Arlington Central School Senior Center / HHS Renovation Progress Photo-documentation 1-5-21 PTBC Meeting VERTEX 1 Repaired joists at raised floor at new switchgear in mechanical room 2 Removal of existing wood flooring to deck on 1st floor 3 Removal of rejected east entry concrete pad 4 Second pour of new concrete pad at east entry 5 Ductwork on 1st Floor 6 Rigging steel beam for operable partition through 1st Floor window. 7 Rigging steel beam for operable partition through 1st Floor window. 8 Operable partition track installation 9 Operable partition track on 1st Floor 10