DRAFT Project Manual 2018 Hangar and Taxilane Construction Windom Municipal Airport Windom, Minnesota AIP No. 3-27-0113-12-18 SP No. A1701-38 SEH No. WINDM 145757 May 1, 2018 This Page Left Blank Intentionally 2018 Hangar and Taxilane Construction Windom Municipal Airport Windom, Minnesota A.I.P. No. 3-27-0113-12-18 S.P. No. A1701-38 SEH No. BLWCA 140415 May 1, 2018 Title Page WINDM 145757 00 01 01 - 1 This Page Left Blank Intentionally DOCUMENT 00 01 05 CERTIFICATION I hereby certify that this specification was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Lindsay Reidt, PE Date: May 1, 2018 Lic. No. 49262 Reviewed By: Michael Hejna Date: May 1, 2018 Electrical Engineering I hereby certify that this specification was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Mark Ziemer, PE Date: May 1, 2018 Lic. No. 22509 Certification WINDM 145757 00 01 05 - 1 This Page Left Blank Intentionally DOCUMENT 00 01 08 PROJECT DIRECTORY Project Name: 2018 Hangar and Taxilane Construction Location: Windom Municipal Airport Owner Owner Name: Windom Municipal Airport Name: Windom Municipal Airport Address: 444 9th Street Address: 444 9th Street PO Box 38 PO Box 38 Windom, MN 56101 Windom, MN 56101 Contact: Steve Nasby, City Administrator Contact: Brian Underwood, Airport Manager Phone: 507.831.6129 Phone: 507.831.6129 Fax: Fax: E-mail: [email protected] E-mail: [email protected] Engineer Engineer Name: Short Elliott Hendrickson Inc. Name: Short Elliott Hendrickson Inc. Address: 3535 Vadnais Center Drive Address: 3535 Vadnais Center Drive Saint Paul, MN 55110-5196 Saint Paul, MN 55110-5196 Contact: Lindsay Reidt, PE Contact: Michael Hejna Phone: 763.370.4055 Phone: 651.490.2000 Fax: 888.908.8166 Fax: 888.908.8166 E-mail: [email protected] E-mail: [email protected] Architect Engineer Name: Short Elliott Hendrickson Inc. Name: Barr Engineering Address: 3535 Vadnais Center Drive Address: 4300 Market Pointe Dr., Suite 200 Saint Paul, MN 55110-5196 Minneapolis, MN 55435 Contact: Brian Bergstrom Contact: Mark Ziemer, PE Phone: 651l.490.2000 Phone: 952.832.2600 Fax: 888.908.8166 Fax: 952.832.2601 E-mail: [email protected] E-mail: [email protected] END OF DOCUMENT Project Directory WINDM 145757 00 01 08 - 1 This Page Left Blank Intentionally DOCUMENT 00 01 10 TABLE OF CONTENTS Number Document Introductory Information 00 01 01 Title Page 00 01 05 Certification 00 01 08 Project Directory 00 01 10 Table of Contents Bidding Requirements 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 31 32 Geotechnical Data 00 41 00 Bid Form 00 43 36 List of Proposed Subcontractors 00 43 37 List of Proposed Suppliers 00 45 19 Affidavit of Non-Collusion 00 45 47 Certification of Compliance 00 45 48 Certificate of Buy American Compliance for Total Facility Contract Forms 00 52 00 Standard Form of Agreement 00 61 13 Performance Bond 00 61 14 Payment Bond FAA General Provisions Section 10 Definitions and Terms Section 20 Proposal Requirements and Conditions Section 30 Award and Execution of Contract Section 40 Scope of Work Section 50 Control of Work Section 60 Control of Materials Section 70 Legal Regulations and Responsibility to Public Section 80 Execution and Progress Section 90 Measurement and Payment Section 100 Control Quality Control Program Section 105 Mobilization Conditions of the Contract 00 72 00 Standard General Conditions 00 73 00 Supplementary Conditions 00 73 30 Additional Special Provisions for Federally-Funded Contracts 00 73 36 State Funded Contract Special Provisions Division A 00 73 45 Minnesota Labor and Wage Rate Requirements DIVISION 1 - GENERAL REQUIREMENTS Summary 01 11 00 Summary of Work Price and Payment Procedures 01 25 13 Product Substitution Procedures 01 26 00 Contract Modification Procedures 01 29 10 Applications for Payment Table of Contents WINCM 145757 00 01 10 - 1 Administrative Requirements 01 31 19 Project Meetings 01 33 00 Submittal Procedures Quality Requirements 01 42 15 Specification Format Definitions and Abbreviations 01 42 18 Reference Standards for Infrastructure Improvements 01 45 10 Quality Control for Building Construction Temporary Facilities and Controls 01 51 36 Temporary Water 01 52 19 Temporary Sanitary Facilities 01 55 15 Maintenance and Restoration of Haul Roads 01 57 33 Application of Water for Dust Control Product Requirements 01 60 00 Product Requirements Execution and Closeout Requirements 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 37 Product Warranties DIVISION 8 - OPENINGS Specialty Doors and Frames 08 34 17 Bi-Fold Hangar Door System Hardware 08 71 00 Door Hardware DIVISION 10 - SPECIALTIES Information Specialties 10 44 00 Safety Specialties DIVISION 13 - SPECIAL CONSTRUCTION Special Structures 13 34 00 Fabricated Engineered Structures DIVISION 26 - ELECTRICAL 26 00 00 Electrical Installation DIVISION 31 - EARTHWORK Earth Moving 31 22 20 Earthwork for Building Sites 31 25 10 Stormwater Management DIVISION 32 - EXTERIOR IMPROVEMENTS Bases, Ballasts, and Paving Base Courses 32 11 22 Aggregate Base Table of Contents 00 01 10 - 2 WINDM 145757
Description: