ebook img

andhra pradesh building rules 2016 PDF

332 Pages·2017·4.32 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview andhra pradesh building rules 2016

DRAFT [as on 18112016] ANDHRA PRADESH BUILDING RULES 2016 MUNICIPAL ADMINISTRATION & URBAN DEVELOPMENT DEPARTMENT GOVERNMENT OF ANDHRA PRADESH DRAFT ANDHRA PRADESH BUILDING RULES 2016 1 PAGE LEFT BLANK Note: Where ever “ANDHRA PRADESH BUILDING RULES 2016” appears in this document it may be read as “ANDHRA PRADESH BUILDING RULES 2017” DRAFT ANDHRA PRADESH BUILDING RULES 2016 2 ANDHRA PRADESH BUILDING RULES 2016 CONTENTS Chapter Rule Subject Page (A) (B) (C) (D) Notification 14 I Administration 15-16 1 Short Title, Applicability and Commencement 15 II Definitions 16-41 2 Definitions 16 Procedural Requirements for Obtaining Building III 42-64 Permission 3 Procedural Requirements 42 IV General Space Requirements and Services 65-86 Standardspacerequirements ofvariousparts ofa 4 65 buildingofalltypesincluding high rise buildings 5 Splay at road junctions, including ‘Y’ junctions 66 6 Requirements of Parts of Buildings 67 V Provisions for Structural Safety of Buildings 87-96 7 Structuraldesignandsafety 87 8 Buildings with Soft Storey 89 9 StructuralrequirementsofLowIncome Housing 90 10 Seismic strengthening/retrofitting 90 11 Structural Design Basis Report (SDBR) 90 12 Reviewof Structural Design 91 Certification regarding Structural SafetyinDesign and 13 92 Constructional Safety 14 Quality control, Construction Practices and Safety 92 15 Inspection 93 16 Issue of Occupancy Certificate 94 ProtectiveMeasuresinNatural Hazard Proneareas 17 94 [Wherever applicable] AlternativeMaterials,MethodsofDesign and Construction 18 94 and Tests 19 Maintenance of Buildings 95 20 Building Services 95 VI Fire Protection and Fire Safety Requirements 97-117 21 Applicability 97 Procedure for Clearance from Andhra Pradesh Fire 22 97 Service Act, 1999 23 Procedure for obtaining the Occupancy Certificate 97 24 Renewal of Fire Clearance 98 25 Fee 98 26 Fire Consultant 98 27 Terminology 98 28 General 98 29 Fire Escapes or External Stairs 99 30 Provision of Lifts 100 31 Basement 102 32 Provision of Helipad 102 DRAFT ANDHRA PRADESH BUILDING RULES 2016 3 Chapter Rule Subject Page (A) (B) (C) (D) 33 Service Ducts/RefugeChute 102 34 Electrical Services 102 35 Staircase and Corridor Lights 103 36 Air-Conditioning 103 37 Boiler Room 106 38 Alternate Source of Electric Supply 106 39 Safety Measures in Electric Sub-Station 106 40 Fire Protection Requirements 109 41 Static Water Storage Tank 111 42 Automatic Sprinklers 111 Fixed Carbon Di-Oxide/Foam/DCO Water Spray 43 112 Extinguishing System 44 Fire Alarm System 112 45 Control Room 113 46 Fire Drills and Fire Orders 113 47 Material Used for Construction of Building 114 48 LPG 114 49 House Keeping 114 50 Fire Prevention 115 51 Occupancy Restrictions 117 VII General Building Requirements 118-131 52 Category of the Building and Minimum Size of Plot 118 53 Requirement of Approach Road for Building Sites/Plots 119 54 Restrictions of Building Activity 121 55 Special requirements for Occupancy/Land Development 127 Compliance With Andhra Pradesh Energy 56 130 Conservation Building Code (APECBC): VIII Provisions for Non-High Rise Development 132-139 57 Permissible Setbacks & Height for All Types of Non- 132 High Rise Buildings 58 Row Type Housing / Row Type Shopping Precincts 136 59 Cluster Housing 136 60 Buildings With Central Courtyard For Commercial Use 137 61 Group Development Schemes 137 IX Provisions for High Rise Development 140-153 62 High Rise Buildings/Complexes 140 63 Application 140 64 Location and Plot Area 141 65 Means of access 141 66 All roundOpenSpaces/SetBacks 142 67 Parking Requirements 143 68 Building components 144 69 Building Services 149 70 Special type of High rise buildings 152 X Special Category of Buildings / Provisions 154 X-1 Conservation of Heritage Sites and Buildings 155-163 71 Applicability and General 155 72 Definitions 155 73 Responsibility of the owners of heritage buildings 156 DRAFT ANDHRA PRADESH BUILDING RULES 2016 4 Chapter Rule Subject Page (A) (B) (C) (D) 74 Restrictions on development / re-development / repairs 156 75 Penalties 157 Preparation of list of heritage sites including 76 heritage buildings, heritage precincts and listed 157 natural feature areas Alteration/modification/relaxation in development 77 158 norms 78 Heritage precincts / Natural feature areas 158 79 Road widening 158 80 Incentive uses for heritage buildings 158 81 Maintaining skyline and architectural harmony 159 82 Restrictive covenants 159 83 Grading of the listed buildings / listed precincts 159 84 Opinionofthe HeritageConservation Committee 161 85 Approvaltopreservethebeautyofthearea 162 Signs and Outdoor Display Structures/including Street 86 162 Furniture on Heritage Sites 87 Composition of Heritage Conservation Committee 162 88 The terms of referenceoftheCommittee 162 89 Implications of listing as heritage buildings 163 90 Ownership not affected 163 Provisions for Differently Abled, Elderly and X -2 164-180 Children 91 Applicability and General 164 92 Definitions 164 93 Site Development 166 94 Buildings 168 95 Designing for Children 180 96 Additional Information 180 Provisions for Construction and Regulation of X-3 181-191 Multiplex Complexes 97 Definitions 181 Applicability of Andhra Pradesh Cinemas (Regulation) 98 182 Act, 1955 and Rules made there under Redevelopment of existing cinema halls into Multiplex 99 182 Complex 100 Site Requirements for Multiplex Complexes 182 101 Location Criteria 182 102 Documents to be submitted 183 103 Building Requirements 183 104 Construction requirements 184 105 Parts of the Building requirements 188 106 Seating arrangements in theatres 189 107 Parking requirements 189 108 Landscaping and greenery 190 109 City/Area Level Impact Fee Payable 190 Building Permission to be obtained before 110 191 commencement of construction 111 Occupancy Certificate to be obtained 191 DRAFT ANDHRA PRADESH BUILDING RULES 2016 5 Chapter Rule Subject Page (A) (B) (C) (D) 112 Maintenance & Management 191 Provisions for Construction And Regulation of X-4 192-239 High-Rise Hospital Buildings (Above 30m Height) 113 Introduction 192 114 Definitions 192 115 Height and Open Space 192 116 Fire Resistive Requirements 193 117 Special Hazards 203 118 Interior Finishes 205 119 Means of Egress 205 120 Emergency System Requirements 219 121 Elevators 221 122 Fire Protection Systems 222 123 Fire Detection and Alarm Systems 223 124 Emergency Voice Alarm Communication Systems 225 125 Atrium Requirements 227 126 Egress Travel 228 127 Risk Assessment Report 228 128 Basement Protection 228 129 Smoke Compartmentation 229 130 Electrical Requirements 231 131 Decorative Materials and Furnishings 232 132 Air Conditioning System 233 133 Refuge Floor Area 233 134 Other Requirements 234 Management and Maintenance of General Fire Safety 135 234 Measures 136 Fire Management 236 137 Other Stipulations 237 138 Planning and Execution 238 X-5 Green Buildings 240-247 139 Green Buildings 240 140 Applicability and Provisions 241 141 Provisions for Sanction of Building Application 244 142 Provisions for City and Site level greening 244 143 Sustainable Waste Management 245 144 Sustainability of Building Materials 245 145 Incentives for the Green Buildings 246 146 Procedure for obtaining the incentives 246 XI Environmental Provisions in Buildings 248 XI-1 Rain Water Harvesting Structure 249-257 147 General 249 148 Need 249 149 Advantages 249 150 Methods 249 151 Techniques 250 Procedure for obtaining Building Permission for all 152 Commercial, Public Buildings and New Buildings on 255 Plots of 300sq.m and above DRAFT ANDHRA PRADESH BUILDING RULES 2016 6 Chapter Rule Subject Page (A) (B) (C) (D) Payment of fees in case of Rain Water Harvesting 153 257 Structures 154 Security Deposit 257 Penalty in case of failure in construction for RWHS by 155 257 owners XI-2 Solar Energy in Buildings 258-261 156 Applicability 258 157 Types of Solar Energy systems for Buildings 258 Area norm for Roof Top and Capacity of Solar Photo 158 259 voltaic Power plant to be installed Guidelines for installation of Solar Water Heating 159 260 Systems Procedure for Obtaining Building Permission for all 160 buildings having Plot area more than 500sq.m. and all 261 public buildings Payment of fees in case of Solar Power Roof Top 161 261 Systems 162 Security Deposit 261 Penalty in case of failure in construction of Solar Power 163 261 Roof Top Systems Integration of Environmental Clearance with XI-3 262-270 Sanction 164 General 262 Environmental Conditions for Compliance during 165 262 Building Approvals XII Transferable Development Rights (TDR) 271-275 166 Transferable Development Rights (TDR) 271 167 Concession in Road Widening Cases 271 168 Grant of Transferable Development Rights 272 169 Guidelines on Transferable Development Rights 272 Documents to be submitted along with Application for 170 273 Grant of Transferrable Development Rights Certificate Provisions for Economically Weaker Section XIII 276-277 (EWS)/Low Income Group (LIG) Housing Category 171- 180 List of Tables List of Annexures List of Forms DRAFT ANDHRA PRADESH BUILDING RULES 2016 7 ANDHRA PRADESH BUILDING RULES-2016 LIST OF TABLES Table Content Chapter Page No. (A) (B) (C) (D) 1 Size of drawing sheets III 47 2 Notation for colouring of plans III 47 3 Conversion Scale III 48 City Level Infrastructure Impact Fees - 4 III 53 No. of floors, use of the building and rate in Rs. Per sq. m of built up area 5 MinimumSize,WidthandHeightofdifferentcomponentsofresidentialpremises IV 65 6 Splay required at road junctions IV 66 7 Number of Occupants per unit Exit width IV 73 8 MinimumWidthProvisionsforStairways IV 76 9 MinimumWidthProvisionsforPassageway/Corridors IV 76 10 SizeofVentilationShaft IV 82 11 Parking Area to be provided in all Buildings IV 86 12 ProofCheckingRequirementsforStructural Design V 91 13 Category Wise Minimum Size of Plots VII 118 14 Minimum Abutting Existing Road Width Required VII 119 15 Clearance from Overhead Electric Lines VII 122 Environmental Clearance requirement for Building/Construction 16 VII 123 Projects/Area Development Projects and Townships 17 Minimum Setbacks and Height Permissible for Non-High Rise Buildings VIII 132 Minimum abutting road width and all-round open space/setback for High 18 IX 142 Rise Buildings Travel Distance for Occupancy and Type of Construction for High Rise 19 IX 144 Building /Complex Glass quality and Use of glass in buildings for High Rise Building 20 IX 144 /Complex 21 Minimum width of staircase for different types of high rise buildings IX 148 DRAFT ANDHRA PRADESH BUILDING RULES 2016 8 Table Content Chapter Page No. (A) (B) (C) (D) 22 Grading of ListedHeritage Buildings / Precincts X-1 160 23 Minimum all-round setbacks for a Multiplex Complex X-3 184 24 Fire Fighting Installations in Multiplex Complex X-3 185 25 Means of escape and Exit Requirements for Multiplex Complex X-3 186 26 Parking requirements for Multiplex Complex X-3 189 27 City/Area Level Impact Fee Payable for Multiplex Complex X-3 190 28 Height and Open Spaces for High-Rise Hospital Building X-4 193 Number of required exits for various occupancies in High-Rise Hospital 29 Building X-4 206 Maximum Allowable Exit Access Travel Distances in High-rise Hospital 30 Building X-4 208 31 Exit Access Components – Corridors in High-Rise Hospital Building X-4 209 32 Stairs requirement in High-Rise Hospital Building X-4 212 33 Accessible means of egress in High-Rise Hospital Building X-4 217 Provisionsandapplicability for variousplotsizes(alluse remises) for green 34 building norms X-5 242 35 Provisions for Rain Water Harvesting by Building Types XI-1 256 36 Area norm for Roof Top and Capacity of Solar Photo voltaic Power plant XI-2 259 Environmental Conditions for Building and Construction- (Category “A”: 37 5000 sq. m - 20000 sq. m) XI-3 263 Environmental Conditions for Building and Construction-(Category “B”: 38 20000 sq. m - 50000 sq. m) XI-3 265 Environmental Conditions for Building and Construction-(Category “C”: 39 50000 sq. m - 150000 sq. m) XI-3 267 40 Shelter Fee XIII 277 DRAFT ANDHRA PRADESH BUILDING RULES 2016 9 ANDHRA PRADESH BUILDING RULES-2016 LIST OF ANNEXURES Annexure Title of the Annexure Chapter Page No. (A) (B) (C) (D) 1 Competence of Licensed Technical Personnel III 279 Regulations for Registration of 2 III 281 Licensed Builder/Developer/Construction Firm 3 Undertaking for Obtaining Building Permission III 285 4 Road Widening Undertaking III 292 5 Water Supply and Sanitation Requirements 293 Adoption of Energy Conservation Building Code 6 VII 307 [ECBC] in A. P. Sites in Old/Existing Built-Up Areas/Congested 7 VIII Areas/Settlement/Gram Khantam/Abadi 8 Areas Prohibited for High Rise Buildings VIII DRAFT ANDHRA PRADESH BUILDING RULES 2016 10

Description:
height or the removal of part of building, or any change to the structure, such as the construction or openings shall be in accordance with IBC Table 704.8. (b) Interior Walls. (i) Load vermiculture pit with a minimum capacity of.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.