100% CONSTRUCTION DOCUMENTS PROJECT MANUAL FOR THE MURPHY COURTS OF APPEAL BUILDING RENOVATION AND PARKING GARAGE AT THE 361 ROWE BOULEVARD ANNE ARUNDEL COUNTY ANNAPOLIS, MARYLAND 21401 FOR THE DEPT. OF GENERAL SERVICES DGS Contract No. BA-688-130-001 Project Cost Classification: E August 5, 2016 “Minority Business Enterprises are Encouraged to Respond to this Solicitation Notice” STATE OF MARYLAND DEPT. OF GENERAL SERVICES BOARD OF PUBLIC WORKS Ellington Churchill, Secretary Governor: Larry Hogan 301 West Preston Street Comptroller: Peter Franchot Baltimore, Maryland 21201 Treasurer: Nancy K. Kopp ARCHITECT BUSHEY FEIGHT MORIN/RICCIGREENE ASSOCIATES Joint Venture 473 North Potomac Street Hagerstown, Maryland 21740 DEPARTMENT OF GENERAL SERVICES Murphy Courts of Appeal DGS Project No. BA-688-130-001 BFM PROJECT NO. 14001 SPECIFICATION INDEX DIVISION 0 - CONDITIONS OF THE CONTRACT Section 00 01 07 - Seals and Signatures Page Section 00 01 15 - List of Drawings Section 00 80 00 - Prevailing Wage Rates (DGS has procured – To be issued with solicitation) DIVISION 1 - GENERAL REQUIREMENTS Section 01 10 00 - Summary 01 10 00-1 - 01 10 00-6 Appendix Index 1 Page Appendix 1: Maryland State Law Library Hours 2 Pages Appendix 2: Courts of Appeal Schedule 2 Pages Appendix 3: Court of Special Appeals Schedule 1 Page Appendix 4a: COMAR 26.02.03.02 3 Pages Appendix 4b: Annapolis, MD Code of Ordinances 1 Page Appendix 5: Contractors Security Clearance 1 Page Section 01 22 00 - Unit Prices 01 22 00-1 - 01 22 00-2 Section 01 23 00 - Alternates 01 23 00-1 - 01 23 00-2 Section 01 25 00 - Allowances 01 25 00-1 - 01 25 00-2 Section 01 32 30 - Photographic Documentation 01 32 30-1 - 01 32 30-2 Section 01 33 00 - Submittal Procedures 01 33 00-1 - 01 33 00-9 Section 01 40 00 - Quality Requirements 01 40 00-1 - 01 40 00-6 Section 01 41 00 - Inspection and Testing Laboratory Services 01 41 00-1 - 01 41 00-5 Section 01 42 00 - References 01 42 00-1 - 01 42 00-7 Section 01 50 00 - Temporary Facilities and Controls 01 50 00-1 - 01 50 00-8 Section 01 50 50 - Temporary Facilities and Controls – State Field 01 50 50-1 - 01 50 50-3 Office for Capital Improvement Projects Section 01 51 00 - Construction Waste Management 01 51 00-1 - 01 51 00-3 Section 01 52 00 - Construction Indoor Air Quality 01 52 00-1 - 01 52 00-10 Section 01 54 60 - Safety and Health 01 54 60-1 - 01 54 60-4 Section 01 56 39 - Temporary Tree and Plant Protection 01 56 39-1 - 01 56 39-11 Section 01 73 20 - Cutting and Patching 01 73 20-1 - 01 73 20-3 Section 01 77 00 - Closeout Procedures 01 77 00-1 - 01 77 00-5 Section 01 78 20 - Operation and Maintenance Data 01 78 20-1 - 01 78 20-5 Section 01 79 00 - Demonstration and Training 01 79 00-1 - 01 79 00-2 DIVISION 2 – EXISTING CONDITIONS Section 02 32 00 - Geotechnical Investigation 02 32 00-1 SaLUT-TLB Report 40 pages Section 02 41 19 - Selective Demolition 02 41 19-1 - 02 41 19-8 DIVISION 3 - CONCRETE Section 03 30 00 - Cast-in-Place Concrete 03 30 00-1 - 03 30 00-31 DIVISION 4 - MASONRY Section 04 01 00 - Maintenance of Masonry 04 01 00-1 - 04 01 00-4 Section 04 10 00 - Masonry Mortar and Grout 04 10 00-1 - 04 10 00-4 Section 04 43 00 - Stone Masonry 04 43 00-1 - 04 43 00-8 Section 04 81 00 - Unit Masonry Assemblies 04 81 00-1 - 04 81 00-9 Specification Index – Page 1 DIVISION 5 - METALS Section 05 12 00 - Structural Steel Framing 05 12 00-1 - 05 12 00-13 Section 05 31 00 - Steel Decking 05 31 00-1 - 05 31 00-7 Section 05 40 00 - Cold Formed Metal Framing 05 40 00-1 - 05 40 00-4 Section 05 50 00 - Metal Fabrications 05 50 00-1 - 05 50 00-4 Section 05 52 00 - Aluminum Horizontal Rod Infill Guardrail with 05 52 00-1 - 05 52 00-4 Illuminated Handrail Section 05 52 10 - Illuminated Ornamental Aluminum Handrails 05 52 10-1 - 05 52 10-4 Section 05 52 20 - Illuminated Ornamental Aluminum Wallrails 05 52 20-1 - 05 52 20-4 DIVISION 6 – WOOD, PLASTIC, AND COMPOSITES Section 06 11 20 - Framing and Sheathing 06 11 20-1 - 06 11 20-4 Section 06 11 40 - Wood Blocking and Curbing 06 11 40-1 - 06 11 40-3 Section 06 20 00 - Finish Carpentry 06 20 00-1 - 06 20 00-4 Section 06 41 00 - Architectural Wood Casework 06 41 00-1 - 06 41 00-6 DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section 07 10 10 - Waterproofing Protection Course 07 10 10-1 - 07 10 10-3 Section 07 13 26 - Self-Adhering Sheet Waterproofing 07 13 26-1 - 07 13 26-4 Section 07 18 00 - Traffic Coatings 07 18 00-1 - 07 18 00-8 Section 07 21 00 - Thermal Insulation 07 21 00-1 - 07 21 00-6 Section 07 22 00 - Roof and Deck Insulation 07 22 00-1 - 07 22 00-5 Section 07 26 10 - Below Grade Vapor Retarders 07 26 10-1 - 07 26 10-4 Section 07 27 26 - Fluid Applied Membrane Air Barriers 07 27 26-1 - 07 27 26-6 Section 07 54 50 - Fluid-Applied Membrane Roofing & Flashing 07 54 50-1 - 07 54 50-9 Section 07 71 00 - Manufactured Roof Specialties 07 71 00-1 - 07 71 00-2 Section 07 71 05 - Metal Soffit 07 71 05-1 - 07 71 05-4 Section 07 81 23 - Intumescent Paint 07 81 23-1 - 07 81 23-4 Section 07 90 00 - Joint Sealers 07 90 00-1 - 07 90 00-4 DIVISION 8 - OPENINGS Section 08 11 00 - Steel Doors and Frames 08 11 00-1 - 08 11 00-3 Section 08 12 15 - Custom Steel Doors - Thermally Broken 08 12 15-1 - 08 12 15-6 Section 08 30 50 - Access Doors 08 30 50-1 - 08 30 50-2 Section 08 44 35 - Glazed Steel Curtain Walls 08 44 35-1 - 08 44 35-6 Section 08 71 00 - Door Hardware 08 71 00-1 - 08 71 00-13 Section 08 71 50 - Swing Door Operator Visible Application Low Energy 08 71 50-1 - 08 71 50-6 Section 08 80 00 - Glazing 08 80 00-1 - 08 80 00-8 DIVISION 9 - FINISHES Section 09 11 10 - Metal Stud Framing System 09 11 10-1 - 09 11 10-4 Section 09 26 00 - Gypsum Board Systems 09 26 00-1 - 09 26 00-6 Section 09 66 23 - Epoxy-Resin Terrazzo Flooring 09 66 23-1 - 09 66 23-13 Section 09 68 00 - Carpeting 09 68 00-1 - 09 68 00-5 Section 09 90 00 - Painting 09 90 00-1 - 09 90 00-6 DIVISION 10 - SPECIALTIES Section 10 02 40 - Architectural Screens 10 02 40-1 - 10 02 40-3 Section 10 14 00 - Signage 10 14 00-1 - 10 14 00-2 DIVISION 12 – FURNISHINGS Section 12 52 19 - Upholstered Seating 12 52 19-1 - 12 52 19-2 DIVISION 21 – FIRE SUPPRESSION Section 21 05 53 - Labeling for Fire-Suppression Piping & Equipment 21 05 53-1 - 21 05 53-2 Section 21 10 00 - Water-Based Fire-Suppression Systems 21 10 00-1 - 21 10 00-9 Section 21 12 00 - Fire-Suppression Standpipes 21 12 00-1 - 21 12 00-7 Specification Index – Page 2 DIVISION 22 – PLUMBING Section 22 05 17 - Sleeves and Sleeve Seals for Plumbing Piping 22 05 17-1 - 22 05 17-3 Section 22 05 29 - Hangers and Supports for Plumbing Piping 22 05 29-1 - 22 05 29-7 and Equipment Section 22 11 13 - Facility Water Distribution 22 11 13-1 - 22 11 13-5 Section 22 13 19 - Sanitary Waste Piping Specialties 22 13 19-1 - 22 13 19-3 Section 22 14 13 - Facility Storm Drainage Piping 22 14 13-1 - 22 14 13-7 DIVISION 23 – HVAC Section 23 05 13 - Common Motor Requirements for HVAC Equipment 23 05 13-1 - 23 05 13-2 Section 23 05 19 - Meters and Gages for HVAC Piping 23 05 19-1 - 23 05 19-4 Section 23 05 23 - General-Duty Valves for HVAC Piping 23 05 23-1 - 23 05 23-9 Section 23 05 29 - Hangers and Supports for HVAC and Equipment 23 05 29-1 - 23 05 29-7 Section 23 05 48 - Vibration and Seismic Controls for HVAC 23 05 48-1 - 23 05 48-5 Section 23 05 53 - Identification for HVAC Piping and Equipment 23 05 53-1 - 23 05 53-4 Section 23 05 93 - Testing, Adjusting, and Balancing for HVAC 23 05 93-1 - 23 05 93-12 Section 23 07 13 - Duct Insulation 23 07 13-1 - 23 07 13-14 Section 23 07 19 - HVAC Piping Insulation 23 07 19-1 - 23 07 19-15 Section 23 09 00 - Instrumentation and Control for HVAC 23 09 00-1 - 23 09 00-13 Section 23 09 93 - Sequence of Operations for HVAC Controls 23 09 93-1 - 23 09 93-4 Section 23 21 13 - Hydronic Piping 23 21 13-1 - 23 21 13-8 Section 23 31 13 - Metal Ducts 23 31 13-1 - 23 31 13-11 Section 23 31 16 - Nonmetal Ducts 23 31 16-1 - 23 31 16-6 Section 23 33 00 - Air Duct Accessories 23 33 00-1 - 23 33 00-8 Section 23 37 13 - Diffusers, Registers, and Grilles 23 37 13-1 - 23 37 13-2 Section 23 73 13 - Modular Indoor Central-Station Air-Handling Units 23 73 13-1 - 23 73 13-9 Section 23 82 16.11 Hydronic Air Coils 23 82 16.11 - 23 82 16.11-2 DIVISION 26 – ELECTRICAL Section 26 01 00 - Basic Electrical Requirements 26 01 00-1 - 26 01 00-7 Section 26 05 19 - Low-Voltage Electrical Power Conductors & Cables 26 05 19-1 - 26 05 19-4 Section 26 05 29 - Hangers and Supports for Electrical Systems 26 05 29-1 - 26 05 29-6 Section 26 05 33 - Raceway and Boxes for Electrical Systems 26 05 33-1 - 26 05 33-9 Section 26 05 43 - Underground Ducts and Raceways for Electrical 26 05 43-1 - 26 05 43-10 Systems Section 26 05 44 - Sleeves & Sleeve Seals for Electrical Raceways 26 05 44-1 - 26 05 44-3 And Cabling Section 26 05 53 - Identification for Electrical Systems 26 05 53-1 - 26 05 53-7 Section 26 09 23 - Lighting Control Devices 26 09 23-1 - 26 09 23-4 Section 26 24 16 - Panelboards 26 24 16-1 - 26 24 16-4 Section 26 27 26 - Wiring Devices 26 27 26-1 - 26 27 26-6 Section 26 28 13 - Fuses 26 28 13-1 - 26 28 13-2 Section 26 28 16 - Enclosed Switches and Circuit Breakers 26 28 16-1 - 26 28 16-9 Section 26 51 00 - Interior Lighting 26 51 00-1 - 26 51 00-6 Section 26 56 00 - Exterior Lighting 26 56 00-1 - 26 56 00-3 DIVISION 28 – ELECTRONIC SAFETY & SECURITY Section 28 05 00 - Common Work Results for Security Systems 28 05 00-1 - 28 05 00-5 Section 28 05 13 - Cabling for Electronic Security Systems 28 05 13-1 - 28 05 13-4 Section 28 13 00 - Card Access Control System 28 13 00-1 - 28 13 00-6 Section 28 23 00 - Video Surveillance System 28 23 00-1 - 28 23 00-4 Section 28 23 10 - Security Intercom 28 23 10-1 - 28 23 10-7 DIVISION 31 – EARTHWORK Section 31 10 00 - Site Clearing 31 10 00-1 - 31 10 00-3 Section 31 20 00 - Earth Moving 31 20 00-1 - 31 20 00-13 Section 31 23 19 - Dewatering 31 23 19-1 - 31 23 19-4 Section 31 50 00 - Excavation Support and Protection 31 50 00-1 - 31 50 00-5 Specification Index – Page 3 DIVISION 32 – EXTERIOR IMPROVEMENTS Section 32 12 16 - Asphalt Paving 32 12 16-1 - 32 12 16-7 Section 32 13 13 - Concrete Paving 32 13 13-1 - 32 13 13-12 Section 32 13 73 - Pavement Joint Sealers 32 13 73-1 - 32 13 73-4 Section 32 17 23 - Pavement Markings 32 17 23-1 - 32 17 23-3 Section 32 32 23 - Segmental Retaining Walls 32 32 23-1 - 32 32 23-8 Section 32 91 13 - Soil Preparation 32 91 13-1 - 32 91 13-12 Section 32 93 00 - Plants 32 93 00-1 - 32 93 00-16 DIVISION 33 - UTILITIES Section 33 05 10 - Utility Structures 33 05 10-1 - 33 05 10-5 Section 33 41 00 - Storm Utility Drainage Piping 33 41 00-1 - 33 41 00-5 Specification Index – Page 4 DIVISION 0 CONDITIONS OF THE CONTRACT SECTION 00 01 07 SEALS AND SIGNATURES
Description: