ebook img

Approved vendor list for Electrical Items w.e.f 1st July 2016 to 31th December 2016 PDF

197 Pages·2016·3.18 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Approved vendor list for Electrical Items w.e.f 1st July 2016 to 31th December 2016

Page No. Effective From Valid Till Master List No. Version No. Page 1 of 197 01-07-2016 31-12-2016 EL-M-7.1-1 12.0 Page No. Effective From Valid Till Master List No. Version No. Page 2 of 197 01-07-2016 31-12-2016 EL-M-7.1-1 12.0 PREFACE 1. The Master List of vendors for manufacture and supply of items/equipment of Electric Locomotives, EMU, TL & AC (for coaches), equipment & conductors for 25 kV AC Traction Installations and Energy Management approved by RDSO is updated upto 30th June 2016. The items are grouped directorate-wise. The specification/ drawing/STR number of each of the items has been given in column No. 3. 2. There is no Part- I or Part– II category for approved sources for repair/ rehabilitation of major equipments of electric Locomotive and EMU. 3. Vendors approved for manufacture and supply of items/equipment have been categorized as ‘Part – I’ and ‘Part – II’ and are situated in column Nos. 4 & 5 respectively of this List. The definition of Part – I and Part – II vendors is as follows: Part –I Category: This is the regular category of approval. The firms in this category have been assessed to possess requisite infrastructure to produce consistent quality material up to the assessed production capacity with regular monitoring of quality assurance system. Part –II Category: This is the initial category of approval which has been granted based on asssessment of infrastructure facilities available and satisfactory demonstration of production of samples as per specification. The firms possesss the requisite infrastructure but their capability to consistently produce the quality material giving satisfactory service life in field is yet to be established. A firm can also be placed under Part- II category due to downgradation from Part- I category owing to specific cause. 4. Registration of vendors, Upgradation of vendors from Part-II to Part-I, Downgradation of vendors from Part-I to Part-II, Temporary / Permanent delisting of vendors will be done as per latest RDSO’s relevant ISO guidelines. 5. The Master List is divided in five parts and consists of XII chapters in all. Part A contains items/equipment pertaining to Elecric Loco. Part B contains items/equipment pertaining to EMU and TL & AC (coaches). Part C contains items pertaining to equipment and conductors for 25 kV AC Traction Installation. Part D contains items/equipments pertaining to Elecric Loco, EMU and TL & AC (for coaches) and equipment & conductors for 25 kV AC Traction Installation dealt by Quality Assurance (Electrical) Directorate. Part E contains items/equipment pertaining to Energy Management. Region-wise Vendor’s name and addresses in full, their telephone, Fax numbers & Email address have been given at the end of each Part in Chapters II, V, VIII and X respectively, Distribution list is given in Chapter XII. 6. This Master List, read with any amendments issued in the future from time to time, is valid from 01.07.2016 to 31.12.2016. 7. Sources for EMU and TL & AC coaches are being developed in line with instructions issued by RB vide their letter No. 2001/Elec (G)/165/16 dt. 30.09.2008 & 2010/Elect. (Dev) 225/ 1 dt. 07.06.2010. 8. Sources for Electric Loco Items are being developed in line with instructions issued by Rly. Board’s letter No. 97/Elect (TRS)/113/4 dt. 7.7.1999, 5.1.2000 & 25.7.2001, 98/Elect (Dev)/440/18/16 dt.9.8.1999, 96/Elect (TRS)/441/25Vol.II dt. 16.12.03, 2003/Elect (TRS)/138/1/pt.2 dt. 20.9.04, 2003/Elect(TRS)/138/1 Pt. dt.12.7.04, 99/Elect(TRS)/441/2 dt. 23.6.05, 99/Elect(TRS)/113/20 Pt. dt. 28.10.02, 2005/Elect (TRS)/441/11 dated 7/9/2005, 2003/Elect (TRS)/ 138/1/pt.2 dated27.2.2006, 97/Elect.(TRS)/113/4 Pt. II dated 11.10.2006, 2010/Elect. (Dev) 225/1dt. 07.06.2010and 97/Elect (TRS)/113/4 Part II dated 15.3.2011. Page No. Effective From Valid Till Master List No. Version No. Page 3 of 197 01-07-2016 31-12-2016 EL-M-7.1-1 12.0 9. The policy to be followed in respect of procurement of OHE and PSI items has been clarified in Rly. Board’s letter No. 2001/RE/161/12 dt. 31.10.2001 and 2010/Elect (Dev) 225/1 dt.07.06.2010. 10. Sources for Energy Management are being developed in line with instructions issued by Rly. Bd. vide their letter No. 2006/Elect(G)/150/9/Pt.I, dated 03.12.2015. 11. Traction Installation items of 2x25 kV AT system and conventional 25 kV BT system having common specification are given in Chapter VI. However, the items exclusive to 2x25 kV AT systems are given in Chapter – VII. 12. Chapter VI and VII for Traction Installation items does not include the approved suppliers for parts, fittings and accessories for power transformer and interlocks for circuit breaker, interrupters and isolators. These equipments/ accessories are normally required by the manufacturers of power transformers, circuit breakers, interrupters and isolators. Suppliers for these equipments/accessories will be recommended by RDSO in the specification of respective equipment. 13. The directorate-wise total no. of item-groups and total no. of itemsappearing in this vendor directory are as follows: S.N. Directorate No. of item-groups No. of items 1 Electrical Directorate 43 103 2 PS&EMU directorate 26 62 3 Traction Installation Directorate 18 97 4 QA (Electrical) Directorate 14 86 5 Energy Management 02 02 14. To facilitate the procuring agency in nominating the inspecting agency, a region-wise list of vendors is given. The region-wise list is only for guidance of procuring agencies and is in no way meant to restrict the choice of vendors during tendering by Railways, on regional basis. 15. The figures given in brackets against each firm (wherever furnished by firm) are the annual manufacturing capacity, committed to Railways by the firms. The annual production capacities of the vendors have been indicated in the vendor list to the extent available. These figures are dynamic and may change from time to time, as the vendors keep on making adjustments in their product-wise capacity. These capacity figures are based on declarations of the vendors only and, in many cases, yet to be verified by RDSO. The production capacity figures indicated in this vendor list are only indicative and in no way meant to influence the decisions of the Tender committees while deciding the tenders. 16. Vendor’s Responsibility: If due to any oversight/typographical error or any other reason, a vendor has been incorrectly placed in Part-I or Part-II for a particular item, then: the vendor shall immediately inform RDSO about the error (as per ISO Doc. No. QO-D- 7.1-9 Ver- 4.0). 17. The Indian Firm/ Partner/ Representative, if any, should be treated as sales Representative of OEM subject to having valid MOU or Agreement wih OEM. The validity of MOU/ Agreement should be verified by RDSO from the OEM at the time of granting approval. Railways while placing order should re-verify the validity of MOU/ Agreement wih OEM. 18. Changes in Vendor Directory: Approvals granted in the intervening period between the issue of this directory and the next directory to be issued should be considered as valid on the basis of the approval letters issued by competent authority of RDSO. Such changes in the vendor directory (e.g. addition/ deletion/ upgradation/ downgradation, etc.) would be made available through amendments. The Vendor directory and its Page No. Effective From Valid Till Master List No. Version No. Page 4 of 197 01-07-2016 31-12-2016 EL-M-7.1-1 12.0 subsequent amendments shall be available at the RDSO web-portal www.rdso.indianrailways.gov.in accessible through the Internet. 19. Whenever inspection of item(s), for which a vendor is approved, is withheld/suspended, the status of the firm shall remain unchanged i.e. for all purposes, the approval status of the vendor shall be as indicated in the vendor directory. 20. Procedure to be followed if samples are picked up from consignee end by RDSO or any vigilance organization: In case samples are picked up from consignee end by RDSO or any vigilance organization, three samples shall be picked up and initially 1st sample shall be tested and if it is passed to conform to the requirements of the specification/drawings, no more tests need to be done. However, as soon as 1st sample fails, consignee shall be advised about the same with the direction that no further material from the suspect lot shall be issued / consumed. Decision on 2nd/3rd sample to be taken within four weeks. In case 2nd/3rd sample fails, then the said lot shall be considered as rejected. Consignee shall be informed immediately and the further action shall be taken by the consignee as per Railway Board’s letter No.2000/RS(G)/379/2 dated 13.03.2009 (excluding para 3.0) for material inspected by RDSO. 21. Footnotes/ Remark, whenever provided, may be referred to, for additional information. 22. Issues of a purely technical nature (e.g. specification, drawing, etc.)in respect of QA/Elect.controlled items should also be addressed to the concerned design Directorates. 23. Contact Adresses for clarification: 23.1Office address and phone no. of different Directorates are as follows: S.N. Directorate Designation Phone / E-mail Address Cell no. 1 Electrical Directorate EDSE (Co-ordination) 0522- [email protected] 2450374 2 PS&EMU ED/PS&EMU 0522- [email protected] Directorate 2454070 3 Traction Installation ED /TI (Co-ordination) 0522- [email protected] Directorate 2450709 4 QA (Elect.) ED/EM 0522- [email protected] Directorate 2455109 5 Energy Management ED/EM 0522- [email protected] Directorate 2455109 23.2 Contact details of controlling ED/ Directors: Controlling ED/ Director of the item is the right person to be contacted on matters relating under approval/technical matters. The contact details of controlling ED/ directors are as follows: S. Directorate Designation Cell No. Fax No. E-mail ID No 1. Electrical EDSE 9794863131 0522-2450374 [email protected] DSE/TPL 9794863196 0522-2465737 [email protected] DSE/C&S 9794863201 0522-2465754 [email protected] DSE/PS&SC 9794863133 0522-2450374 [email protected] DSE/TM 9794863138 0522-2465716 [email protected] 2. Traction DTI/OHE/E 9794863134 0522-2465765 [email protected] Insttalation DTI/OHE/D 9794863253 0522-2465731 [email protected] DTI/PSI 9794863250 0522-2465763 [email protected] 3. PS&EMU DSE/TL&AC 9794863059 0522-2465738 [email protected] Page No. Effective From Valid Till Master List No. Version No. Page 5 of 197 01-07-2016 31-12-2016 EL-M-7.1-1 12.0 DSE/PE&Battery 9794863121 0522-2465717 [email protected] DSE/3Ph.EMU 9794863258 0522-2462406 director.3phemu.metro@g &Metro mail.com DSE/Conv.EMU 9794863252 0522-2450651 [email protected] DSE/MRVC 9794863238 0522-2451776 [email protected] 4. QA(Elect.) Director/QA(Elect.) 9794863249 0522-2465741 [email protected] 5. Energy Director/EM 9794863107 0522-2461152 [email protected] Management 23.3 The addresses of QA/ElectricalDte’sinspection unit are follows: The QA/ElectricalDte has inspection cells located at the following addresses for carrying out various inspection activities at those locations: S. Inspection Designation Cell No. Fax No. E-mail ID No Cell 1. Bhopal ED/Inspection/Bhopal 9752031000 0755- [email protected] 2500416 2. Jhansi Director/QA(Elect.) 9794863249 0522- [email protected] 2465741 24. For compliance to Rly Bd’s letter no. 2010/RS (G) 363/1 dt 05.07.2012 regarding ‘Public Procurement Policy’ for goods procured and services rendered by Micro and Small Enterprises (MSEs),data of approved vendors identifying MSEs and among them those belonging to SC/STs have been provided under column ‘Category’ &‘Ownership’ for enterprise/firm’s category and its ownership respectively in the table of ‘Details of the Vendors’ in the following manner:- I) Category of Firm/Enterprises-‘M’ for Micro Enterprises, ‘S’ for Small Enterprises and ‘OTH’ for Other than Micro/Small Enterprises. II) Ownership of Firm/Enterprises-‘SC’ for Scheduled Castes, ‘ST’ for Scheduled Tribes and (OTH) for Other than Scheduled Castes/Scheduled Tribes. 25. The name 0f sister concerns have been mentioned against each item of VendorDirectory wherever applicable.This should be kept in view (wherever applicable) to highlight the fact that the competing firms are sister concerns while dealing with Tenders. 26. Railway Board’s guidelines for dealing with Cartel formation: Some of the important letters issued by Rly. Boards on matters relating to Cartel formation by vendors are as follows: i) Rly. Board’s letter No.2001/RS(G)/779/4 dated 05.08.2002 ii) Rly. Board’s letter No.99/RS(G)709/1 dt 03.05.2005 iii) Rly. Board’s letter No.2005/RS(G)/709/1 dt 17.11.2006 iv) Rly. Board’s letter No.2001/RS(G)/779/4 dt 12.12.2006 However, the procuring agency should also refer to any further instructions issued by Rly. Board on the above subject, if any. 26.1 Rly. Bd’s letter no.2001/RS(G)/779/4 dt 05.08.2002, is reproduced as follows: No.2001/RS(G)/779/4 New Delhi dt 05.08.2002 The General Managers, All Indian Railways Including CLW, DLW, ICF, RCF & WAP East Coast Railway, Bhubaneshwar, East Central Railway, Hajipur, North Central Railway, Allahabad, North Western Railway, Jaipur, Page No. Effective From Valid Till Master List No. Version No. Page 6 of 197 01-07-2016 31-12-2016 EL-M-7.1-1 12.0 South Western Railway, Banglore, West Central Railway, Jabalpur, The General Manager (Const), N.F. Rly.Guwahati. CAOs (Const), All Indian Railways (except NF Rly) The Director General, RDSO, Lucknow The General Manager, Central Organisation for Rly. Electrification, Allahabad The General Manager, Metro Railway, Kolkata CAO, Diesel Component Works, Patiala CAO, COFMOW, Rly. Offices Complex, Tilak Bridge, New Delhi. Sub: Cartel formation by approved vendors. A number of references have been received from Railways/PUs regarding cartel formation by approved vendors and consequent substantial increase in rates in tenders. In such cases, even the negotiations have not helped in obtaining significant reduction in prices. This issue was discussed in detail in the 56th Conference of Controller of Stores at Rly. Bd on 13th/14th June, 2002 and it emerged that most of the approved vendors are taking undue advantage of Railways policy of bulk quantity procurement only from approved sources. 2. After having considered the matter in detail, it has been decided that the tender documents may include following conditions. a) Whatever all or most of the approved firms quote equal rates and cartel formation is suspended. Railways reserve the right to place order on one or more firms with exclusion of the rest without assigning any reasons thereof. b) Firms are expected to quote for a quantity not less than 50% of tendered quantity. Offers for quantity less than 50% of tendered quantity will be considered unresponsive and liable to be rejected in case cartel formation is suspected. Railways, however, reserve the right to order on one or more firm any quantity. c) The firm who quote in cartel may be warned that their names are likely to be deleted from list of approved sources. 3. Selection of one or more firms as per Para 2(a) above, may be on the basis of past performance records,capability, capacity, quality performance, location after sales service response etc. subjects to rates being considered reasonable. Wherever tendered quantity is quite large and the capacity of approved firms individually is small, minimum 50% quantity limit as per para 2(b) may be suitably modified in tender conditions. Further, Railways may report the details of firms found involved in forming cartel to source approving authority for considering down gradation/deletion of names of such firms from list of approved sources. 4. The instructions contained in Board’s letter no.99/RS(G)/709/1. Dt 6.09.99 of ordering not more than 15% of quantity of Part II approved sources and 5% of quantity on new source are to be followed in normal circumstances. Wherever there is suspected cartel Page No. Effective From Valid Till Master List No. Version No. Page 7 of 197 01-07-2016 31-12-2016 EL-M-7.1-1 12.0 formation from approved sources, after recording the reasons, railways are permitted to place orders on Part II sources and new cources beyond 15 % and 5% respecitively. 5. Despite above measures, if there is not success in breaking cartel. Further recourse as may be deemed fit, including taking up the matter with MRTP commission or proposed competition commission of India (as and when it is set up) may be considered. 6. This issue with concurrence of finance directorate of Ministry of Railways. Sd/- (P.C. Sharma) Executive Director Railway Stores (G) Railway Board No. 2001/RS(G)/779/4 Copy to: The COSs, all Indian Railways/Production Units. FA & CAOs, all Indian Railways & Production Units. Executie Director, Iron & Steel 3, KoilaGhat Street, Kolkata. The Director of Audit, All Indian Railways. The Managing Director, RITES, New Delhi House, Barakhamba Road, New Delhi. Sd/- (P.C. Sharma) Executive Director Railway Stores (G) Railway Board Copy to : AM(RS), AM(L), AM(ME), AM(PU), AM(F), AM(CE), AM(TELE), AM(Sig), EDRS (C), EDRS(P), EDRS(S), EDV(v), EDF(S), EDME(Traction), EDEE(Dev), EDEE (G), F(S)-I, F(S)-II, and all other offcers and Branches of Stores Dte. Sd/- (P.C. Sharma) Executive Director Railway Stores(G) Railway Board Page No. Effective From Valid Till Master List No. Version No. Page 8 of 197 01-07-2016 31-12-2016 EL-M-7.1-1 12.0 INDEX P A R T ‘A’ : ELECTRIC LOCO CHAPTER NO. CHAPTER TITLE S.N. ITEM PAGE CHAPTER-I SECTION-A 1. Cable Transit System 13 2. Carbon brush 13 3. All types of roller and ball bearings 14 Items being dealt by Electrical 4. Items common for Traction Motor type HS 15250A & TAO 659 16 Directorate 5. Items only for Traction Motor TAO-659 19 6. Items for Hitachi traction motors: Type: HS-15250A 20 7. Lubricants for 3 Phase locomotives 27 8. Microprocessor based energy cum speed monitoring unit 27 9. Microprocessor based control and fault diagnostic system 27 10. Vigilance Control Device to be usedin 25 KV AC Tap 27 changer Locomotive 11. 180 KVA Static converter for AC electric locomotives 27 12. Axle Box Bearing and Complete Axle Box Assembly 27 13. Bearings for Aluminium Gear Case of WAP5 28 14. Transfomer Tank 28 15. Transformer oil 28 16. Vacuum Circuit Breaker 28 17. Rubber Components for transmission system of 3-phase 29 locomotives 18. Rubber Components for brake system for 3-phase locomotives 29 19. Brake system for 3-phase locomotives 29 20. Main compressor 29 21. Lead acid Batteries for Electric Locos 30 22. Pantographs 30 23. Spares for Pantograph 31 24. Matalised carbon Strip for Pantographs 31 25. Crowned Gear Coupling for WAP5 32 26. Aluminium Gear Box for WAP5 32 27. Cooling unit for Three Phase Locomotive 32 28. Mechanical Items for Traction Motors 33 Page No. Effective From Valid Till Master List No. Version No. Page 9 of 197 01-07-2016 31-12-2016 EL-M-7.1-1 12.0 29. Tri Plate Panel for Conventional Electic Locomotive 40 30. Stick Type Master Controller 40 31. Axle Box Housing with Grease nipple (Without Bearing) 40 32. Bonded Rubber Sandwich Ass. For TAO & Hitachi 40 33. Spring Seat Assembly for WAM-4 & WAG-5 Locos 40 34. TBU Assembly for WAG-7 Class 41 35. Gear in 2 Halves 41 36. TM Suspension bearing Oil pump 41 37. Metallic Pinion for SB oil Pump 41 38. Nylon Pinion for SB Oil pump 41 39. End Shield of Auxiliary motors 41 40. ARNO Converter 120 KVA 41 41. Hotel Load Converter for WAP-7 Locomotives (2X500 KVA) 42 42. New items assigned to RDSO 42 43. Sources for repair / rehabilitation of major equipments of 42 Electric Locomotives & EMU CHAPTER-I SECTION-B 1. Loco Brake Equipment 49 2. Air dryer 50 3. Air brake rubber components 50 Items being dealt by other 4. Suspension Coil Spring for Locomotive 51 Directorates 5. Snubber Assembly for Locomotive 51 Loco Brake Equipment 6. High Tensile CBC Coupler & its Components for Locomotives 51 7. High Capacity Draft Gear 52 8. Screw Coupling 53 9. Three axle cast steel trimount and Flexicoil bogie frame for BG 53 Locomotives 10. Fabricated Bogie frame & Bolster Assembly for Locomotive 53 11. Conical Thrust pad 53 12. TPU Spring Pads (Happy Pad) for Locomotives 53 13. Hose Coupling Assembly for freight &Coaching stock 53 14. Locomotive side buffer assembly and its spares 53 15. L’ Type Composition Brake Block 53 16. Lubricants (For conventional Locos) 54 Page No. Effective From Valid Till Master List No. Version No. Page 10 of 197 01-07-2016 31-12-2016 EL-M-7.1-1 12.0 REGION-WISE LIST OF ELECTRIC LOCO ITEMS 55-94 CHAPTER – II FIRMS & THEIR ADDRESS P A R T ‘B’: EMU AND TL&AC CHAPTER-III Items being dealt by 1. EMU transformer 95 2. Traction Motor 95 PS&EMU Directorate 3. Bearings 95 4. Microprocessor- based electronic speed indicating- cum -recording 96 and energy monitoring system for 25 KV AC EMU, MEMUs & 1500 V DC EMUs 5. Lubricants 96 6. LED based Tail Light 97 7. Rubber and Metal bonded Rubber Components for the valves of EP 97 brake systems 8 LED based head code, GPS based passenger information and public 98 address system for EMUs/MEMUs CHAPTER-IV Items being dealt by 1. Battery 99 2. ERRU 99 PS&EMU Directorate 3. Microprocessor controller for roof mounted AC package unit for 100 LHB coaches and double decker EQUIPMENT FOR TRAIN 4. BLDC fan 100 5. Endless ``v’’ belt for railway coaches 100 LIGHTING & AIR 6. Brushless Alternator with rectifier regulator along with Belt 100 CONDITIONING tensioningDevice. 7. Axle/ Alternator Pulleys for TL & AC coaches 101 8. Roof mounted AC Package Units 101 9. 415 V, 3-phase induction motor for roof mounted AC package units. 101 10. 25 kVA under-slung inverter 102 11. Battery Charger 102 12. DA Set for Power Car 102 13. Step Down Transformer for EOG Coaches 103

Description:
Traction Installations and Energy Management approved by RDSO is The Master List is divided in five parts and consists of XII chapters in all. pertaining to Elecric Loco, EMU and TL & AC (for coaches) and equipment & for EMU and TL & AC coaches are being developed in line with instructions.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.