country. The cultivable command area of the State is 1,40,598 sq. Km. The net sown area is 1,07,000 sq. Km. The ultimate Irrigation Potential under Major and Medium Irrigation Projects has been estimated as 39.43 Lakh Ha. PROGRESS IN BRIEF The Water Resources Department has established three special purpose vehicles, namely, Krishna Bhagya Jala Nigama Limited (KBJNL), Karnataka Neeravari Nigama Limited (KNNL) and Cauvery Neeravari Nigam Limited (CNNL), under the companies Act of 1956, to mobilize financial resources for speedy completion of major and medium irrigation projects with-in the targeted period. KRISHNA BHAGYA JALA NIGAM LIMITED (KBJNL): “Krishna Bhagya Jala Nigam Limited” was formed vide G.O. No. ID/25/WBM/95, dated: 6-5-94, to expedite the works of Upper Krishna Project (UKP). This Nigam is functioning since 19th August 1994. KARNATAKA NEERAVARI NIGAM LIMITED (KNNL): “Karnataka Neeravari Nigam Limited” was formed vide G.O. No. ID: 201: KBN: 98, dated: 26-11-98, to expedite the works in Krishna Basin, except UKP. This Nigam is functioning since 9th December 1998. CAUVERY NEERAVARI NIGAM LIMITED (CNNL): “Cauvery Neeravari Nigam Limited” was formed vide G.O. No. WRD: 32: KBN: 2003, Dated: 12.05.2003, to expedite the works in Cauvery Basin. This Nigam is functioning since 3rd June 2003. 7 COMMAND AREA DEVELOPMENT AUTHORITY (CADA) DIRECTORATE: As per the GO.No.WRd:39/CAM/2011,dated:17.11.2012, cada directorate has been established to cordinate among the various cada’s and water users co-operative societies of the state to reduce the gap between potential planned and potential created. ADVANCED CENTRE FOR INTEGRATED WATER RESOURCES MANAGENENT (ACIWRM): An Advanced Centre for Integrated Water Resources Management (ACIWRM) has been established vide G.O.No:WRD/64/MBI/2011, Dated: 7.02.2012. FOREST AND LAND ACQUISITION CELL: A Forest and land acquisition cell has been established in WRd vide GO dated: 25.08.2014 to persue forest claerance proposals and land acquisition issues. The forest cell is headed by Chief Conservator of forests (CCF). 8 2. ORGANISATIONAL STRUCTURE WATER RESOURCES DEPARTMENT 9 3. ACHIEVEMENTS OF WATER RESOURCES DEPARTMENT DURING 2015-16 (cid:1) During 2015-16, Rs.8732.35 crores financial progress is achieved and an irrigation potential of 67336 Hectares is created from ongoing Major & medium irrigation projects of Water Resources Department and FIC’s have been created for 62887Ha., FDC for an area of 46390 Ha and 15094 Ha of saline and brackish land is reclaimed under CADA. (cid:1) Central Assistance of Rs.... 208.16 Crores and Rs.61.29 crores for CADA works under Accelerated Irrigation Benefit Programme has been availed during 2015-16. Total Central Assistance of Rs.269.45 crores has been availed during 2015-16. (cid:1) Krishna Bhagya Jala Nigam Limited has incurred an expenditure of Rs.... 3891.16 Crores for implementing ongoing major and medium irrigation projects/Components during 2015-16. (cid:1) Karnataka Neeravari Nigam Limited has incurred an expenditure of Rs.... 3151.74 Crores for implementing ongoing major and medium irrigation projects/components of projects during 2015-16. (cid:1) Cauvery Neeravari Nigam Limited has incurred an expenditure of Rs.... 1342.88 Crores for implementing ongoing major and medium irrigation projects/Components of projects during 2015-16. (cid:1) During 2015-16, expenditure under Special Component Plan is Rs.1088.75crores, under Tribal Sub Plan is Rs.494.11 crores &under Special Development Plan is Rs.191.48 has been incurred. (cid:1) For the first time, water has been let out for irrigation to about 6,000 acres under Varahi Right Bank Canal Scheme. (cid:1) The first phase works of Ethinahole project have been taken up in 5 packages amounting to Rs.3716.51 crores and Rs.1743.73 crores has been spent up to end of March 2016. 10
Description: