ebook img

Appendix A Test frame fabrication drawings - TSpace - University of PDF

132 Pages·2013·4.87 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Appendix A Test frame fabrication drawings - TSpace - University of

Appendix A Test frame fabrication drawings This appendix provides the drawings that were provided to the fabricators to fabricate the test frame. The drawings for the first-storey brace are included after the drawings for the rest of the frame because the original intent was to lock the SCED brace closed for tests in the 0V configurations. A conventional brace was used instead after calibration of the SCED brace showed that the planned lock-off device was not effective. A-1 Rocking Steel Frame UNIVERSITY of TORONTO Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Départment des génies civil, géologique et des mines Bill of Materials: Tube and Angle Sections Total Part # Description Page Section Weight (kg) # Required Material Weight (kg) C1 Bottom Left Column PT1 HSS127x76x4.8 67 1 67 ASTM A500-C C2 Bottom Right Column PT1 HSS127x76x4.8 67 1 67 ASTM A500-C C3 Top Left Column PT2 HSS127x76x4.8 61 1 61 ASTM A500-C C4 Top Right Column PT2 HSS127x76x4.8 61 1 61 ASTM A500-C BMT Typical Beam Section PT3 HSS76x76x8.0 31 7 217 ASTM A500-C BM0 Beam 0 Section PT3 HSS76x76x8.0 30 1 30 ASTM A500-C BM1 Beam 1 Section PT3 HSS76x76x8.0 30 1 30 ASTM A500-C BM8 Beam 8 Section PT3 HSS76x76x8.0 40 1 40 ASTM A500-C BRT Typical Brace Section PT4 HSS76x76x8.0 39 4 156 ASTM A500-C BR2 Brace 2 Section PT4 HSS76x76x8.0 39 1 39 ASTM A500-C BR5 Brace 5 Section PT4 HSS76x76x8.0 39 1 39 ASTM A500-C BR8 Brace 8 Section PT4 HSS76x76x8.0 23 2 46 ASTM A500-C B TU1 Stiffening Tube for PT Anchorage PT17 HSS203x152x13 62 1 62 ASTM A500-C A SB Side Bumper PT19 L102x76x6.4 1 8 10 300W SUBTOTAL 925 REVISIONS REV. DESCRIPTION DATE A Side bumpers added 2010-07-05 B TU1 changed to HSS203x152x13 2010-07-05 UNIVERSITY of TORONTO Project Title REV Date Rocking Steel Frame 4 2010/07/08 Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Drawing Title Designer Drawing No. Départment des génies civil, géologique et des mines Bill of Materials 1/5 LDW LW05-BM1 Rocking Steel Frame UNIVERSITY of TORONTO Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Départment des génies civil, géologique et des mines Bill of Materials: Plates (1/3) Plate Thickness Total Part # Description Page Weight (kg) # Required Material (inches) Weight (kg) CPTS Typical Short Connection Plate PT5 0.5 7 6 43 300W CPTL Typical Long Connection Plate PT5 0.5 8.5 5 43 300W CP0 Connection Plate for Beam 0 PT6 0.75 12 2 24 300W CP1L Long Connection Plate for Beam 1 PT6 0.5 9 1 9 300W CP4L Long Connection Plate for Beam 4 PT7 0.5 8 1 8 300W CP4S Short Connection Plate for Beam 4 PT7 0.5 7 1 7 300W CP4U Connection Plate for Beam 4U PT7 0.5 7 2 14 300W GBR Typical Gusset Plate with Braces PT8 0.5 13 1 13 300W Typical Gusset Plate without GNO PT8 0.5 6 2 13 300W Braces Typical Mass-Connecting Gusset GMBR PT8 0.5 13 2 26 300W Plate with Braces Typical Mass-Connecting Gusset GMNO PT8 0.5 6 3 18 300W Plate without Braces G8 Storey 8 Gusset Plate PT9 0.5 14 1 14 300W Storey 4 Gusset Plate without G4NO PT9 0.5 13 1 13 300W Braces G1 Storey 1 Gusset Plate PT9 0.5 21 1 21 300W G4BR Storey 4 Gusset Plate with Braces PT9 0.5 14 1 14 300W SUBTOTAL 280 UNIVERSITY of TORONTO Project Title REV Date Rocking Steel Frame 3 2010/06/26 Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Drawing Title Designer Drawing No. Départment des génies civil, géologique et des mines Bill of Materials 2/5 LDW LW05-BM2 Rocking Steel Frame UNIVERSITY of TORONTO Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Départment des génies civil, géologique et des mines Bill of Materials: Plates (2/3) Plate Thickness Total Part # Description Page Weight (kg) # Required Material (inches) Weight (kg) G5 Storey 5 Gusset Plate PT10 0.5 13 1 13 300W GE8 Storey 8 End Plate PT10 0.5 2 1 2 300W G7BR Storey 7 Gusset Plate with Braces PT10 0.5 11 1 11 300W Storey 7 Gusset Plate without G7NO PT10 0.5 11 1 11 300W Braces P1 PT Anchorage Plate PT12 0.5 4 2 7 300W P2 Top Plate PT12 0.75 30 2 61 300W P3 Upper Joint Vertical Stiffener PT12 0.5 1 12 17 300W P4 Upper Joint Horizontal Stiffener PT12 0.5 2 4 8 300W P5 Small Stiffener PT12 0.5 1 12 7 300W P7 Base Plate PT13 0.75 6 2 11 300W Base Plate for Upper Rocking P8 PT13 0.75 6 2 11 300W Section A P9 Cap Plate PT13 1.5 18 2 36 300W SUBTOTAL 195 REVISIONS REV. DESCRIPTION DATE A P9 redesigned using PL 1.5" 2010-08-30 UNIVERSITY of TORONTO Project Title REV Date Rocking Steel Frame 4 2010/08/30 Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Drawing Title Designer Drawing No. Départment des génies civil, géologique et des mines Bill of Materials 3/5 LDW LW05-BM3 Rocking Steel Frame UNIVERSITY of TORONTO Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Départment des génies civil, géologique et des mines Bill of Materials: Plates (3/3) Plate Thickness Total Part # Description Page Weight (kg) # Required Material (inches) Weight (kg) FP1 Foundation Plate PT16 2.0 317 2 634 300W Foundation Plate for Post- FPT PT16 2.0 143 - - 300W B Tensioning B FP2 Lateral Stop PT16 0.5 1 - - 300W B FP3 Connection Plate for PT Anchorage PT17 0.5 4 - - 300W FR3 Lower Distribution Plate PT18 0.5 2.5 12 30 300W FR4 Upper Distribution Plate PT18 0.5 1.3 A 12 16 300W C PTP1 Threaded Rod Plate PT19 1.0 5 4 20 300W C PTP2 PT Bottom Plate PT19 1.0 8 1 8 300W SUBTOTAL 708 TOTAL 2108 REVISIONS REV. DESCRIPTION DATE A Corrected required number of FR4, weights 2010-07-01 B FPT, FP2, and FP3 are no longer required 2010-07-05 C PTP1 and PTP2 added 2010-07-05 UNIVERSITY of TORONTO Project Title REV Date Rocking Steel Frame 4 2010/07/01 Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Drawing Title Designer Drawing No. Départment des génies civil, géologique et des mines Bill of Materials 4/5 LDW LW05-BM4 Rocking Steel Frame UNIVERSITY of TORONTO Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Départment des génies civil, géologique et des mines Bill of Materials: For Machine Shop Plate Thickness Total Part # Description Page Weight (kg) # Required Material (inches) Weight (kg) SP1 Shear Bearing Plate without Braces PT11 1.5 43 1 43 350W SP2 Shear Bearing Plate with Braces PT11 1.5 67 1 67 350W Upper Shear Bearing Plate without SP3 PT11 1.0 25 1 25 350W Braces Upper Shear Bearing Plate with SP4 PT11 1.0 30 1 30 350W Braces A P6 Mass Connection Plate PT13 1.5 3 8 24 350W P10 Mass Strut Bolt Holder PT13 0.625 0.5 16 8 350W BP1 Horizontal Plate for Lower Bumper PT14 0.75 20 2 40 350W BP2 Vertical Plate for Lower Bumper PT14 1.5 12 2 24 350W BP3 Stiffener for Lower Bumper PT14 1.75 4 2 8 350W BP4 Horizontal Plate for Upper Bumper PT15 0.75 12 2 24 350W BP5 Vertical Plate for Upper Bumper PT15 0.75 4 2 8 350W BP6 Stiffener for Upper Bumper PT15 1.25 4 2 8 350W FR1 Lower Friction Plate PT18 0.5 6 4 22 350W FR2 Upper Friction Plate PT18 0.5 4 4 16 350W TOTAL FOR MACHINE SHOP 347 REVISIONS REV. DESCRIPTION DATE A P6 is made from 1.5" plate 2010-07-08 UNIVERSITY of TORONTO Project Title REV Date Rocking Steel Frame 4 2010/07/08 Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Drawing Title Designer Drawing No. Départment des génies civil, géologique et des mines Bill of Materials 5/5 LDW LW05-BM5 Rocking Steel Frame UNIVERSITY of TORONTO Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Départment des génies civil, géologique et des mines Bill of Materials: Bolt Assemblies Connection Bolt Type Bolt Length # Required Note Foundation Plate to Table 1" threaded rod 17 at EPM Mass Connection Pins 1" A325 4" 8 at EPM Lower Bumper to Foundation Plate (tapped holes) 3/4" A325 2" 24 Lower Friction Assembly - Pin through Stiffener 3/4" A325 4" 2 at EPM A Lower Friction Assembly - Normal Force on Friction Interface 3/4" A325 6 3/4" 4 possible? Lower PT Anchorage 3/4" A325 2" - B SCED Brace - Lower Connection 3/4" A325 3" 4 SCED Brace - Upper Connection 3/4" A325 2 1/2" 4 SCED Lock-Off (to plate on SCED) 3/4" A325 2 1/2" 8 SCED Lock-Off (to gusset plate) 3/4" A325 5" 2 Upper Section Lock-Off (in P8) 3/4" A325 2 1/2" 8 Upper Bumper to Top Plate 3/4" A325 2 1/2" 12 Upper Friction Assembly - Pin through Stiffener 3/4" A325 3 1/2" 2 at EPM A Upper Friction Assembly - Normal Force on Friction Interface 3/4" A325 6 1/4" 2 REVISIONS REV. DESCRIPTION DATE A Pins to be machined. 2010-07-05 B Bolts not needed for lower anchorage 2010-07-22 UNIVERSITY of TORONTO Project Title REV Date Rocking Steel Frame 2 2010/07/05 Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Drawing Title Designer Drawing No. Départment des génies civil, géologique et des mines Bill of Material: Bolts LDW LW05-BM6 Rocking Steel Frame UNIVERSITY of TORONTO Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Départment des génies civil, géologique et des mines Bill of Materials: Stainless Steel Part # Description Page Plate Thickness # Required Material SS1 Long Stainless Steel Sheet PT20 14 ga 4 Stainless Steel Grade 304-2B SS2 Short Stainless Steel Sheet PT20 14 ga 4 Stainless Steel Grade 304-2B UNIVERSITY of TORONTO Project Title REV Date Rocking Steel Frame 1 2010/07/15 Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Drawing Title Designer Drawing No. Départment des génies civil, géologique et des mines Bill of Materials: Stainless Steel LDW LW05-BM7 DSI 0.5" Monostrand Post-Tensioning Upper Segment Assembly A-US (dwg. A2) Upper Bumper Assembly A-B2 (dwg. A15) and Upper Friction Assembly A-F2 (dwg. A17) Side Bumper (both sides: 4 total) SB (dwg. PT19) B Lower Segment Assembly A-LS (dwg. A1) SCED Brace at EPM Lower Bumper Assembly A-B1 (dwg. A14) Side Bumper (both sides: 4 total) and Lower Friction Assembly SB (dwg. PT19) B A-F1 (dwg. A17) A REVISIONS REV. DESCRIPTION DATE Lower PT Anchorage Assembly Foundation plate assembly replaced with A-PTA (dwg. A16) A foundation plate FP1 2010-07-05 C with load cells and 2x Threaded Rod Plate PTP1 (dwg. PT19) B Side bumpers added (8 total) 2010-07-05 Shake Table Surface Foundation Plate C Post-Tensioning Assembly removed 2010-07-05 FP1 (dwg. PT16) UNIVERSITY of TORONTO Project Title REV Date Rocking Steel Frame 7 2010/07/05 Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Drawing Title Designer Drawing No. Départment des génies civil, géologique et des mines Test Setup Summary LDW LW05-TS1 2700 Beam 4 Assembly A-BM4 (dwg. A8) (long end at gusset with brace) A 8 325 A 9 6 8 8 Typical Brace Section 5 2 8 BRT (dwg. PT4) 11 3D VIEW Typical Beam Assembly 8 A-BMT (dwg. A7) 8 (long end at gusset with braces) 25 1 1 8 8 8 Brace 2 Section 5 2 BR2 (dwg. PT4) 11 Beam 1 Assembly A-BM1 (dwg. A8) Bottom Right (long end at gusset with brace) 8 Column Assembly 80 A-C2 (dwg. A4) 13 Bottom Left 8 Column Assembly A-C1 (dwg. A3) 4 7 LOWER SEGMENT ASSEMBLY Beam 0 Assembly A-LS - SCALE 1:50 A-BM0 (dwg. A7) REVISIONS REV. DESCRIPTION DATE Moved top plate assembly to dwgs. A3 & A 2010-07-05 All dimensions in mm [inches] unless otherwise noted A4. UNIVERSITY of TORONTO Project Title REV Date Rocking Steel Frame 7 2010/07/05 Department of Civil Engineering ÉCOLE POLYTECHNIQUE MONTRÉAL Drawing Title Designer Drawing No. Départment des génies civil, géologique et des mines Lower Segment Assembly LDW LW05-A1

Description:
A-M2 - SCALE 1:5. Grind weld surface flush with GMNO so that plate fits through slot in column C2. ALTERNATIVELY: Weld with 12mm fillet on both sides and.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.