ebook img

3 ~ Product Components PDF

55 Pages·2013·2.48 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview 3 ~ Product Components

OUTDOOR ENCLOSURE GRANITE SERIES IV Manual: Part No. NPS-60-0846 PRODUCT MANUAL Network Power Solutions Inc. 5800 Coopers Ave. Mississauga, ON, L4Z 2B9 Tel: (905) 502-6353 Fax: (905) 502-6222 www.npstelecom.com Installation Guide: 1 Granite IV Enclosure This document may not be reproduced or transmitted in any form or by electronic means including photocopying with out the explicit written permission of Network Power Solutions Inc. Information in this document is subject to change without notice. Network Power Solutions Inc. NPS Telecom 5800 Coopers Ave. Mississauga, Ontario. Canada, L4Z 2B9 1-866-822-6111 Tel: (905) 502-6353 Fax: (905) 502-6222 [email protected] www.npstelecom.com Installation Guide: 2 Granite IV Enclosure 3 Installation Guide: Granite IV Enclosure Table of Contents Page 1. Product Information 6-8 1.1 Enclosure Overview……………………………………………………………6-…7 …………..……… 1.2 Product information………………………………………………………………7 …….5 1.3 Mechanical………………………………………………………………………8……….. 1.4 Electrical……………………………………………………………………. 8 1.5 Environmental……………………………………………………………… 8 1.6 Regulatory Approvals……………………………………………………. 8 2. Safety 9-14 2.1 Important Safety Information 9 2.2 General Safety Precautions 10-11 2.3 Electrical Safety 11-12 2.4 Mechanical Safety 12 2.5 Battery Safety 13 2.6 Grounding 14 3. Product Components 15-28 3.1 Product Overview 15 3.2 Product Features 16 3.3 Cabinet Drawing 17-18 3.4 Cooling system 19 3.5 Thermostat controls for DC fan 20 3.6 Insulation Properties Radiant Guard and Foamular Insulation 21-22 3.7 Battery Heater mat 23 3.8 Thermostat controls for AC Battery Heater Man 24 3.9 Bix Punch Block 24 3.10 Air Filter 24 3.11 AC Load Center and Distribution Panel 25 3.12 Outdoor Load Disconnect Center 25 3.13 40 Amp Load Breaker 25 3.14 Load Center 26 3.15 Eltek Valere 48Volt DC Power System ( see attached Manual) 27-28 4 Installation Guide: Granite IV Enclosure Table of Contents 4. Cabinet Installation 29-39 4.1 Tools and Hardware Needed 29 4.2 Standard Insulated Tools and Materials 29 4.3 Site Consideration 30 4.4 Multiple Configurations 30 4.5 Unpacking and Inspections 31 4.6 Cabinet Lifting and Mounting 32-33 4.7 Concrete Pad Mount Site Preperation 33 4.8 Concrete Pad Mount 34 4.9 Pole Mounting 35 4.10 Pole Procedure 36-37 4.11 Pole Mounting Bracket Drawings 38-39 5. Equipment Configuration 40-46 5.1 NSN Configuration Option 1&2 Lay out 40 5.2 Standard AC Wiring 41 5.3 NSN Configuration Option 1 Wire Diagram 42 5.4 NSN Configuration Option 2 Wire Diagram 43 5.5 Huawei Configuration Option 1&2 Lay out 44 5.6 Huawei Configuration Option 1 Wire Diagram 45 5.7 Huawei Configuration Option 2 Wire Diagram 46 6 Batteries 47-50 6.1 Eagle Picher CFR6V58FR-S9 Specification 48 6.2 Battery Installation 49 6.3 Battery Harness connection for DC Generator option 50 6.4 Battery Harness connection for DC Disconnect option 51 7 Parts List 52 8 Notes 53-54 5 Installation Guide: Granite IV Enclosure 1 ~ Product Information 1.1 Enclosure Overview The Granite Outdoor Battery Enclosure is a two cabinet system to house both outdoor telecommunication equipment and VRLA batteries. Fig. 1.1. Figure 1.1 Equipment Cabinet  Part No.: NPS-60-0847  33.0” high x 23.6” wide x 25.6” deep  Weight: 140 lbs. Battery Cabinet  Part No.: NPS-60-0848  20.9” high x 23.6” wide x 25.6” deep  Weight: 75 lbs. 6 Installation Guide: Granite IV Enclosure 1 ~ Product Information 1.1 Enclosure Overview This manual provides a safety guide for installation and routine operation of the Granite IV enclosure. This manual is to be used for 48 Volt battery systems only. This guide may not be complete within it self and should be used in conjunction with the following technical manuals and specifications where each manufacture is being used: •Eltek Valere: MiniPack Installation Manual # 656808.103 •NorthStar Battery: Application Manual and Product Information Manual. •C&D: Tel Series Battery Manual and Product Information Manual. •Eagle Picher: Battery Manual and Product Information Manual. •Kooltronic: AC/Heater Manual or Ice Qube AC/manual 1.2 Product Information The Granite Outdoor Battery Enclosure is a two cabinet system to house both outdoor telecommunication equipment and VRLA batteries. Fig. 1.2 Cabinet “A” Figure 1.2 Equipment Cabinet (A)  Part No.: NPS-60-0847  33.0” high x 23.6” wide x 25.6” deep  Weight: 140 lbs. Cabinet “B” Battery Cabinet (B)  Part No.: NPS-60-0848  20.9” high x 23.6” wide x 25.6” deep  Weight: 75 lbs. 7 Installation Guide: Granite IV Enclosure 1 ~ Product information 1.3 Mechanical Dimensions: 54.0H x 23.5W x 25.5D Weight: 215 lbs. Enclosure: Aluminum Version 5052H32-AluminumThickness - .125” Cooling: 21 capacity DC powered Fans 4.69” diameter / UL94V-) PBT impeller & frame Mounting: Pole mount / Pad, Platform our wall capabilities 1.4 Electrical Input voltage: 120 or 240VAC single phase (air conditioner and heater) Output voltage: +24 or -48VDC Recommended Breaker: 15Amp time delay breaker 1.5 Environmental Outdoor Temperature: -40c to +46c (-40f to +115f) Storage Temperature: -40c to +85c (-40f to + 185f) Humidity: 0 to 95% non-condensing Elevation: -50 meters to 4500 meters operation Weather Rating: NEMA TYPE 3R 1.6 Regulatory Approvals Enclosure Ratings: Indoor/Outdoor Enclosure, Type 3R CSA Rating: Class 3862 13 – Information Technology Equipment –(CSA 60950-1-07, Second Edition) Class 3862 93 Information Technology Equipment- (UL 60950-1, Second Edition-Certified to U.S. Stds. Note: Evaluated to CSA 60950-22-07 CSA Rating applies to Cabinet only. Telcordia: Designed to GR-487 8 Installation Guide: Granite IV Enclosure 2 ~ Safety 2.1 IMPORTANT SAFETY INFORMATION The following safety symbols may be found through this manual and should be carefully read and followed. SHOCK HAZARD – DO NOT TOUCH UN-INSULATED BATTERY, CONNECTORS OR TERMINALS. BE SURE TO DISCHARGE STATIC ELECTRICITY FROM TOOLS AND TECHNICIAN BY TOUCHING A GROUNDED SURFACE IN THE VICINITY OF THE BATTERIES BUT AWAY FROM THE CELLS AND FLAME ARRESTERS. ALL TOOLS SHOULD BE ADEQUATELY INSULATED TO AVOID THE POSSIBILITY OF SHORTING CONNECTIONS. DO NOT LAY TOOLS ON THE TOP OF THE BATTERY. VRLA BATTERIES CONTAIN SULFURIC ACID, WHICH CAN CAUSE SEVERE BURNS. IN CASE OF SKIN CONTACT WITH ELECTROLYTE, REMOVE CONTAMINATED CLOTHING AND FLUSH AFFECTED AREAS THOROUGHLY WITH WATER. IF EYE CONTACT HAS OCCURRED, FLUSH FOR A MINIMUM OF 15 MINUTES WITH LARGE AMOUNTS OF RUNNING WATER AND SEEK IMMEDIATE MEDICAL ATTENTION ALTHOUGH VRLA BATTERIES ARE SEALED, AND EMIT NO GAS DURING NORMAL OPERATION. THEY CONTAIN POTENTIALLY EXPLOSIVE GASES, WHICH MAY BE RELEASED UNDER ABNORMAL OPERATING CONDITIONS, SUCH AS A CHARGER MALFUNCTION. PROVIDE ADEQUATE VENTILATION SO HYDROGEN GAS ACCUMULATION IN THE BATTERY AREA DOES NOT EXCEED TWO PERCENT BY VOLUME. NEVER INSTALL BATTERIES IN A SEALED CABINET OR ENCLOSURE. NORMAL AIR CIRCULATION IN A VENTILATED FACILITY WILL PRECLUDE ANY HYDROGEN UILD-UP, EVEN DURING EQUALIZE CHARGING The following levels of warning will be used with the above symbols: DANGER: YOU WILL BE KILLED OR SERIOUSLY INJURED IF INSTRUCTIONS ARE NOT FOLLOWED CLOSELEY. WARNING: YOU CAN BE KILLED OR SERIOUSLY INJURED IF INSTRUCTIONS ARE NOT FOLLOWED CLOSELY. CAUTION: YOU CAN BE INJURED OR EQUIPMENT CAN BE DAMAGED IF INSTRUCTIONS ARE NOT FOLLOWED CLOSELY. 9 Installation Guide: Granite IV Enclosure

Description:
Huawei Configuration Option 1 Wire Diagram. 45. 5.7. Huawei telecommunication equipment and VRLA batteries. Fig. 1.1 read all the instructions before installation and operation of the equipment . •Remove all conductive jewelry or personal equipment prior to servicing equipment , parts.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.