Algeria-Europe gas pipeline via Spain Haga clic para cambiar el estilo de título 1 INDEX I. Introduction to the Project I. Introduction to the Project II. Project Scope III. Project Phases IV. Key Points V. MEDGAZ: A Strategic Project VI. Timetable VII. Construction Process 2 I. INTRODUCTION TO THE PROJECT Background: (cid:190) 1970’s: • The idea of building a direct gas pipeline between Algeria and Europe arises. • Several feasibility studies take place. • Technical limitations prevent the construction and operation of an ultra deepwater pipeline. (cid:190) Year 2001: • The construction of an ultra deepwater pipeline is feasible. • CEPSA and Sonatrach found MEDGAZ. 3 I. INTRODUCTION TO THE PROJECT Objective: MEDGAZ is a company specially constituted to design, build, and operate an Algeria-Europe gas pipeline via Spain, to improve security of energy supply and meet growing demand for natural gas. MMEEDDGGAAZZ LNG terminals Main pipelines 4 I. INTRODUCTION TO THE PROJECT Shareholding : (cid:190) Founding members: IBERDROLA CEPSA CEPSA and Sonatrach 20% 20% ENDESA 12% SONATRACH (cid:190) Rest of shareholding: GdF 36% 12% Iberdrola, Endesa and Gaz de France 5 INDEX I. Introduction to the Project II. Project Scope II. Project Scope III. Project Phases IV. Key points V. MEDGAZ: A Strategic Project VI. Timetable VII. Construction process 6 II. PROJECT SCOPE Route Albacete Spanish Onshore Transversal Axis Algerian Onshore MEDGAZ Reception Terminal Compressor Station MEDGAZ 7 II. PROJECT SCOPE Technical Summary: (cid:190) Length: 210 km (cid:190) Diameter: 24 inches (cid:190) Capacity: 8 bcm/year (cid:190) Maximum Depth: 2,165 m (cid:190) Estimated Investment: 900 M€ (cid:190) Workforce: • Over 2,000 people (construction phase) • Over 100 persons (operation phase) 8 II. PROJECT SCOPE OffsMEhDoGrAeZ - PTriapnseploirntateio nP Sryostefmile OFFSHORE SECTION ALGERIA SPAIN 0 -100 -200 -300 -400 -500 -600 -700 -800 m) -900 h ( -1000 pt e -1100 D r -1200 e at -1300 W -1400 -1500 -1600 -1700 -1800 -1900 -2000 -2100 -2200 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 KP (km) 9 INDEX I. Introduction to the Project II. Project Scope III. Project Phases III. Project Phases IV. Key Points V. MEDGAZ: A Strategic Project VI. Timetable VII. Construction Process 10
Description: