ebook img

Andhra Cements Limited DCW PDF

56 Pages·2015·3.6 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Andhra Cements Limited DCW

1 DURGA CEMENT WORKS A Unit of Andhra Cements Limited Gamalapadu (V), Dachepalli (M) Guntur District, Andhra Pradesh. Six monthly compliance report for the period October 2014 to March 2015 to the conditions specified in Environment Clearance granted by MoEF Vide letter no. J- 11011/719/2007-IA II (I) dated 2012.2007. Sl.No. Condition Compliance A. Specific Conditions: i Continuous monitoring system to monitor Continuous monitoring system to gaseous emissions shall be provided and monitor gaseous emissions through limit of SPM shall be controlled within 50 stacks has been working and online real mg/Nm3 by installing adequate air time monitoring data is being pollution control system and data transmitted to APPCB Server & Display submitted to the Ministry's Regional Office board at factory gate regularly. Air at Bangalore, A.P. Pollution Control pollution control equipments like RABH Board (APPCB) and CPCB regularly. installed in Kiln & Raw mill, Bag filter installed in coal mill, ESP installed in cooler. Bag filters installed in cement mills. PM level is maintained below 30 mg/Nm3. Data is being submitted to Ministry's Regional Office at Chennai, A.P. Pollution Control Board (APPCB) and CPCB regularly. Stack emission report is attached as Annexure-A(i). CEMS installed at all majar stacks exhibit at Annexure-A(ii) Photographs of the APCDs are also attached as Annexure-A(iii) ii The company shall install adequate dust Dust collection and extraction system collection and extraction system to control (Bag filters) have been installed to fugitive dust emissions at various transfer control fugitive dust emissions at points, raw mill handling (unloading, various transfer points i.e raw mill conveying, transporting, stacking), handling (unloading, conveying, vehicular movement, bagging and transporting stacking) bagging and packing areas etc. Crusher shall be packing areas etc. Crusher has been operated with high efficiency bag filters. provided with high efficiency bag filters. All conveyers shall be covered with Gl All conveyers are covered. Covered sheets. Covered sheds for storage of raw sheds are provided for storage of raw materials and fully covered conveyers for material such as laterite, coal, gypsum. transportation of materials shall be Cement, Clinker and Fly ash are stored provided besides coal, cement, fly ash in silos. Pneumatic system shall be and clinker shall be stored in silos. used for fly ash handling. List of the Pneumatic system shall be used for fly APCDs are given in Annexure- ash handling. A(iv).Fugitive control measures exhibit at Annexure-A(v) iii Secondary fugitive emissions shall be The secondary fugitive emission is controlled within the latest permissible being controlled by providing dust limits issued by the Ministry and regularly collectors at transfer points, water monitored. Guidelines / Code of Practice spray, covered storage and silo etc as 2 issued by the CPCB shall be followed and per the guidelines of CPCB and is being data submitted to the Ministry's Regional regularly monitored. The ambient air Office at Bangalore, CPCB and APPCB. monitoring data is being submitted to APPCB, CPCB and MOEF regularly. iv Digital processing of the entire lease area IBM (Regional Office) and State Mining using remote sensing technique should department have been approached for be done regularly once in three years for the details and they have been monitoring land use pattern and report requested to forward us the name of the submitted to Ministry of Environment and approved agencies who have been Forests and its Regional Office, conducting Digital processing of Mining Bangalore. area using remote sensing technique. We are committed for compliance. v Regular water sprinkling shall be carried Regular water sprinkling is being carried out in critical areas prone to air pollution out at all pollution prone areas, and having high levels of SPM and RPM conforming the air quality norms as such as haul road, loading and unloading prescribed by the CPCB. Ambient Air points, transfer points and other Monitoring data are enclosed as per vulnerable areas. It shall be ensured that Annexure-A(vi) the ambient air quality parameters conform to the norms prescribed by the Central Pollution Control Board in this regard. vi Vehicular emissions shall be kept under Being complied by taking suitable control and regularly monitored. measures for maintenance of Mine’s Measures shall be taken for maintenance vehicles. The vehicles are not of vehicles used in mining operations and overloaded and are covered with in transportation of mineral. The vehicles tarpaulin as at Annexure-A (vii). shall be covered with a tarpaulin and shall not be overloaded. vii Asphalting/concreting of roads and water Being complied. Photographs are spray all around the stockyard and attached at Annexure-A(viii). loading/unloading areas in the cement plant shall be carried out to control fugitive emissions. viii Total ground water requirement for Water consumption is maintained as cement plant and mining shall not exceed per the APPCB limits. 420 and 60 m3/day (including 56 m3/day No process waste water is discharged mine water) respectively. All the treated outside the factory premises and 'zero' wastewater shall be recycled and reused discharge is maintained. in the process and/or for ash quenching, dust suppression, green belt development and other plant related activities etc. No process wastewater shall be discharged outside the factory premises and 'zero' discharge shall be adopted. ix 'Permission' for the drawl of ground water Permission for the drawl of ground from SGWB / CGWA shall be obtained. water obtained. Copy of the letter is Mined out area shall be developed as provided at Annexure-A (ix). Mined artificial reservoir. The water stored in the area have been developed as artificial artificial reservoir made in the mine pit water reservoir as per Annexure-A (x). shall be used maximum to reduce ground Water collected in artificial reservoir in water consumption. the mine pit is being used to minimize 3 ground water consumption. Sewage treatment plant (STP) shall be Sewage Treatment Plant of capacity x installed for the colony. Treated domestic 300 KLD has been installed for the effluent shall be used for green belt treatment of sewage water of colony development within the plant premises. and plant. . Quality of treated water is Domestic waste from colony and STP within the norms. Treated water is being shall be segregated into bio-degradable used in gardening and dust and non-biodegradable. Bio-degradable suppression. Sludge of STP is being waste shall be composted and non- used as manure. Bio-degradable and biodegradable waste shall be land filled at non bio-degradable waste is being identified sites. ETP should also be treated as directed. STP Photographs provided for workshop and mineral attached as per Annexure- A(xi) separation plant wastewater. xi The project proponent shall ensure that It is ensured that no natural course of no natural watercourse shall be water get obstructed due to any mining obstructed due to any mining operations. operation. xii All the bag filter dust, raw mill dust, coal Systems have been designed and dust, clinker dust and cement dust from installed for recycling and re-use of the pollution control devices shall be recycled dust collected through pollution control and reused in the process and used for devices. Similarly sludge from domestic cement manufacturing. Sludge from sources is being used for green belt domestic sources shall be used as development. Waste oil shall be sold to manure for green belt development. authorized recyclers / pre-processors Waste oil shall be sold to authorized recyclers / preprocessors only. xiii An effort shall be made to use of high System shall be made to use high calorific hazardous waste in the cement calorific hazardous waste in cement kiln and necessary provision shall be kiln. made accordingly. xiv Efforts shall be made to use low grade We are mixing low and high grade lime, more fly ash and solid waste in the Limestone to conserve the natural cement manufacturing. resources. Fly ash will be used for manufacturing PPC. xv Action plan for the mining, management There is no overburden present in our of over burden (removal, storage, mine, as limestone is exposed on the disposal etc.), reclamation of the mined surface. out area and mine closure shall be submitted to the Ministry and its Regional Office at Bangalore. xvi The top soil and solid waste shall be There is no top soil and solid waste in stacked separately at specified dumping our mine. site with proper safeguards. Top soil shall be used for the plantation / green belt development during reclamation and solid waste for backfilling. xvii The over burden (OB), inter burden and There is no overburden, inter burden other waste generated from mines, if any, and other waste generated in our shall be stacked at the earmarked dump mine.100% limestone being used for sites only and should not be kept active cement manufacturing. for long period. Backfilled OB dumps shall be scientifically vegetated with suitable 4 native species to prevent erosion and surface run off. Monitoring and management of reclaimed areas shall continue until the vegetation becomes self-sustaining. Regular compliance shall be submitted to the Ministry and its Regional Office at Bangalore on six monthly basis. xviii The area for external over burden dump Noted, however there is no over burden shall be reduced by suitably increasing in our mine. the height of the dumps with proper terracing. It shall be ensured that the overall slope of the dump does not exceed 28°. xix Garland drains shall be constructed to Noted, however there is no wastes arrest silt and sediment flows from soil. dump generated in our mine. The water so collected shall be used for watering the mine area, haul roads, green belt development etc. The drains shall be regularly de-silted and maintained properly. xx Suitable rainwater harvesting and Rain water is being collected into Mine’s conservation measures to augment pit for further use in the plant. groundwater resources in the area on long term basis shall be planned and implemented in consultation with Regional Director, Central Ground Water Board in cement plant and mining area to augment ground water resources and use for dust suppression and horticulture. xxi Regular monitoring of ground water level Ground water level monitoring has been and quality shall be carried out by regularly carried out 4 times in a year establishing a network of existing wells and water quality analyzed. Abstract of and new peizometers at suitable locations the same is given at Annexure-A (xii). by the project proponent in and around Peizometer is also being installed. project area in consultation with Regional Director, Central Ground Water Board during the mining operation. The ground water monitoring shall be carried out 4 times in a year i.e. pre-monsoon (April- May), monsoon (August), post-monsoon (November) and winter (January) and data thus collected shall be regularly sent to the Ministry, its Regional Office at Bangalore, Central Ground Water Authority and State Ground Water Board, Bangalore. xxii The project proponent shall take No waste water generated in our appropriate mitigative measures to process/plant & mines. Zero discharge prevent pollutions of nearby River and is adopted. other surface water body, if any. 5 xxiii Deep hole wet drilling sequential blasting Wet drilling and sequential blasting method shall be adopted and provision for methods are being applied. The charge the control air emissions during blasting per hole is also adjusted to minimize using dust collectors/ extractors etc. shall ground vibration and to control fly rocks. be made. Blasting operation shall be We are monitoring Ground vibration and carried out during the daytime only and air blast with the help of 'Minimate' one bench at a time shall be blasted. The instrument and keeping records of the mitigative measures for control of ground same. The results are well within the vibrations and to arrest fly rocks and permissible limits specified by DGMS. boulders shall be implemented. 'No We have obtained no objection objection certificate' from the Chief certificate from Chief controller of Controller of Explosives shall be obtained. explosives, in form LE-3 for Explosive Possession and Use. Enclosed copy of License No.E/HQ/AP/22/93(E1673) as Annexure –A(xiii) xxiv Out of total 141.574 ha., green belt shall Cement plant area has already 48 ha of be developed in at least 36 ha. (25 %) in green belt. Tree plantation work in and around the cement plant as per the additional area including Mines is under CPCB guidelines to mitigate the effects of progress. An action plan for green belt air emissions in consultation with local development of Plant and Mines area is DFO. In mining, out of 170.22 ha., given at Annexure –A (xiv) , plantation shall be raised in an area of photographs of tree plantation enclosed 46.72 ha. By planting the native species as per annexure-A(xv) around mining lease area, over burden dumps, around water body, roads etc. in consultation with the local DFO / Agriculture Department. At least, 1,500 trees per year shall be planted with a tree density of 2,000 trees per ha. An action plan shall be submitted in this regard. xxv The void left unfilled shall be converted Our Mine is running mine which will be into water body. The higher benches of converted into water body after excavated void/mining pit shall be completion of life. The maximum bench terraced and plantation done to stabilize height is 8 m which is as per Mining the slopes. The slope of higher benches plan approved by IBM. shall be made gentler for easy accessibility by local people to use the water body. Peripheral fencing shall be carried out along the excavated area. xxvi The project proponent shall take all As per the study made, there is no precautionary measures during mining endangered fauna around the Plant and operation for conservation and protection Mines area. State Forest and Wild life of endangered fauna. Action plan for department, Guntur have been conservation of flora and fauna shall be requested as per Annexure –A (xvi) prepared and implemented in consultation to kindly issue a Certificate mentioning with the State Forest and Wildlife Department. Necessary allocation of that there is no endanger to fauna due funds for implementation of the to our Cement plant and Mining conservation plan shall be made and the 6 funds so allocated shall be included in the activities. project cost. Copy of action plan may be submitted to the Ministry and its Regional office within 3 months from the date of issue of this letter. xxvii A final Mine Closure Plan along with Agreed. Shall be complied. details of Corpus Fund shall be submitted to the Ministry of Environment & Forests 5 years in advance of final mine closure for approval. xxviii Mechanized open casting shall be Agreed. Mechanized open cast mining adopted and no change in mining is adopted and we will take prior technology and scope of working shall be approval of MOEF for any change in made without prior approval of the technology or scope. Ministry of Environment & Forests. xxix Consent to Operate shall be obtained Consent to Operate the mining from APPCB before starting enhanced operation for enhanced production has production from the mine. been obtained & renewed. Mines CFO validity is up to 30 June 2016. Renewed copy of CFO enclosed as Annexure- A (xvii) xxx 'Permission' of the State Forest There is no adverse impact of cement Department shall be obtained regarding plant operation and mining activities on impact of cement plant and mining the surrounding 6 reserve forests. The activities on the surrounding 6 reserve plant and Mines have been running forests viz. Gamalapadu RF (0.1-0.4 km.), since 1984. State Forest department Madinapadu RF (1.2-1.8 km.), Daida RF have been requested to kindly issue (4.7-4.9 km.), Saidulnam RF (3.8-5.0 NOC as per Annexure A (xviii) . km.). Ravipahad RF (5.3-6.6 km.) and Warivabad RF (6.2-6.8 km) and all the recommendations shall be followed. xxxi The company shall obtain necessary Necessary permissions obtained from clearances / approval from the concerned IBM. Letter from IBM enclosed as Departments i.e. Indian Bureau of Mines, Annexure – A (xix). State Government, MoEF etc. for the linked mining component before undertaking any construction activity at the project site. xxxii Rehabilitation and Resettlement Plan for There is no Rehabilitation and the project affected population as per the Resettlement involved in this Project. policy of the State Govt. shall be prepared and implemented. xxiii Acoustic enclosures shall be provided to All Mining machineries provided with control noise wherever necessary. Mine silencers. Sharp bits are being used machine shall be provided with silencers. with wet drilling to reduce noise of Noise shall also be controlled from cooler drilling machine. Drill operators are fans, compressor house, cement mill and provided ear plug. Bottom initiation with raw mill, cement plant and drilling the help of shock tubes and use of machines, excavator, blasting at mine site millisecond delay to reduce noise by using appropriate noise control measures. blasting. Acoustic enclosures in the plant area are used where ever 7 applicable. xxxiv All the safety norms stipulated by the We are implementing all the safety Director General, Mine & Safety (DGMS) norms stipulated by DGMS should be implemented. B General Conditions : i The project authority shall adhere to the Agreed. stipulations made by Andhra Pradesh Pollution Control Board (APPCB) and State Government. ii No further expansion or modification of Agreed. the plant shall be carried out without prior approval of this Ministry. iii The gaseous and particulate matter Being complied. Stack emissions are emissions from various units shall within the norms and inter locking conform to the standards prescribed by facility also provided. the A.P. Pollution Control Board. At no time, the particulate emissions from the cement plant shall exceed APPCB limit. Interlocking facility shall be provided in the pollution control equipment so that in the event of the pollution control equipment not working, the respective unit(s) is shut down automatically. iv One ambient air quality monitoring station Three (3) nos. On line real time shall be installed in downwind direction. CAAQM stations have been installed in Ambient air quality including ambient upwind, downwind and crosswind noise levels shall not exceed the directions. 3rd CAAQM Station is at standards stipulated under EPA or by the Mines area, Online real time State authorities. Monitoring of ambient monitoring data is transmitted to air quality and stack emissions shall be APPCB server & display board at carried out regularly in consultation with factory gate continuously. Four (4) nos APPCB and report submitted to the AAQM stations installed at different APPCB quarterly and to the Ministry's locations & regular ambient air quality Regional Office at Bangalore half-yearly. monitoring done. 3 nos On line real time CAAQM stations exhibited as per Annexure-B (i). Ambient air, Stack emission level monitoring data is regularly submitted to APPCB, CPCB & MoEF. v The company must harvest the rainwater All the water from the roof tops, storm from the rooftops and storm water drains water drains lead to main drains to recharge the ground water and use the connecting to the mines water reservoir. same water for the various activities of Photographs of Rain water harvested at the project to conserve fresh water. mine pit enclosed Annexure-B(ii) The company shall undertake eco A list of eco development measures vi development measures including including community welfare measures community welfare measures in the in the project area is given at Annexure project area. B (iii). vii The overall noise levels in and around the Noise control measures including plant area shall be kept well within the acoustic hoods, silencers. Enclosures 8 standards (85 dBA) by providing noise have been provided. Noise level control measures including acoustic monitoring data enclosed as Annexure hoods, silencers, enclosures etc. on all –B(iv) sources of noise generation. The ambient noise levels shall conform to the standards prescribed under Environmental (Protection) Act, 1986 Ruies, 1989 viz. 75 dBA (day time) and 70 dBA (night time). viii. All recommendations made in the Compliance report of CREP is given at Corporate Responsibility for Environment Annexure B (v) Protection (CREP) for cement plants shall be implemented. ix. Proper housekeeping shall be taken up. Medical checkup camp was organized Regular annual medical examination of all in January’15 & February’2015. the employees shall be carried out from Photographs enclosed at Annexure- the occupational health point of view and B(vi) records maintained. x. A separate environmental management An organization chart of the cell to carry out various management and Environmental Management Cell is monitoring functions shall be set up under given at Annexure B (vii). the control of Senior Executive. xi. As proposed in EIA/EMP. Rs. 28.00 As on date, about Rs. 52.11 crores Crores and Rs. 0.95 Crores earmarked already invested on the air pollution towards the capital cost and recurring equipments which were installed for cost/annum respectively for environment expansion (ie RABH, ESP, Bag House pollution control measures for the cement and nuisance bag filters).Capital cost & plant and Rs. 35.00 Lakhs and Rs. 23.2 Recurring cost data of Plant and Mines Lakhs earmarked towards the capital cost from October 2014 to March 2015 are and recurring cost/annum respectively for attached as Annexure-B (viii) Funds environment pollution control measures provided for the maintenance of the for the mine shall be suitably used to above equipment shall not be diverted implement the conditions stipulated by the for any other purpose. Ministry of Environment and Forests as well as the State Government. The funds so provided shall not be diverted for any other purpose. xii. The Regional Office of this Ministry at Agreed. Six monthly compliance reports Bangalore / CPCB / APPCB shall monitor are regularly being submitted. the stipulated conditions. A six monthly compliance report and the monitored data along with statistical Interpretation shall be submitted to them regularly. xiii. The Project Authorities shall inform the Complied. Regional Office as well as the Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of commencing the land development work. xiv. The Project Proponent shall inform the Complied. public that the project has been accorded 9 environmental clearance by the Ministry and copies of the clearance letter are available with the A. P. Pollution Control Board / Committee and may also be seen at Website of the Ministry of Environment and Forests at http:/envfor.nic.in. This should be advertised within seven days from the date of issue of the clearance letter at least in two local newspapers that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same shall be forwarded to the Regional office at Bangalore. 10

Description:
dust suppression, green belt development and other System shall be made to use high calorific hazardous waste in cement kiln. Black Drongo.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.